i
Runwal Group
Filter interviews by
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Sep 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.
Identify the project scope and objectives
Create a project plan with clear timelines and milestones
Assemble a team with the necessary skills and expertise
Assign tasks and responsibilities to team members
Establish communication channels and protocols
Monitor progress and adjust the plan as needed
The initial project requirements include defining project goals, scope, timeline, budget, and team roles.
Define project goals and objectives
Determine project scope and deliverables
Create a project timeline and schedule
Establish a project budget and resource allocation
Assign team roles and responsibilities
Calculate the weight of steel in a structure based on its dimensions and density
Determine the dimensions of the steel components (length, width, height)
Calculate the volume of each steel component using the formula: Volume = Length x Width x Height
Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight
Sum up the weights of all steel components to get the total
posted on 29 Jan 2024
I applied via campus placement at University Vishveshvaraya College of Engineering (UVCE) and was interviewed in Dec 2023. There was 1 interview round.
The density of steel is approximately 7.85 grams per cubic centimeter.
The density of steel is a measure of how much mass is contained in a given volume of steel.
It is commonly expressed in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
The density of steel can vary depending on the specific type and composition of the steel alloy.
For example, the density of carbon steel is typically around 7.85...
Men are dominant in site work due to various societal and cultural factors.
Historically, construction and site work have been male-dominated industries.
Stereotypes and biases have led to fewer women pursuing careers in civil engineering and related fields.
Physical demands and safety concerns associated with site work may discourage some women from entering the field.
Lack of representation and mentorship for women in si...
The project duration can vary depending on the scope, complexity, and resources available.
Project duration is typically determined during the planning phase
Factors such as scope changes, resource availability, and unexpected challenges can impact project duration
It is important to regularly monitor and adjust the project timeline as needed
posted on 27 Dec 2022
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
posted on 9 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
based on 3 reviews
Rating in categories
Assistant Manager
112
salaries
| ₹4 L/yr - ₹10.6 L/yr |
Manager
41
salaries
| ₹6.1 L/yr - ₹15.1 L/yr |
Assistant General Manager
40
salaries
| ₹14 L/yr - ₹28 L/yr |
Junior Engineer
39
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Senior Engineer
32
salaries
| ₹3.5 L/yr - ₹9.5 L/yr |
Godrej Properties
DLF
Sobha
Prestige Group