Filter interviews by
The number of tests for soil material samples varies depending on the specific requirements and standards.
The number of tests for soil material samples can range from a few basic tests to more comprehensive testing depending on the project requirements.
Common tests for soil material samples include moisture content, particle size distribution, compaction, and strength tests.
The number of tests may also depend on the ty...
I applied via Walk-in and was interviewed before Jan 2024. There were 2 interview rounds.
The consumption of cement for M-15 grade PCC per cubic meter is typically around 240 kg.
The consumption of cement for M-15 grade PCC is usually around 240 kg per cubic meter.
This value may vary slightly based on factors such as mix design and site conditions.
It is important to accurately calculate the quantity of cement needed to ensure the strength and durability of the concrete.
For example, for a 1 cubic meter of M-1...
Used filter media are materials used in filtration systems to remove impurities from water or air.
Sand
Activated carbon
Zeolite
Anthracite
Gravel
Assignment test and practical knowledge
I applied via Indeed and was interviewed before Nov 2023. There were 2 interview rounds.
LCC Projects interview questions for popular designations
I applied via Walk-in and was interviewed in Dec 2023. There were 3 interview rounds.
I applied via Referral and was interviewed in Feb 2024. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2023. There were 3 interview rounds.
I applied via LinkedIn and was interviewed in Feb 2023. There was 1 interview round.
To calculate a BBS for footing, you need to determine the size and spacing of reinforcement bars required for the footing construction.
Calculate the total area of the footing
Determine the design requirements for the footing (such as load capacity)
Select the appropriate size and spacing of reinforcement bars based on design requirements
Calculate the total length of reinforcement bars needed for the footing
Prepare a deta...
Nominal cover for pipeline refers to the minimum thickness of concrete cover over the reinforcement in a pipeline.
Nominal cover is typically specified in project specifications or design drawings.
The purpose of nominal cover is to protect the reinforcement from corrosion and provide durability to the pipeline.
The nominal cover for pipelines can vary depending on factors such as the type of pipeline, environmental condi...
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
Top trending discussions
The duration of LCC Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 25 interviews
Interview experience
based on 167 reviews
Rating in categories
Senior Engineer
42
salaries
| ₹3.5 L/yr - ₹7.8 L/yr |
Site Engineer
30
salaries
| ₹2.6 L/yr - ₹6 L/yr |
Civil Site Engineer
23
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Junior Engineer
14
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Civil Engineer
14
salaries
| ₹2 L/yr - ₹9.8 L/yr |
Tata Projects
Larsen & Toubro Limited
Hindustan Construction Company
Shapoorji Pallonji Group