To maintain a slope in a hill cutting location, proper drainage, erosion control measures, and stabilization techniques must be implemented.
Ensure proper drainage to prevent water accumulation and erosion
Implement erosion control measures such as retaining walls, geotextiles, and vegetation
Stabilize the slope using techniques like terracing, soil nailing, or rock bolting
Regularly inspect and maintain the slope to addre...
I have 5 years of experience as a Highway Engineer, working on various road construction and maintenance projects.
Worked on designing and implementing road infrastructure projects
Managed construction and maintenance activities
Collaborated with government agencies and contractors
Performed site inspections and ensured compliance with safety regulations
Analyzed traffic patterns and proposed improvements
Used software and t...
I applied via Naukri.com
According to the topic
Some projects needful for you
Presence of mind
Knowledge of me in this field
posted on 8 May 2023
I applied via Company Website and was interviewed before May 2022. There were 3 interview rounds.
I have 10 years of experience in highway engineering.
I have worked on various highway projects including design, construction, and maintenance.
I have experience in managing teams and coordinating with clients and stakeholders.
I have knowledge of relevant software and regulations such as AutoCAD and AASHTO standards.
I have also conducted research and analysis on traffic flow and safety measures.
Overall, my experience ha...
Looking for new challenges and opportunities to grow professionally.
Seeking a more challenging role
Desire to work on larger projects
Opportunity for professional growth
Company culture not aligned with personal values
Lack of job security or stability
PQC, DLC, and GSB are all types of road construction materials.
PQC stands for Pavement Quality Concrete and is a type of concrete used for road surfaces.
DLC stands for Dry Lean Concrete and is a type of concrete used as a base layer for road construction.
GSB stands for Granular Sub Base and is a layer of compacted granular material used as a foundation for road construction.
All three materials are commonly used in road...
GSB Gradation is a method of grading aggregates used in road construction.
GSB stands for Granular Sub-Base.
It is a method of grading aggregates based on their particle size.
The gradation is important for ensuring proper compaction and stability of the road.
The gradation is specified in terms of percentage passing different sieve sizes.
For example, GSB 20 gradation means that 100% of the aggregates pass through a 20mm s
Rigid pavements are made of concrete while flexible pavements are made of asphalt.
Rigid pavements have high flexural strength and low deflection while flexible pavements have low flexural strength and high deflection.
Rigid pavements are more durable and have a longer lifespan than flexible pavements.
Flexible pavements are easier and cheaper to construct and maintain than rigid pavements.
Examples of rigid pavements incl...
No GD
I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.
posted on 24 Jun 2021
I applied via Walk-in and was interviewed before Jan 2021. There were 4 interview rounds.
Interview experience
based on 3 reviews
Rating in categories
Assistant Engineer
175
salaries
| ₹2 L/yr - ₹6 L/yr |
Junior Engineer
108
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Assistant Manager
63
salaries
| ₹5 L/yr - ₹12.5 L/yr |
Highway Engineer
54
salaries
| ₹2.7 L/yr - ₹7.2 L/yr |
Accounts Officer
51
salaries
| ₹3.2 L/yr - ₹6.6 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
Simplex Infrastructures