Upload Button Icon Add office photos

PNC Infratech

Compare button icon Compare button icon Compare

Filter interviews by

PNC Infratech Interview Questions, Process, and Tips

Updated 26 Feb 2025

Top PNC Infratech Interview Questions and Answers

View all 38 questions

PNC Infratech Interview Experiences

Popular Designations

60 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Is code for concrete
  • Ans. 

    Yes, code for concrete refers to the specific mix design used in construction.

    • Code for concrete includes the proportions of cement, aggregates, water, and additives used in a specific mix design.

    • Different codes and standards (such as ACI, ASTM) provide guidelines for designing concrete mixes for different applications.

    • For example, ACI 318 provides requirements for structural concrete used in buildings and other structu

  • Answered by AI
  • Q2. Skew bridge bbs
Round 3 - HR 

(1 Question)

  • Q1. Last company salary slip ;

Interview Preparation Tips

Interview preparation tips for other job seekers - Work on quantity survey , billing and bbs

Assistant Engineer Interview Questions asked at other Companies

Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
View answer (9)

I applied via Apna Jobs and was interviewed in Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Discuss about quality Control work

Round 3 - HR 

(1 Question)

  • Q1. Salary discussion Previous and expected salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir,
I am Arun Kumar Mishra apply to senior lab Technician. Please find my attached information 🙏.

Senior Technician Interview Questions asked at other Companies

Q1. What would you do if the computer is turned off and doesn’t turn on ?
View answer (2)

I was interviewed before Jul 2021.

Round 1 - HR 

(1 Question)

  • Q1. Hi I'm Ranjit Sharma , I hope you’re doing well. I am looking for your help. As I am currently searching for a job, please connect me with HR if there is a vacancy in your company. Please check my profil...
Round 2 - HR 

(2 Questions)

  • Q1. I'm Ranjit Sharma form Allahabad uttarpardesh 5 years experience toll plaza egale Infra Pvt ltd
  • Q2. Information technology

Interview Preparation Tips

Interview preparation tips for other job seekers - I'm Ranjit Sharma Allahabad uttarpardesh 4 years experience egale
Infra Pvt ltd 2 years experience path India ltd (information technology)1 years be shukla toll highways
Experience (information technology)1 years experience
2 years experience by gravity India ltd charkop Mumbai Kandivali
Thanks regards by Ranjit Sharma
Contact no XXXXX

Project Manager Interview Questions asked at other Companies

Q1. What is success & what is failure to you? How do you handle failure? - not much interviewer asks such questions, but I believe these are very important questions, if you want to succeed.
View answer (1)

I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How many PTR engaged at BT laying
  • Ans. 

    I don't have the available data to answer this question.

    • Sorry, I don't have access to the current data on the number of PTR engaged at BT laying.

    • I suggest checking with the relevant department or team for the latest information.

  • Answered by AI
  • Q2. 2 nos are engaged at BT lalying
  • Q3. Crusher make model and process of crushing ?
  • Ans. 

    The crusher make model and process of crushing depend on the type of material being crushed.

    • The make and model of the crusher will vary depending on the application and material being crushed.

    • The process of crushing also varies depending on the material and desired output size.

    • For example, a jaw crusher may be used for primary crushing of hard rock, while a cone crusher is more suitable for secondary or tertiary crushi...

  • Answered by AI
  • Q4. Puzolona 300TPh

Interview Preparation Tips

Interview preparation tips for other job seekers - Concentrate on road construction equipments

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (69)

PNC Infratech interview questions for popular designations

 Highway Engineer

 (4)

 Junior Engineer Civil

 (4)

 Assistant Engineer

 (3)

 Civil Engineer

 (3)

 Lab Technician

 (2)

 Assistant Store Keeper

 (2)

 Billing Engineer

 (2)

 Mechanical Engineer

 (2)

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. I accept salary twenty five thousand

Interview Preparation Tips

Interview preparation tips for other job seekers - I am interested sap data entry operator .

SAP Data Entry Operator Interview Questions asked at other Companies

Q1. How to use SAP software
View answer (1)

Get interview-ready with Top PNC Infratech Interview Questions

Interview Questionnaire 

1 Question

  • Q1. They have asked questions related to ind as financial of highway project
  • Ans. I was well known about BOT, HAM & annuty project and applicable IND as
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for ASM audit, bank loan related queries, IND as etc.

Deputy Manager - Finance Interview Questions asked at other Companies

Q1. What items do you consider while launching new product in terms of finance?
View answer (2)

Jobs at PNC Infratech

View all

I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About Subgrade, W.M.M work, surveying work,etc related to Highway.

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard hard and should learn practical knowledge on any field you were working.

Highway Engineer Interview Questions asked at other Companies

Q1. What is the density of soil in embankment layer.
View answer (7)

Interview Questionnaire 

1 Question

  • Q1. All SAP releated question

Interview Preparation Tips

Interview preparation tips for other job seekers - Pl make better your body language during face to face interview.

Store Executive Interview Questions asked at other Companies

Q1. How to measure the materials like steel and metal
View answer (10)

I applied via Company Website and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Civil engineer questions
  • Q2. Pnc company

Interview Preparation Tips

Interview preparation tips for other job seekers - Building construction and road

Junior Engineer Civil Interview Questions asked at other Companies

Q1. What is your name Where are you from Ratio of M 20 grade concrete. How to find the weight of steel bar used in reinforcement ? How to measurements the concrete volume? Standard size of brick. What is volume of cement bag 50 kg? How to calcu... read more
View answer (2)

Interview Questionnaire 

2 Questions

  • Q1. Work experience
  • Q2. Explain about project worked and speicificatins,finicial

Senior Project Manager Interview Questions asked at other Companies

Q1. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. 120kg pet cum 3:- The 5 no sample... read more
View answer (3)

PNC Infratech Interview FAQs

How many rounds are there in PNC Infratech interview?
PNC Infratech interview process usually has 2-3 rounds. The most common rounds in the PNC Infratech interview process are Technical, Resume Shortlist and HR.
How to prepare for PNC Infratech interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at PNC Infratech. The most common topics and skills that interviewers at PNC Infratech expect are SAP, Civil Engineering, Accounting, Construction and Project Management.
What are the top questions asked in PNC Infratech interview?

Some of the top questions asked at the PNC Infratech interview -

  1. 1. What you understand the requirement of shuttering material at project sit...read more
  2. 2.Do you able to formulate claim raising and defending strategy basis on contra...read more
  3. 3. What do you understand about preliminary drawing, as-built drawing, drawing ...read more
How long is the PNC Infratech interview process?

The duration of PNC Infratech interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

PNC Infratech Interview Process

based on 68 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

GMR Group Interview Questions
4.0
 • 80 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 65 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
View all

PNC Infratech Reviews and Ratings

based on 933 reviews

3.9/5

Rating in categories

3.5

Skill development

3.6

Work-life balance

3.4

Salary

3.8

Job security

3.5

Company culture

3.1

Promotions

3.6

Work satisfaction

Explore 933 Reviews and Ratings
AGM /DGM -Store

Agra

20-25 Yrs

Not Disclosed

AGM/Sr. Manager/Manager - Legal

Agra

15-20 Yrs

₹ 15-20 LPA

Explore more jobs
Assistant Engineer
172 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
111 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
78 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Accountant
50 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Accounts Officer
49 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare PNC Infratech with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview