Upload Button Icon Add office photos

PNC Infratech

Compare button icon Compare button icon Compare

Filter interviews by

PNC Infratech Interview Questions, Process, and Tips

Updated 26 Feb 2025

Top PNC Infratech Interview Questions and Answers

View all 38 questions

PNC Infratech Interview Experiences

Popular Designations

60 interviews found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I appeared for an interview in Mar 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Sir, Can I got Company Details ?
  • Q2. Sir, Can I know Interview process?

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir,
This is with reference to your job requirement the position of SME I am interested in this position and would appreciate your consideration as a candidate for this role. I believe that my skills. qualifications make me a suitable candidate for the job. I'm working @ SAKTHI ASSOCIATES from 2018 June till Know. Currently my project work @EPIL (Engineering Project India Limited) I have completed B.Tech in Civil from Bharath university. I have Experience in Site Engineering 4+ Years . I have Completed project
1.ETP (Effluent Treatment plant )
2.RO ( Reverse Osmosis)
3.Weaving Shead Textile Industry
4.TCL Chinese pvt Ltd
5. Residential building G+ 4
I am confident that my skills will be the right fit for the job Please find the attached CV in the email for further reference.

Thank you for your time and consideration

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (62)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Embankment,Subgrade,GSB, Wmm, DBM, BC
  • Q2. Roads Marking , ROW fix and earth work
  • Q3. MCW, PNP, TCS ,and carriageway width

Interview Preparation Tips

Interview preparation tips for other job seekers - Embankment,Subgrade, GSB,Wmm, DBM,BC
And Road Marking and PNP and TCS and ROW Width

Highway Site Engineer Interview Questions asked at other Companies

Q1. What are the different types of seives for gradation for WMM purpose
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the preventive maintenance
  • Ans. 

    Preventive maintenance is a proactive approach to maintenance that involves regularly scheduled inspections and repairs to prevent equipment breakdowns.

    • Regularly scheduled inspections and maintenance

    • Replacing worn out parts before they fail

    • Cleaning and lubricating machinery

    • Keeping detailed records of maintenance activities

    • Predictive maintenance techniques such as vibration analysis or thermography

    • Implementing a compute

  • Answered by AI
  • Q2. Explain about batch mix plant
  • Ans. 

    A batch mix plant is a type of plant used to produce asphalt, concrete, or other materials in batches.

    • Batch mix plants are commonly used in construction projects to produce small quantities of materials at a time.

    • They are versatile and can be easily transported to different job sites.

    • Batch mix plants typically have separate compartments for storing different materials, such as aggregates, cement, and water.

    • The material...

  • Answered by AI

Top PNC Infratech Mechanical Engineer Interview Questions and Answers

Q1. what is formula to calculate module in gears
View answer (1)

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)

I applied via Company Website and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. 1. Self introduction including qualification
  • Q2. 2. Last job site description,type of project and work details.
  • Q3. 3. Salary deatails and ur demand
  • Q4. 4. Notice period of last job
Round 3 - Technical 

(5 Questions)

  • Q1. Tell me about ur work in last site.
  • Q2. How can u manage ur staff...
  • Q3. Ur project name and project details
  • Q4. Ur responsibility in last site
  • Ans. 

    As a highway engineer, my responsibility in the last site was to oversee the construction of a new highway interchange.

    • Managed a team of construction workers and ensured that the project was completed on time and within budget

    • Reviewed and approved design plans and made necessary adjustments

    • Coordinated with local authorities and stakeholders to ensure compliance with regulations and minimize disruptions to the community

    • ...

  • Answered by AI
  • Q5. Salary details on last site

Interview Preparation Tips

Interview preparation tips for other job seekers - Well prepare before interview... Never behave like its nothing...
Bcz ur 1st impression is ur last impression.

Highway Engineer Interview Questions asked at other Companies

Q1. What is the density of soil in embankment layer.
View answer (7)

PNC Infratech interview questions for popular designations

 Highway Engineer

 (4)

 Junior Engineer Civil

 (4)

 Assistant Engineer

 (3)

 Civil Engineer

 (3)

 Lab Technician

 (2)

 Assistant Store Keeper

 (2)

 Billing Engineer

 (2)

 Mechanical Engineer

 (2)

Surveyor Interview Questions & Answers

user image Anonymous

posted on 10 Jan 2023

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Survey kya hai & outo level se 10m hight per level kese dege
  • Q2. Sarvexan karna &staff ulta karke bs ko RL se gta kr
  • Q3. Noakri se kya karoge

Interview Preparation Tips

Topics to prepare for PNC Infratech Surveyor interview:
  • Oracle 10G
  • Survey
Interview preparation tips for other job seekers - Apna jivan yapan & apni family ki jaruraton ko pura karna

Surveyor Interview Questions asked at other Companies

Q1. How much bench marks important your total station for centre line marking.
View answer (4)

Get interview-ready with Top PNC Infratech Interview Questions

I applied via Approached by Company and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Experience based questions
  • Q2. Questions about Escalation, client billing, reconcile
  • Q3. Why do you change your company
  • Q4. Do you work in remote location
  • Q5. Technical skills based questions

Interview Preparation Tips

Topics to prepare for PNC Infratech Quantity Surveyor interview:
  • Billing
  • Quantity Surveyor Activities
  • Road Estimator
Interview preparation tips for other job seekers - Please Continue in touch with HR department

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

Jobs at PNC Infratech

View all

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 19 Sep 2022

I applied via Recruitment Consulltant and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Flexible pavement and regid pavement
  • Q2. Sub grade and gsb and wmm
  • Q3. Levelling work for Auto level mechine

Interview Preparation Tips

Topics to prepare for PNC Infratech Site Engineer interview:
  • Dbm and Bc
Interview preparation tips for other job seekers - Myself Vinay Prakash Yadav BE Civil Engineering in highway department flexible pavement and regid pavement

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)

I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. SAP software and Store material and pepper work knowledge
  • Q2. SAP t-code and SAP working system knowledge
  • Q3. Store materials and pepper working experience
  • Q4. What do you know about the store and what happens in the store

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard working and good knowledge and company through honestly duty

Assistant Store Keeper Interview Questions asked at other Companies

Q1. What is the differences between Live Wedges & Master Wedges....?
View answer (2)

I applied via Campus Placement and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - HR 

(10 Questions)

  • Q1. I am present joing unnao lalganj project at store supervisor HSD
  • Q2. Before the job of Purvanchal expressway azamgarh weigh bridge trainee 2 year experience
  • Q3. Urgent job of the aligarh ,brij Gopal construction company
  • Q4. Rhne khane ki vyavstha company ki ho paise kat le
  • Q5. Selary kya hogi kante par ya diesal par my mobile number-XXXXX
  • Q6. PNC me job kar rha dun door hai is liye dusari company me job chahta hun
  • Q7. Test le sakte ho ,fon par fir hme pta bta dena document lekar aa jauga
  • Q8. Kanye ki or store me diesal ki jankari hai only
  • Q9. I am poor Brahman boy and urjent should job
  • Q10. Please contact me sir/ medam

Interview Preparation Tips

Interview preparation tips for other job seekers - Aligarh me sir job ho to btana time se selary aati ho mahine vize

Store Officer Interview Questions & Answers

user image Anonymous

posted on 17 Feb 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Regarding work profile , Experience and knowledge

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion Location discussion
  • Q2. What will be your Expected salary

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to learn to work in constructionJoin pnc once in your life and and learn how to do your work

Store Officer Interview Questions asked at other Companies

Q1. Maintaining stock Upload, Issue, Receipt of material in The System Define maximum & minimum stock level for all type materials. Generate nonmoving item list & highlight to concern H.O.D. Monitoring of all incoming material. Maintain... read more
View answer (1)

PNC Infratech Interview FAQs

How many rounds are there in PNC Infratech interview?
PNC Infratech interview process usually has 2-3 rounds. The most common rounds in the PNC Infratech interview process are Technical, Resume Shortlist and HR.
How to prepare for PNC Infratech interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at PNC Infratech. The most common topics and skills that interviewers at PNC Infratech expect are SAP, Civil Engineering, Accounting, Construction and Project Management.
What are the top questions asked in PNC Infratech interview?

Some of the top questions asked at the PNC Infratech interview -

  1. 1. What you understand the requirement of shuttering material at project sit...read more
  2. 2.Do you able to formulate claim raising and defending strategy basis on contra...read more
  3. 3. What do you understand about preliminary drawing, as-built drawing, drawing ...read more
How long is the PNC Infratech interview process?

The duration of PNC Infratech interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

PNC Infratech Interview Process

based on 70 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 750 Interviews
Tata Projects Interview Questions
4.2
 • 445 Interviews
KEC International Interview Questions
4.0
 • 306 Interviews
Dilip Buildcon Interview Questions
4.0
 • 145 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all

PNC Infratech Reviews and Ratings

based on 946 reviews

3.9/5

Rating in categories

3.5

Skill development

3.6

Work-life balance

3.4

Salary

3.8

Job security

3.5

Company culture

3.1

Promotions

3.6

Work satisfaction

Explore 946 Reviews and Ratings
AGM /DGM -Store

Agra

20-25 Yrs

Not Disclosed

Explore more jobs
Assistant Engineer
144 salaries
unlock blur

₹2 L/yr - ₹5.4 L/yr

Junior Engineer
108 salaries
unlock blur

₹1.8 L/yr - ₹4.1 L/yr

Assistant Manager
78 salaries
unlock blur

₹4.8 L/yr - ₹11 L/yr

Store Keeper
51 salaries
unlock blur

₹2.2 L/yr - ₹4 L/yr

Accounts Officer
49 salaries
unlock blur

₹3.2 L/yr - ₹6.6 L/yr

Explore more salaries
Compare PNC Infratech with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview