Q1. Types building materials, testing of materials,IS codes of rcc concrete earthquake

Ans.

Building materials, testing, and codes for RCC concrete earthquake resistance.

  • Building materials include concrete, steel, wood, and masonry.

  • Testing of materials involves compressive strength, tensile strength, and durability tests.

  • IS codes for RCC concrete earthquake resistance include IS 456:2000, IS 13920:2016, and IS 1893:2016.

  • RCC (Reinforced Cement Concrete) is a composite material made of cement, sand, aggregates, and steel reinforcement.

  • Earthquake-resistant design of RC...read more

View 2 more answers

Q2. Initial and final setting time of cement, testing of cement, main steel ,distribution steel.

Ans.

The question is about cement testing and steel distribution in civil engineering.

  • Initial and final setting time of cement are important parameters to determine the workability of cement.

  • Testing of cement involves various methods such as compressive strength test, fineness test, and soundness test.

  • Main steel refers to the steel bars used in the primary reinforcement of concrete structures.

  • Distribution steel refers to the steel bars used in the secondary reinforcement of concre...read more

Add your answer

Q3. Process of marble flooring and waterproofing in details

Ans.

Marble flooring involves preparation of subfloor, laying of marble tiles and grouting. Waterproofing involves surface preparation, application of waterproofing membrane and finishing.

  • For marble flooring, subfloor should be leveled and cleaned before laying tiles.

  • Marble tiles are laid using adhesive and spacers to ensure even spacing.

  • Grouting is done after tiles are set to fill gaps between tiles.

  • For waterproofing, surface should be cleaned and free of any debris.

  • Waterproofing...read more

Add your answer

Q4. Grade of cement, PCC ,concrete mix

Ans.

Grade of cement, PCC, and concrete mix are important factors in construction.

  • Grade of cement refers to the strength of the cement used in construction.

  • PCC stands for Plain Cement Concrete, which is a mixture of cement, sand, and water.

  • Concrete mix refers to the ratio of cement, sand, and aggregate used in making concrete.

  • The grade of cement used in construction depends on the type of structure and the load it will bear.

  • The ratio of cement, sand, and aggregate in concrete mix ...read more

Add your answer
Discover Pactap interview dos and don'ts from real experiences

Q5. all detail bulding construction

Ans.

Building construction involves the process of planning, designing, and constructing structures.

  • Building construction includes various stages such as site preparation, foundation construction, structural framing, and finishing.

  • It involves the use of materials like concrete, steel, wood, and bricks.

  • Construction techniques and methods vary depending on the type of building, such as residential, commercial, or industrial.

  • Building codes and regulations need to be followed to ensur...read more

Add your answer

Q6. What is procedure for construction in Aluminium Shuttering.

Ans.

Aluminium shuttering is a modern construction technique that involves using interlocking panels made of aluminium to form the walls, floors, and ceilings of a building.

  • The panels are lightweight and easy to handle, making them ideal for use in high-rise buildings and other large-scale construction projects.

  • The panels are pre-fabricated to the required dimensions and are then transported to the construction site.

  • The panels are then assembled on site using a system of interlock...read more

Add your answer

Q7. Superstructure Each Activity Item Rate

Ans.

Superstructure Each Activity Item Rate is a billing method used in construction projects.

  • Superstructure refers to the part of a building above the foundation.

  • Each activity item rate is the cost of a specific task or activity.

  • This billing method calculates the cost of each activity item in the superstructure.

  • Examples of activity items include brickwork, plastering, flooring, etc.

Add your answer

Q8. Are you worked in mivan shuttering

Ans.

Yes, I have worked with Mivan shuttering in previous projects.

  • I have experience in setting up and dismantling Mivan formwork for concrete construction

  • I am familiar with the process of pouring concrete into Mivan shuttering to create walls and slabs

  • I have worked with Mivan system in residential and commercial projects

  • I understand the importance of proper alignment and bracing when using Mivan shuttering

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Pactap

based on 24 interviews
Interview experience
4.0
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.7
 • 343 Interview Questions
4.1
 • 278 Interview Questions
3.7
 • 169 Interview Questions
4.0
 • 158 Interview Questions
4.3
 • 135 Interview Questions
3.4
 • 134 Interview Questions
View all
Top Runwal Group Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter