Filter interviews by
I applied via Walk-in and was interviewed before Jan 2024. There were 2 interview rounds.
The consumption of cement for M-15 grade PCC per cubic meter is typically around 240 kg.
The consumption of cement for M-15 grade PCC is usually around 240 kg per cubic meter.
This value may vary slightly based on factors such as mix design and site conditions.
It is important to accurately calculate the quantity of cement needed to ensure the strength and durability of the concrete.
For example, for a 1 cubic meter of M-1...
Used filter media are materials used in filtration systems to remove impurities from water or air.
Sand
Activated carbon
Zeolite
Anthracite
Gravel
HDPE stands for High-Density Polyethylene.
HDPE is a type of plastic pipe commonly used in various applications.
It is known for its high strength, durability, and resistance to corrosion.
HDPE pipes are widely used in water supply systems, sewage systems, gas distribution networks, and industrial applications.
They are lightweight, flexible, and easy to install.
HDPE pipes have a long service life and are environmentally f...
FHTC stands for Flexible High Temperature Cable. To install connection for tap, follow these steps:
Turn off the water supply to the tap
Remove the existing tap connection
Clean the area around the tap connection
Apply plumber's tape to the threaded end of the tap connection
Insert the tap connection into the water supply line
Tighten the connection using a wrench
Turn on the water supply and check for any leaks
Heat is generated in concrete due to exothermic chemical reactions during the hydration process.
Heat is generated during the chemical reaction between cement and water.
The heat generated can cause thermal expansion and cracking in concrete.
The amount of heat generated depends on the type of cement used and the curing conditions.
Heat can be controlled by using low-heat cement or by cooling the concrete during curing.
Hea...
Top trending discussions
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before May 2018. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
based on 2 interviews
Interview experience
based on 5 reviews
Rating in categories
Senior Engineer
40
salaries
| ₹3.5 L/yr - ₹7.8 L/yr |
Site Engineer
31
salaries
| ₹2.6 L/yr - ₹6 L/yr |
Civil Site Engineer
23
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Billing Engineer
15
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Junior Engineer
15
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Quess
L&T Construction
Ekart Logistics
Udaan