posted on 18 Apr 2023
I applied via Walk-in and was interviewed in Mar 2023. There were 3 interview rounds.
Primavera P6 is a project management software that uses critical path method to schedule activities and track progress.
Primavera P6 is a tool used for project planning, scheduling, and control.
It uses critical path method to calculate the longest path of planned activities to determine the project's duration.
It allows users to create a project schedule, assign resources, track progress, and analyze data.
It also has fea...
posted on 21 Jun 2021
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
The HR compliance in RA Bill refers to the adherence to the human resources regulations and requirements outlined in the bill.
The RA Bill may include provisions related to employee rights, workplace safety, equal opportunity, and fair employment practices.
HR compliance ensures that organizations follow these regulations to protect the rights and well-being of their employees.
Examples of HR compliance in the RA Bill may...
posted on 11 Sep 2024
I applied via Campus Placement
Mix of Maths and English of basics
Group discussion on general topic
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
The planning initiation process involves defining the project scope, objectives, and deliverables.
Identify the need for planning
Define the project scope, objectives, and deliverables
Identify key stakeholders and their roles
Establish a project team
Develop a project charter or initiation document
Conduct a feasibility study
Identify risks and constraints
Define the planning timeline and milestones
The scheduling process involves considering durations in relation to productivity.
The scheduling process starts by identifying the tasks that need to be completed.
The duration of each task is estimated based on historical data or expert judgment.
Productivity levels are taken into account when determining the duration of tasks.
Factors such as employee skills, equipment availability, and potential bottlenecks are conside...
The productivity norms in planning management vary across industries and sites.
Productivity norms in planning management are specific to each industry and site.
These norms are determined based on factors such as the nature of work, resources available, and industry standards.
For example, in the manufacturing industry, the productivity norm for planning managers may be measured in terms of units produced per hour.
In the...
Trackers are prepared for site tracking and schedule upgradation.
Trackers are tools used to monitor and track progress on a site or project.
They help in keeping track of tasks, deadlines, and milestones.
Trackers can be in the form of spreadsheets, software, or project management tools.
They provide visibility into the status of various activities and help in identifying bottlenecks or delays.
Upgradation of schedules inv...
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Free float is the amount of time an activity can be delayed without delaying the project, while total float is the amount of time an activity can be delayed without delaying the successor activity.
Free float is specific to an activity, while total float is related to the entire project schedule.
Free float is calculated by subtracting the early start of the activity from the early start of the successor activity, while ...
Time limited projects have fixed deadlines while resource limited projects have fixed resources.
Time limited projects require completion by a specific deadline.
Resource limited projects have a fixed amount of resources available.
Balancing time and resources is crucial for project success.
Example: A construction project with a deadline to finish before winter (time limited) vs a project with a fixed budget (resource lim
based on 1 review
Rating in categories
Junior Engineer
1k
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
587
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Junior Engineer Civil
446
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Engineer
353
salaries
| ₹4 L/yr - ₹11 L/yr |
Civil Site Engineer
260
salaries
| ₹1.9 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys