Upload Button Icon Add office photos

Filter interviews by

LCC Projects Senior Civil Engineer Interview Questions, Process, and Tips

Updated 6 Jan 2025

Top LCC Projects Senior Civil Engineer Interview Questions and Answers

LCC Projects Senior Civil Engineer Interview Experiences

3 interviews found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Full form of HDPE Pipe
  • Ans. 

    HDPE stands for High-Density Polyethylene.

    • HDPE is a type of plastic pipe commonly used in various applications.

    • It is known for its high strength, durability, and resistance to corrosion.

    • HDPE pipes are widely used in water supply systems, sewage systems, gas distribution networks, and industrial applications.

    • They are lightweight, flexible, and easy to install.

    • HDPE pipes have a long service life and are environmentally f...

  • Answered by AI
  • Q2. FHTC full form & How to install connection for tap
  • Ans. 

    FHTC stands for Flexible High Temperature Cable. To install connection for tap, follow these steps:

    • Turn off the water supply to the tap

    • Remove the existing tap connection

    • Clean the area around the tap connection

    • Apply plumber's tape to the threaded end of the tap connection

    • Insert the tap connection into the water supply line

    • Tighten the connection using a wrench

    • Turn on the water supply and check for any leaks

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Know about FLOW CHART OF WTP& function OF FILTER BED & Know about Pump Head
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Conjmption of cement m-15 grade pcc per cum
  • Ans. 

    The consumption of cement for M-15 grade PCC per cubic meter is typically around 240 kg.

    • The consumption of cement for M-15 grade PCC is usually around 240 kg per cubic meter.

    • This value may vary slightly based on factors such as mix design and site conditions.

    • It is important to accurately calculate the quantity of cement needed to ensure the strength and durability of the concrete.

    • For example, for a 1 cubic meter of M-1...

  • Answered by AI
  • Q2. What are used filter media
  • Ans. 

    Used filter media are materials used in filtration systems to remove impurities from water or air.

    • Sand

    • Activated carbon

    • Zeolite

    • Anthracite

    • Gravel

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Salery discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Good irrigation growing company your skills used. Not any other dislike issue overall good company.

Senior Civil Engineer Interview Questions Asked at Other Companies

Q1. Why reinforcement is provided alternative in column?
Q2. How much accepted 8mm to 10mm steel rod rolling margine value ?
Q3. Do you have idea about safety and safety rules at L&T?
asked in Dr. Reddy's
Q4. What is the estimated cost of 100 feet by 100 feet of office in t ... read more
Q5. What is the slump range for boom pressure?

Interview Questionnaire 

1 Question

  • Q1. Why is heat in concrete ?
  • Ans. 

    Heat is generated in concrete due to exothermic chemical reactions during the hydration process.

    • Heat is generated during the chemical reaction between cement and water.

    • The heat generated can cause thermal expansion and cracking in concrete.

    • The amount of heat generated depends on the type of cement used and the curing conditions.

    • Heat can be controlled by using low-heat cement or by cooling the concrete during curing.

    • Hea...

  • Answered by AI

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I was interviewed in Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Formwork and steel productivity
  • Q2. Steel is 150 kg and Formwork is 175kg/sqmt. Per person per day.

Interview Preparation Tips

Interview preparation tips for other job seekers - Study what is going on site
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Nov 2023.

Round 1 - Group Discussion 

Discussion about planing, sheduling, exicution, cordination

Round 2 - Technical 

(3 Questions)

  • Q1. Strength and Quality work
  • Q2. Planing and avhieve target
  • Q3. Good Cordination
Round 3 - Technical 

(1 Question)

  • Q1. Iprovement vision technicaly
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Development lengh, lap zone
  • Q2. Grades of steel, fe500D means,
  • Ans. 

    Fe500D is a grade of steel used in construction, indicating its yield strength in megapascals.

    • Fe500D is a type of steel used in construction with a yield strength of 500 megapascals.

    • The 'Fe' stands for iron, while the '500' indicates the yield strength in megapascals.

    • The 'D' in Fe500D signifies that it is a ductile steel grade.

