Filter interviews by
Top trending discussions
posted on 25 Jun 2024
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Reconciliation process of raw material involves comparing the physical inventory with the recorded inventory to identify discrepancies.
Verify the accuracy of raw material receipts and usage records
Compare physical inventory counts with the recorded inventory levels
Investigate and resolve any discrepancies found
Update inventory records accordingly
Implement controls to prevent future discrepancies
I was interviewed before Jan 2024.
What are your strengths and weaknesses?
Group Discussion - Operation & Maintenance
posted on 21 Jul 2024
Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.
Materials can be received through purchase orders placed with suppliers.
Deliveries can be made directly to the storage location or to a designated receiving area.
Materials can also be received through transfers from other departments or locations.
The bas...
Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.
Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.
Document all received items in a log or system for tracking purposes.
Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.
Report any issues or discrepancies to the relevant stakeholders for resolution...
posted on 16 Oct 2024
I applied via Naukri.com and was interviewed before Oct 2023. There were 3 interview rounds.
Accounts un-related topics discussed to show their knowledge in export. Which i not required for me were i was engaged
Nothing to say worst
Negotiable based on the responsibilities and benefits offered by the company.
Salary expectations are flexible and dependent on the specific responsibilities and benefits provided by the company.
Open to discussing salary range during the interview process.
Seeking a competitive salary that aligns with industry standards and my level of experience.
Looking for a compensation package that includes benefits such as healthcar...
posted on 14 Dec 2022
I applied via Approached by Company and was interviewed before Aug 2023. There were 2 interview rounds.
Discussion about my working and experience on site
There were three main structures in my last project: a database structure, a software architecture structure, and a project management structure.
Database structure included tables, relationships, and indexes.
Software architecture structure involved layers, components, and modules.
Project management structure consisted of timelines, tasks, and resources.
There were a total of 10 type foundation castings in my last project.
There were different types of foundation castings used in the project such as pile foundation, strip foundation, and raft foundation.
Each type of foundation casting was used based on the specific requirements of the structure and soil conditions.
The number of each type of foundation casting was determined by the structural design and engineering calcu
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
posted on 22 Dec 2021
The revenue recognition standard for the construction industry is Ind AS 115, while for the manufacturing industry it is Ind AS 18.
For the construction industry, Ind AS 115 provides guidance on when to recognize revenue from contracts with customers.
Under Ind AS 115, revenue is recognized over time using the percentage of completion method or at a point in time when control of the asset is transferred to the customer.
F...
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Engineer
170
salaries
| ₹2 L/yr - ₹6 L/yr |
Junior Engineer
106
salaries
| ₹2 L/yr - ₹4.1 L/yr |
Assistant Manager
80
salaries
| ₹4.8 L/yr - ₹12.5 L/yr |
Highway Engineer
54
salaries
| ₹2.7 L/yr - ₹7.2 L/yr |
Accountant
50
salaries
| ₹1.9 L/yr - ₹8.3 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
Simplex Infrastructures