Filter interviews by
The number of tests for soil material samples varies depending on the specific requirements and standards.
The number of tests for soil material samples can range from a few basic tests to more comprehensive testing depending on the project requirements.
Common tests for soil material samples include moisture content, particle size distribution, compaction, and strength tests.
The number of tests may also depend on the ty...
I applied via Naukri.com and was interviewed before May 2018. There were 5 interview rounds.
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
Medium range tough questions were asked
HIRA stands for Hazard Identification and Risk Assessment. There are four types of fires: Class A, B, C, and D.
HIRA is a process of identifying potential hazards and assessing the risks associated with them.
It involves identifying the hazards, evaluating the risks, and implementing control measures to mitigate the risks.
Class A fires involve ordinary combustibles like wood, paper, and cloth.
Class B fires involve flamma...
Acts used in safety include preventive, corrective, detective, and compensatory measures.
Preventive measures aim to avoid accidents or incidents from happening, such as safety training, equipment maintenance, and hazard identification.
Corrective measures are taken after an accident or incident has occurred, such as first aid, repairs, and investigations.
Detective measures involve monitoring and identifying potential ha...
I applied via Company Website and was interviewed before Mar 2022. There was 1 interview round.
The manufacturing of cement involves chemical reactions with water, resulting in the durability of concrete.
Cement is made by heating limestone, clay, and other materials in a kiln
The chemical reaction between cement and water, known as hydration, results in the hardening of concrete
The durability of concrete depends on factors such as the water-cement ratio, curing time, and quality of materials used
Calculate deflection at free end of cantilever beam with point load at end
Use the formula: δ = (PL³)/(3EI)
P is the point load at the end
L is the length of the cantilever beam
E is the modulus of elasticity of the beam material
I is the moment of inertia of the beam's cross-sectional area
Example: A steel cantilever beam with a length of 2 meters and a point load of 500 N at the end has a deflection of 0.104 mm
Camber is the slope provided to the road surface to drain off rainwater. It is achieved by raising the center of the road surface.
Camber is the curvature provided to the road surface to ensure proper drainage of rainwater.
It is achieved by raising the center of the road surface.
The amount of camber depends on the width of the road and the expected rainfall.
The steps for the construction of a road include surveying, cle...
Admixtures are chemicals added to concrete to enhance its properties. They affect the workability, strength, and durability of concrete.
Admixtures are added to concrete to improve its quality and performance.
They can affect the setting time, workability, strength, and durability of concrete.
Examples of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers.
Hoop stress is the stress exerted circumferentially in a cylindrical or spherical object. Reinforcement in a dome can be provided by using steel bars or mesh.
Hoop stress is caused by the pressure inside the object and is calculated using the formula P*r/t, where P is the pressure, r is the radius, and t is the thickness of the object.
In a dome, reinforcement can be provided by using steel bars or mesh that are placed i...
Estimation and costing involves calculating the expenses of a project. No. of bricks required in 1 m3 of brickwork depends on the size of the bricks. There are various types of contracts in construction.
Estimation and costing involves calculating the expenses of a project, including materials, labor, and other costs.
No. of bricks required in 1 m3 of brickwork depends on the size of the bricks used. For example, if stan...
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Senior Engineer
43
salaries
| ₹3.5 L/yr - ₹7.8 L/yr |
Site Engineer
31
salaries
| ₹2.6 L/yr - ₹6 L/yr |
Civil Site Engineer
23
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Billing Engineer
15
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Junior Engineer
15
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Quess
L&T Construction
Ekart Logistics
Udaan