    • Fe500D steel is commonly used in reinforced concrete structures for its high strength and duc

  • Answered by AI
  • Q3. Concrete tests, nominal mix, design mix, de shuttering time, binding wire, BBS, shuttering measurements,
  • Q4. Cube test, slump value, flow test, material wastage allowable limit, productivity of workman etc
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Current salary, expected salary, notice period

Interview Preparation Tips

Interview preparation tips for other job seekers - L&T Good company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What is the quantity of cement in m35 mix
  • Ans. 

    The quantity of cement in M35 mix is typically around 420 kg/m3.

    • The proportion of cement in M35 mix is usually 1:1.5:3 (cement:sand:aggregate)

    • For 1 cubic meter of M35 mix, the cement required is approximately 420 kg

    • The exact quantity may vary based on specific project requirements and mix design

  • Answered by AI
  • Q2. Use of tremie pipe
  • Ans. 

    A tremie pipe is used in construction to place concrete underwater without washing out the cement content.

    • Tremie pipe is a long pipe with a hopper at the top for pouring concrete underwater.

    • It is used to prevent segregation of concrete and ensure proper placement in underwater structures.

    • The pipe is slowly lifted as the concrete is poured to maintain a continuous flow and avoid voids.

    • Tremie pipes are commonly used in t...

  • Answered by AI
  • Q3. Dia of tremie pipe
  • Ans. 

    The dia of tremie pipe refers to the diameter of the pipe used for placing concrete underwater.

    • The diameter of a tremie pipe is typically between 8 to 12 inches.

    • A larger diameter tremie pipe is used for larger volume concrete placements.

    • The diameter of the tremie pipe should be selected based on the specific project requirements and conditions.

    • The diameter of the tremie pipe affects the rate at which concrete can be pl

  • Answered by AI
  • Q4. What is the cutoff level
  • Ans. 

    The cutoff level refers to the minimum score or standard required to pass a test or qualify for a certain position.

    • Cutoff level can vary depending on the specific test or criteria being used.

    • It is often used in academic exams, job interviews, and selection processes.

    • For example, a job may require a minimum cutoff level of 70% in a technical test to qualify for an interview.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Senior Civil Engineer interview:
  • User Experience

I applied via Naukri.com and was interviewed in Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(10 Questions)

  • Q1. Tell about your previous company works.
  • Ans. I answered where I worked and working now. When you are telling them about the what type of structures you handled in that only they will ask questions.
  • Answered by Nandan A M
  • Q2. Why reinforcement is provided alternative in column?
  • Ans. 

    Reinforcement is provided in column to increase its load-bearing capacity and prevent failure due to compression.

    • Reinforcement helps to resist bending and shear forces in the column.

    • It also helps to prevent buckling and reduces the risk of collapse.

    • The amount and type of reinforcement used depends on the size and height of the column.

    • For example, a taller and thinner column may require more reinforcement than a shorter

  • Answered by AI
  • Q3. To avoid the weak zone or shear failure. Mainly about reinforcement, concrete and quality control.
  • Q4. What is the slump range for boom pressure?
  • Ans. 

    The slump range for boom pressure varies depending on the specific project requirements and concrete mix design.

    • The slump range for boom pressure is typically determined by the concrete mix design and the desired workability of the concrete.

    • It can range from low slump (around 25-50 mm) for high-strength concrete with low water-cement ratio to high slump (around 150-200 mm) for self-compacting concrete.

    • The slump range m...

  • Answered by AI
  • Q5. 75mm to 125mm is the range for boom placer.
  • Q6. What is accountability and productivity?
  • Ans. 

    Accountability is the responsibility to answer for one's actions, while productivity is the measure of efficiency and output in achieving goals.

    • Accountability refers to being answerable for one's actions, decisions, and performance.

    • It involves taking ownership of tasks and outcomes, and being transparent and responsible.

    • Productivity is the measure of how efficiently and effectively work is completed.

    • It focuses on achie...

  • Answered by AI
  • Q7. Do you have idea about safety and safety rules at L&T?
  • Ans. 

    Yes, safety is a top priority at L&T and there are strict safety rules in place.

    • L&T has a comprehensive safety policy that covers all aspects of their operations.

    • All employees are required to undergo safety training and follow safety protocols.

    • Regular safety audits are conducted to ensure compliance with safety rules.

    • Personal protective equipment is provided to employees and its use is mandatory in hazardous areas.

    • Safe...

  • Answered by AI
  • Q8. Yes Saftey procedure will almost same in every company but be prepared.
  • Q9. What are the measures you take for quality control?
  • Ans. 

    We follow a comprehensive quality control plan that includes regular inspections, testing, and documentation.

    • Develop and implement a quality control plan

    • Conduct regular inspections and testing

    • Document all quality control activities

    • Ensure compliance with industry standards and regulations

    • Provide training to staff on quality control procedures

  • Answered by AI
  • Q10. There is no need to run behind the quality, we just need to implement what we study at our syllabus and IS:Codes. Follow the procedure and quality follow us.

Interview Preparation Tips

Interview preparation tips for other job seekers - Just tell what you know and don’t pretend you know if you don’t know. Be honest. Just yes or no. Even I didn’t answer almost 4 questions but the person who interviewed me only told the answer and he will went to next question. Don’t know everyone will be like this only or not. Be humble, stay honest and mainly answer confidentially that’s it. It’s more than enough. I wish everyone all the very best who face the interview.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Foundation type
  • Q2. Rock anchorage details
Round 2 - HR 

(1 Question)

  • Q1. Package kita loge

I applied via Walk-in and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. What are your salary expectations?
  • Ans. 

    I expect a competitive salary based on my experience, qualifications, and the responsibilities of the role.

    • Consider the industry standards and salary ranges for senior civil engineers in your area.

    • Highlight your experience, qualifications, and achievements that make you deserving of a competitive salary.

    • Express openness to negotiation and discuss additional benefits or perks that may be important to you.

    • Avoid giving a ...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. I need a sr civil engineer job , i attached my cv
  • Ans. Total, 11 years experience of building construction company
  • Answered Anonymously
  • Q2. Building work experience of starting to upto finishing .
  • Ans. 

    I have extensive experience in building work, from the initial planning stages to the final completion of projects.

    • I have worked on various building projects, including residential, commercial, and industrial structures.

    • I have been involved in the planning and design phase, where I collaborated with architects and other engineers to develop construction plans.

    • During the construction phase, I supervised the work of cont...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Only building construction, wo

LCC Projects Interview FAQs

How many rounds are there in LCC Projects Senior Civil Engineer interview?
LCC Projects interview process usually has 2 rounds. The most common rounds in the LCC Projects interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in LCC Projects Senior Civil Engineer interview?

Some of the top questions asked at the LCC Projects Senior Civil Engineer interview -

  1. FHTC full form & How to install connection for ...read more
  2. Full form of HDPE P...read more
  3. Conjmption of cement m-15 grade pcc per ...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 LCC Projects interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 696 Interviews
Swiggy Interview Questions
3.8
 • 423 Interviews
Tata Projects Interview Questions
4.3
 • 400 Interviews
Quess Interview Questions
3.9
 • 384 Interviews
TCS iON Interview Questions
3.9
 • 360 Interviews
Planet Spark Interview Questions
3.7
 • 356 Interviews
Udaan Interview Questions
4.0
 • 334 Interviews
Meesho Interview Questions
3.7
 • 326 Interviews
View all

LCC Projects Senior Civil Engineer Reviews and Ratings

based on 5 reviews

3.3/5

Rating in categories

3.3

Skill development

2.8

Work-Life balance

4.0

Salary & Benefits

2.6

Job Security

3.3

Company culture

3.7

Promotions/Appraisal

3.3

Work Satisfaction

Explore 5 Reviews and Ratings
Senior Engineer
38 salaries
unlock blur

₹3.6 L/yr - ₹8.8 L/yr

Site Engineer
27 salaries
unlock blur

₹2.6 L/yr - ₹6 L/yr

Civil Site Engineer
23 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Civil Engineer
14 salaries
unlock blur

₹2 L/yr - ₹9.1 L/yr

Billing Engineer
14 salaries
unlock blur

₹2.4 L/yr - ₹7.2 L/yr

Explore more salaries
Compare LCC Projects with

Tata Projects

4.3
Compare

Larsen & Toubro Limited

4.0
Compare

Hindustan Construction Company

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview