I applied via Recruitment Consulltant and was interviewed before Jan 2022. There were 2 interview rounds.
Constructing a substation involves several steps.
Site selection and acquisition of necessary permits
Design and engineering of the substation
Clearing and grading the site
Installation of foundations and grounding systems
Installation of transformers, switchgear, and other equipment
Connection to the power grid
Testing and commissioning of the substation
Epoxy painting is a type of coating that uses epoxy resin to create a durable and protective layer on surfaces.
Epoxy painting is commonly used on floors, walls, and industrial equipment.
It is known for its resistance to chemicals, abrasion, and moisture.
Epoxy painting can come in a variety of colors and finishes, including glossy and matte.
It requires proper surface preparation and application techniques for optimal re
Check for safety equipment and proper inflation in a raft.
Check for life jackets, paddles, and emergency supplies.
Ensure the raft is properly inflated and free of leaks.
Inspect the raft for any damage or wear and tear.
Verify that all necessary equipment is on board and in good condition.
Test the raft in calm waters before use in rougher conditions.
posted on 14 Feb 2023
posted on 22 Aug 2022
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There was 1 interview round.
I have over 10 years of experience in project management, leading cross-functional teams and delivering successful projects.
Managed a team of 15 project managers and successfully delivered multiple projects within budget and timeline
Implemented project management methodologies and tools to improve efficiency and productivity
Led the implementation of a new CRM system, resulting in improved customer satisfaction and incr...
Experienced project manager with a proven track record in leading successful projects and teams.
Over 10 years of experience in project management
Managed cross-functional teams and delivered projects on time and within budget
Implemented project management methodologies and best practices
Strong leadership and communication skills
Successfully completed a major software implementation project for a Fortune 500 company
During the difficult period of COVID-19, I adapted by implementing remote work strategies, ensuring team communication and collaboration, and adjusting project timelines and priorities.
Implemented remote work strategies to ensure the safety and well-being of the team
Utilized collaboration tools and platforms to maintain effective communication
Adjusted project timelines and priorities to accommodate the changing circums...
I applied via Job Portal and was interviewed in Nov 2024. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
posted on 6 Mar 2023
I applied via Company Website and was interviewed before Mar 2022. There were 4 interview rounds.
Preventing accidents requires a combination of training, safety protocols, and hazard identification.
Develop and implement safety protocols and procedures
Provide regular safety training to employees
Conduct regular hazard assessments and implement controls
Encourage reporting of near-misses and incidents for continuous improvement
Ensure equipment and machinery is properly maintained
Promote a culture of safety and account...
Tunnels pose various hazards such as poor air quality, fire, flooding, and collapse.
Poor air quality due to exhaust fumes, dust, and lack of ventilation
Fire hazards due to electrical equipment, flammable materials, and smoking
Flooding due to water leaks or natural disasters
Collapse due to unstable ground or structural issues
Other hazards include noise, vibration, and limited visibility
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 14 Feb 2023
posted on 11 Dec 2023
The process of building survey involves several steps to assess the condition and suitability of a building.
Determine the purpose of the survey and the scope of work
Conduct a visual inspection of the building's exterior and interior
Identify any structural issues, such as cracks or signs of deterioration
Assess the building's systems, including electrical, plumbing, and HVAC
Evaluate the building's compliance with buildin...
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.
It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.
The development length can vary depending on the ...
Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.
Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.
It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.
Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.
Pr...
The circumstances of handing over the flat to Clint
The flat was handed over to Clint after completing all necessary paperwork
The condition of the flat was documented before handing it over to Clint
Keys and access cards were provided to Clint
Any outstanding payments or dues were settled before the handover
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
based on 13 reviews
Rating in categories
Assistant Manager
3.8k
salaries
| ₹6.4 L/yr - ₹20 L/yr |
Senior Engineer
3.4k
salaries
| ₹4.5 L/yr - ₹15.1 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9.1 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹5 L/yr - ₹18.5 L/yr |
Manager
1.1k
salaries
| ₹9.6 L/yr - ₹30 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra