I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before Aug 2023. There was 1 interview round.
Improving progress in tower erection requires efficient planning, coordination, and communication.
Implement a detailed project schedule with clear milestones and deadlines.
Ensure proper coordination between different teams and subcontractors involved in the construction process.
Regularly monitor and track progress to identify any delays or bottlenecks early on.
Utilize technology such as Building Information Modeling (B...
A transposition tower in OHL is a structure used to change the position of conductors in overhead power lines.
Transposition towers are used to prevent power loss due to inductive reactance in long transmission lines.
They are typically taller than regular transmission towers to allow for the crossing of conductors.
Transposition towers are strategically placed along the transmission line to optimize power flow.
Example: I...
Permits available in construction field in Qatar include building permits, electrical permits, plumbing permits, and mechanical permits.
Building permits are required for new construction, renovations, and additions.
Electrical permits are needed for any electrical work on a construction site.
Plumbing permits are necessary for any plumbing installations or modifications.
Mechanical permits are required for HVAC systems an...
PTW stands for Permit to Work, a formal written system used to control certain types of work that are identified as potentially hazardous.
PTW is a document that specifies the work to be done and the precautions to be taken.
It is used to ensure that all necessary safety measures are in place before work begins.
Examples of work that may require a PTW include hot work, confined space entry, and working at heights.
I applied via Walk-in and was interviewed before Aug 2023. There were 2 interview rounds.
What people are saying about Larsen & Toubro Limited
I appeared for an interview before Feb 2024.
Larsen & Toubro Limited interview questions for designations
I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
Get interview-ready with Top Larsen & Toubro Limited Interview Questions
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
Family details and Qualifications working experience related queries
I applied via Walk-in and was interviewed before Nov 2021. There were 3 interview rounds.
The type of pipe laying and design mix depend on the project requirements and specifications.
The type of pipe laying can vary from open trench to trenchless methods like horizontal directional drilling or pipe jacking.
The design mix of the pipe material depends on factors like the type of fluid or gas being transported, the pressure and temperature requirements, and the environmental conditions.
For example, PVC pipes a...
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.
Some of the top questions asked at the Larsen & Toubro Limited Assistant Construction Manager interview -
based on 20 interviews
3 Interview rounds
based on 369 reviews
Rating in categories
Assistant Manager
3.9k
salaries
| ₹5.3 L/yr - ₹18.4 L/yr |
Senior Engineer
3.5k
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Engineer
1.3k
salaries
| ₹1.6 L/yr - ₹9.5 L/yr |
Manager
1.1k
salaries
| ₹9 L/yr - ₹29 L/yr |
Civil Engineer
1k
salaries
| ₹2.2 L/yr - ₹11 L/yr |
Tata Projects
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International