Runwal Group Site Engineer Interview Questions and Answers

Updated 13 Feb 2025

Runwal Group Site Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Are you worked in mivan shuttering

Interview questions from similar companies

Site Engineer Interview Questions & Answers

DRA Homes user image Nishanth Ganesan Velu

posted on 31 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Density of common material like cement, steel, fine and coarse aggregate
  • Ans. 

    Density of common construction materials varies, with cement around 1440 kg/m3, steel around 7850 kg/m3, fine aggregate around 1600-1750 kg/m3, and coarse aggregate around 1200-1750 kg/m3.

    • Cement density: 1440 kg/m3

    • Steel density: 7850 kg/m3

    • Fine aggregate density: 1600-1750 kg/m3

    • Coarse aggregate density: 1200-1750 kg/m3

  • Answered by AI
  • Q2. Weight of the cube which is made to check the strength of concrete
  • Ans. 

    The weight of the cube used to check the strength of concrete is typically 15 cm x 15 cm x 15 cm and weighs around 29 kg.

    • Standard size of cube for testing concrete strength is 15 cm x 15 cm x 15 cm

    • Weight of the cube is usually around 29 kg

    • The cube is made of concrete from the same batch being tested

  • Answered by AI
  • Q3. Ratio of cement mortar for outer and inner wall plastering
  • Ans. 

    The ratio of cement mortar for outer and inner wall plastering varies depending on the type of wall and desired finish.

    • The ratio of cement mortar for outer wall plastering is usually 1:4 (1 part cement to 4 parts sand).

    • The ratio of cement mortar for inner wall plastering is typically 1:6 (1 part cement to 6 parts sand).

    • However, the ratio can vary based on factors such as the type of wall surface, desired finish, and lo...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your goal and do you know how to achieve?
  • Ans. 

    My goal is to become a proficient Site Engineer by gaining experience, knowledge, and skills in the field.

    • Continuously seek opportunities to learn and improve technical skills

    • Work on various projects to gain practical experience

    • Seek mentorship from experienced engineers

    • Stay updated with industry trends and technologies

    • Obtain relevant certifications to enhance credibility

    • Set specific career milestones to track progress

  • Answered by AI
  • Q2. After 5 to 6 years, what is your position in your field ?
  • Ans. 

    I envision myself as a Senior Site Engineer leading projects and mentoring junior engineers.

    • Leading and managing multiple projects simultaneously

    • Mentoring and training junior engineers

    • Implementing innovative technologies and practices

    • Collaborating with cross-functional teams for successful project delivery

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong on what you know and have to know something about advancement in your field

I applied via Referral and was interviewed in Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Civil structural, finishing and mep. These subjects have to be known.

Interview Preparation Tips

Interview preparation tips for other job seekers - Not only civil any specialization, you have to know civil structural, finishing in details, electrical, plumbing, land scaping all things. Have Knowledge everything.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Qualifications and experience shering me

Interview Preparation Tips

Interview preparation tips for other job seekers - I like their job and rule
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. HR asked about me
Round 3 - Technical 

(2 Questions)

  • Q1. What are the responsibilities of an site engineer??
  • Ans. 

    Site engineers are responsible for overseeing construction projects, managing workers, ensuring safety regulations are followed, and coordinating with various stakeholders.

    • Managing construction projects from start to finish

    • Supervising and coordinating construction workers

    • Ensuring safety regulations and building codes are followed

    • Collaborating with architects, engineers, and subcontractors

    • Preparing and presenting progre

  • Answered by AI
  • Q2. Execution's & Reduce wastage

Interview Preparation Tips

Interview preparation tips for other job seekers - Telling the truth and keeping confidence.
Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. How many types of earthing ?? Ans. There are mainly three types of earthing.
  • Q2. What is the full form of OCB? Ans. The full form of OCB is Oil Circuit Breaker.
  • Ans. 

    OCB stands for Oil Circuit Breaker, a type of circuit breaker that uses oil as the medium for arc extinction.

    • OCB is commonly used in high voltage applications.

    • The oil in OCB helps to extinguish the arc that forms when the circuit breaker interrupts the current flow.

    • OCBs are known for their reliability and ability to handle high current interruptions.

    • Example: A transformer substation may use OCBs for circuit protection.

  • Answered by AI
  • Q3. What is the full form of APFC Panel? Ans. The Full form of APFC is automatic power factor capacitor panel.
  • Ans. 

    APFC Panel stands for Automatic Power Factor Capacitor Panel.

    • APFC Panel is used to improve power factor in electrical systems.

    • It automatically switches capacitors in and out of the circuit to maintain a desired power factor.

    • Helps in reducing electricity bills by avoiding penalties for low power factor.

    • Example: APFC Panel is commonly used in industries and commercial buildings.

    • It helps in optimizing energy usage and red

  • Answered by AI
  • Q4. On what principle does the transformer work? Ans. Transformer works on the principle of mutual induction.

Interview Preparation Tips

Interview preparation tips for other job seekers - Do your work honestly.

Interview Questionnaire 

2 Questions

  • Q1. About real estate
  • Q2. Work pressure

Interview Preparation Tips

Interview preparation tips for other job seekers - Not bad prearersdd fif the confining c.

I applied via Campus Placement and was interviewed before Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical, case study, coding test
  • Q2. Measurements, technical question, civil knowledge, working construction type question

Interview Preparation Tips

Interview preparation tips for other job seekers - Your full ready before go to interviews, good knowledge your culture and spoken language

I applied via Company Website and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. ONLY ABOUT SITE WORKS.

Interview Preparation Tips

Interview preparation tips for other job seekers - Only SITE work Related qs .
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Self introduction and my career details
  • Q2. Its about my previous company details
Round 2 - Technical 

(1 Question)

  • Q1. It's all about my experience based technical questions

Runwal Group Interview FAQs

How many rounds are there in Runwal Group Site Engineer interview?
Runwal Group interview process usually has 1 rounds. The most common rounds in the Runwal Group interview process are Technical.

Tell us how to improve this page.

Runwal Group Site Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Site Engineer Interview Questions from Similar Companies

View all
Runwal Group Site Engineer Salary
based on 30 salaries
₹3.6 L/yr - ₹6.9 L/yr
64% more than the average Site Engineer Salary in India
View more details

Runwal Group Site Engineer Reviews and Ratings

based on 8 reviews

3.6/5

Rating in categories

3.8

Skill development

3.9

Work-life balance

3.7

Salary

4.0

Job security

3.7

Company culture

3.5

Promotions

3.2

Work satisfaction

Explore 8 Reviews and Ratings
Assistant Manager
112 salaries
unlock blur

₹4 L/yr - ₹10.6 L/yr

Manager
43 salaries
unlock blur

₹6.1 L/yr - ₹15.1 L/yr

Assistant General Manager
40 salaries
unlock blur

₹14 L/yr - ₹28 L/yr

Junior Engineer
39 salaries
unlock blur

₹2.4 L/yr - ₹5.5 L/yr

Senior Engineer
33 salaries
unlock blur

₹3.5 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Runwal Group with

Godrej Properties

3.7
Compare

DLF

4.0
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview