Upload Button Icon Add office photos

Filter interviews by

LCC Projects Interview Questions and Answers

Updated 20 Feb 2025

LCC Projects Interview Experiences

Popular Designations

16 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Tell about your work, in which field you're into in.
  • Q2. In execution, planning, billing, coordination etc.
  • Q3. How confident you're into in billing work?
  • Q4. What's the value of your current assignment?
  • Q5. What's your experience in scheduling?

Senior Billing Engineer Interview Questions asked at other Companies

Q1. Are you familiar with Rate Analysis? Prepare a rate analysis for blockwork
View answer (2)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Full form of HDPE Pipe
  • Ans. 

    HDPE stands for High-Density Polyethylene.

    • HDPE is a type of plastic pipe commonly used in various applications.

    • It is known for its high strength, durability, and resistance to corrosion.

    • HDPE pipes are widely used in water supply systems, sewage systems, gas distribution networks, and industrial applications.

    • They are lightweight, flexible, and easy to install.

    • HDPE pipes have a long service life and are environmentally f...

  • Answered by AI
  • Q2. FHTC full form & How to install connection for tap
  • Ans. 

    FHTC stands for Flexible High Temperature Cable. To install connection for tap, follow these steps:

    • Turn off the water supply to the tap

    • Remove the existing tap connection

    • Clean the area around the tap connection

    • Apply plumber's tape to the threaded end of the tap connection

    • Insert the tap connection into the water supply line

    • Tighten the connection using a wrench

    • Turn on the water supply and check for any leaks

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Know about FLOW CHART OF WTP& function OF FILTER BED & Know about Pump Head

Senior Civil Engineer Interview Questions asked at other Companies

Q1. Why reinforcement is provided alternative in column?
View answer (5)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Asked about why looking for job change
  • Q2. Asked about current ctc
  • Q3. Asked about job location
Round 3 - Technical 

(3 Questions)

  • Q1. Asked about past experience
  • Q2. Asked about technical questions
  • Q3. Asked about technical issues handling

Interview Preparation Tips

Topics to prepare for LCC Projects Senior Engineer interview:
  • Project Management
  • Project Planning
  • Technical
Interview preparation tips for other job seekers - Be confident and also be ready for hard work ,,, bcoz hard work always pay off.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (58)

I applied via Indeed and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic salary related questions
Round 3 - Technical 

(2 Questions)

  • Q1. Concrete freefall, concrete test
  • Q2. Aggregate test, Gravity dam components

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare academic basics, for experience people all questions are related with experience

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)

LCC Projects interview questions for popular designations

 Senior Civil Engineer

 (3)

 Senior Engineer

 (2)

 Senior Billing Engineer

 (1)

 HR Executive

 (1)

 Executive Officer

 (1)

 Civil Engineer

 (1)

 Quantity Survey Engineer

 (1)

 Billing Engineer

 (1)

Interview Questionnaire 

1 Question

  • Q1. Why is heat in concrete ?
  • Ans. 

    Heat is generated in concrete due to exothermic chemical reactions during the hydration process.

    • Heat is generated during the chemical reaction between cement and water.

    • The heat generated can cause thermal expansion and cracking in concrete.

    • The amount of heat generated depends on the type of cement used and the curing conditions.

    • Heat can be controlled by using low-heat cement or by cooling the concrete during curing.

    • Hea...

  • Answered by AI

Senior Civil Engineer Interview Questions asked at other Companies

Q1. Why reinforcement is provided alternative in column?
View answer (5)

I applied via Walk-in and was interviewed before May 2021. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Introduction, and experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and share your genuine detail.

Executive Officer Interview Questions asked at other Companies

Q1. Data Manipulation: "How would you use Excel to analyze a large dataset? Can you explain how you would filter, sort, and summarize the data?" Formulas and Functions: "What are some common Excel functions you use for data analysis? Can you gi... read more
View answer (2)

Jobs at LCC Projects

View all

LCC Projects Interview FAQs

How many rounds are there in LCC Projects interview?
LCC Projects interview process usually has 2 rounds. The most common rounds in the LCC Projects interview process are Technical, HR and Resume Shortlist.
How to prepare for LCC Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at LCC Projects. The most common topics and skills that interviewers at LCC Projects expect are Coordination, Cost Estimation, Irrigation, Budgeting and Follow Ups.
What are the top questions asked in LCC Projects interview?

Some of the top questions asked at the LCC Projects interview -

  1. FHTC full form & How to install connection for ...read more
  2. What is the nominal cover for pipel...read more
  3. What is no. Of test for soil Matairial sam...read more
How long is the LCC Projects interview process?

The duration of LCC Projects interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

LCC Projects Interview Process

based on 26 interviews

Interview experience

3.9
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 433 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Essar Group Interview Questions
3.7
 • 28 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

LCC Projects Reviews and Ratings

based on 178 reviews

4.2/5

Rating in categories

3.7

Skill development

3.8

Work-life balance

4.1

Salary

3.7

Job security

3.9

Company culture

3.7

Promotions

3.8

Work satisfaction

Explore 178 Reviews and Ratings
Manager-Budgeting || Ahmedabad

Ahmedabad

5-10 Yrs

Not Disclosed

Company Secretary // Head Office Ahmedabad

Ahmedabad

4-9 Yrs

Not Disclosed

Explore more jobs
Senior Engineer
43 salaries
unlock blur

₹3.5 L/yr - ₹7.8 L/yr

Site Engineer
31 salaries
unlock blur

₹2.6 L/yr - ₹6 L/yr

Civil Site Engineer
23 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Junior Engineer
15 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Billing Engineer
15 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Explore more salaries
Compare LCC Projects with

Tata Projects

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Hindustan Construction Company

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview