The project was completed on time and within budget.
The project was completed on the scheduled completion date.
All deliverables were completed and handed over to the client.
The project was completed within the allocated budget.
Regular progress reports were provided to the client to ensure transparency and accountability.
Any issues or delays were promptly addressed and resolved to ensure timely completion.
Teamwork and following safety procedures and keepup schedule date project finishing stage
Top trending discussions
posted on 20 Aug 2023
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.
Understanding of steel types and grades, development length, BBS, concrete testing, IS codes, de-shuttering time, mix design, admixtures, etc.
Steel types and grades like Fe550 and Fe550D differ in their ductility and strength properties
Development length is the length of bar required for full development of stress in reinforcement
BBS (Bar Bending Schedule) is a detailed list of reinforcement bars with their shapes, siz...
If compressive strength test of concrete fails, investigate potential causes like incorrect mix proportions or curing methods. Testing at 3, 7, and 28 days allows for monitoring strength development over time.
Investigate potential causes of failure such as incorrect mix proportions, improper curing methods, or testing errors
Consider retesting samples to confirm results and identify any discrepancies
Testing at 3 days pr...
I applied via Approached by Company
posted on 20 Oct 2024
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
The goal of an aptitude test is to predict the ability to learn new skills
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
A beam is a structural element that is designed to resist loads applied perpendicular to its longitudinal axis.
Beams are commonly used in construction to support loads over a span.
They can be made of various materials such as wood, steel, or concrete.
Beams can be classified based on their shape, such as I-beams, H-beams, or T-beams.
The design of a beam takes into account factors like span length, load requirements, and
King post and queen post are both types of trusses used in construction, with king post being a simpler design and queen post being a more complex design.
King post is a simple vertical member in a truss, while queen post is a pair of vertical members connected by a horizontal member.
Queen post trusses are stronger and can span longer distances compared to king post trusses.
King post trusses are commonly used in small s...
posted on 19 Aug 2024
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
posted on 14 Nov 2023
I applied via Naukri.com
J.kumar metro project is a major infrastructure project involving construction of metro rail system.
J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.
The project involves various stages such as planning, design, construction, and implementation.
It may include tasks like excavation, tunneling, track laying, station construction, etc.
The project requires coordination wi...
I applied via Naukri.com and was interviewed in Nov 2023. There were 7 interview rounds.
Compressive strength of cube
All test all tests quality control
Bitumen, Aggregate test, cement test,????
Coding test all questions
All tests quality control in Lab engineering
posted on 14 Feb 2024
Some of the top questions asked at the Nagarjuna Construction Company Senior Civil Site Engineer interview -
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Junior Engineer
885
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
631
salaries
| ₹2.4 L/yr - ₹9 L/yr |
Senior Engineer
433
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Junior Engineer Civil
387
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Assistant Engineer - Civil
292
salaries
| ₹3.3 L/yr - ₹8.9 L/yr |
Larsen & Toubro Limited
TCS
Infosys
Tech Mahindra