Q1. What are permits available at construction field at qatar?

Ans.

Permits available in construction field in Qatar include building permits, electrical permits, plumbing permits, and mechanical permits.

  • Building permits are required for new construction, renovations, and additions.

  • Electrical permits are needed for any electrical work on a construction site.

  • Plumbing permits are necessary for any plumbing installations or modifications.

  • Mechanical permits are required for HVAC systems and other mechanical work.

  • Other permits may include demoliti...read more

Add your answer

Q2. What is the tollerence between two mismatch bolted flanges

Ans.

The tolerance between two mismatch bolted flanges refers to the allowable deviation in alignment or positioning of the flanges.

  • Tolerance is typically specified in terms of a maximum allowable gap or misalignment between the flanges.

  • It ensures that the flanges can still be bolted together securely even if they are not perfectly aligned.

  • The tolerance depends on the specific application and industry standards.

  • For example, in the oil and gas industry, the tolerance for mismatch b...read more

View 1 answer

Q3. Tell me rating of highest transformer used inthe project

Ans.

The highest transformer used in the project is rated at 5000 kVA.

  • The highest transformer used in the project has a rating of 5000 kVA.

  • Transformers are rated in terms of their capacity to handle electrical load.

  • Higher kVA rating indicates a larger capacity to handle electrical load.

  • Example: The highest transformer used in the project is a 5000 kVA transformer.

Add your answer

Q4. How to improve progress in erection of towers?

Ans.

Improving progress in tower erection requires efficient planning, coordination, and communication.

  • Implement a detailed project schedule with clear milestones and deadlines.

  • Ensure proper coordination between different teams and subcontractors involved in the construction process.

  • Regularly monitor and track progress to identify any delays or bottlenecks early on.

  • Utilize technology such as Building Information Modeling (BIM) for better visualization and coordination.

  • Encourage op...read more

Add your answer
Discover Bain & Company interview dos and don'ts from real experiences

Q5. What is called transposition tower in OHL?

Ans.

A transposition tower in OHL is a structure used to change the position of conductors in overhead power lines.

  • Transposition towers are used to prevent power loss due to inductive reactance in long transmission lines.

  • They are typically taller than regular transmission towers to allow for the crossing of conductors.

  • Transposition towers are strategically placed along the transmission line to optimize power flow.

  • Example: In a 3-phase transmission line, transposition towers are us...read more

Add your answer

Q6. What Is codes and general work in site..

Ans.

Codes are regulations that govern construction practices and safety standards on a job site.

  • Codes are established by local, state, and federal agencies to ensure that buildings are safe and meet certain standards.

  • Construction managers must be familiar with building codes and ensure that all work on the site complies with them.

  • General work on a site includes tasks such as scheduling, budgeting, coordinating with subcontractors, and overseeing the work of laborers and tradespeo...read more

Add your answer
Are these interview questions helpful?

Q7. Can you achive density more than MDD

Ans.

Yes, achieving density more than Maximum Dry Density (MDD) is possible through proper compaction techniques and materials.

  • Achieving density more than MDD is possible by using vibratory compactors to increase soil compaction.

  • Proper moisture content in the soil is crucial for achieving higher density than MDD.

  • Using suitable materials like crushed stone or gravel can help in achieving higher density levels.

  • Regular testing and monitoring of compaction levels is essential to ensur...read more

Add your answer

Q8. Tests for coarse aggregate & fine aggregate

Ans.

Tests for coarse aggregate & fine aggregate include sieve analysis, specific gravity, absorption, and particle shape.

  • Sieve analysis is used to determine the particle size distribution of aggregates.

  • Specific gravity test helps in identifying the density of the aggregates.

  • Absorption test measures the amount of water absorbed by the aggregates.

  • Particle shape test evaluates the shape of the aggregate particles.

  • Examples: ASTM C136 for sieve analysis, ASTM C127 for specific gravity...read more

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. Diff between compaction & consolidation

Ans.

Compaction is the process of reducing air voids in soil by applying pressure, while consolidation is the gradual settlement of soil under its own weight.

  • Compaction involves applying pressure to soil to reduce air voids and increase density.

  • Consolidation is the gradual settlement of soil over time due to the weight of the soil above it.

  • Compaction is typically done before construction to improve soil stability and load-bearing capacity.

  • Consolidation can continue for years after...read more

Add your answer

Q10. What is called PTW

Ans.

PTW stands for Permit to Work, a formal written system used to control certain types of work that are identified as potentially hazardous.

  • PTW is a document that specifies the work to be done and the precautions to be taken.

  • It is used to ensure that all necessary safety measures are in place before work begins.

  • Examples of work that may require a PTW include hot work, confined space entry, and working at heights.

Add your answer

Q11. Steps involved in segment erection

Ans.

Segment erection involves lifting and placing precast concrete segments to form a structure.

  • Prepare the segment for lifting by attaching lifting devices

  • Use cranes or other lifting equipment to lift the segment into place

  • Ensure proper alignment and connection with adjacent segments

  • Secure the segment in place using temporary supports or connections

  • Repeat the process for each segment until the structure is complete

Add your answer

Q12. Type of pipe laying,design mix.

Ans.

The type of pipe laying and design mix depend on the project requirements and specifications.

  • The type of pipe laying can vary from open trench to trenchless methods like horizontal directional drilling or pipe jacking.

  • The design mix of the pipe material depends on factors like the type of fluid or gas being transported, the pressure and temperature requirements, and the environmental conditions.

  • For example, PVC pipes are commonly used for water supply systems, while steel pip...read more

Add your answer

Q13. Pile spiral distance called?

Ans.

Pile spiral distance is called pitch.

  • The distance between two adjacent spirals on a pile is known as pitch.

  • Pitch is an important factor in determining the stability and load-bearing capacity of a pile.

  • For example, a pile with a larger pitch may be more suitable for bearing heavy loads.

  • Pitch can vary depending on the type of pile and the soil conditions.

View 1 answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Bain & Company

based on 19 interviews
3 Interview rounds
Technical Round
HR Round - 1
HR Round - 2
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter