L&T Construction Civil Structural Engineer Interview Questions and Answers

Updated 27 Feb 2022

L&T Construction Civil Structural Engineer Interview Experiences

1 interview found

I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is GFC drawing
  • Ans. 

    GFC drawing stands for Good for Construction drawing, which is a final set of drawings used for construction purposes.

    • GFC drawings are the final set of drawings used for construction purposes

    • They include all the necessary details and dimensions required for construction

    • GFC drawings are used by contractors and builders to construct the building as per the design

    • They are also used for obtaining necessary permits and appr...

  • Answered by AI
  • Q2. How's types of interview writin &burbly

Interview Preparation Tips

Interview preparation tips for other job seekers - How many raunds given the interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. What is structural engineer basic? Structural engineers work to combat factors such as wind, snow, rain and the effects of gravity on a range of different structures. Whether building bridges or homes, the...
  • Ans. 

    Structural engineers work to combat factors like wind, snow, rain, and gravity on various structures.

    • Structural engineers design and analyze structures to ensure they can withstand different environmental conditions.

    • They consider factors such as wind loads, snow loads, seismic forces, and the effects of gravity on buildings and bridges.

    • Structural engineers use computer-aided design (CAD) software and mathematical calcu...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for G R Infraprojects Civil Structural Engineer interview:
  • Bridges
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What an all projects you worked in oil and gas? How you design structure

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is volume of concrete?
  • Ans. 

    The volume of concrete refers to the amount of space occupied by concrete.

    • Volume of concrete is measured in cubic units (e.g., cubic meters or cubic feet).

    • It is calculated by multiplying the length, width, and height of the concrete element.

    • For example, if a concrete slab has a length of 5 meters, width of 3 meters, and height of 0.15 meters, the volume of concrete would be 5 x 3 x 0.15 = 2.25 cubic meters.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I give interview at Ho office.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Birla Institute of Technology and Science (BITS), Pilani and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Group Discussion 

Social media connecting people

Round 2 - Technical 

(2 Questions)

  • Q1. Timoshenko beam theory
  • Q2. Sfd and bmd diagram
  • Ans. 

    Sfd and bmd diagrams show the variation of shear force and bending moment along the length of a structural member.

    • SFD (Shear Force Diagram) shows the variation of shear force along the length of a beam or structural member.

    • BMD (Bending Moment Diagram) shows the variation of bending moment along the length of a beam or structural member.

    • SFD and BMD are essential for analyzing the internal forces and moments in a structu...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Introduce yourself
  • Ans. 

    I am a structural engineer with 5 years of experience in designing and analyzing buildings and bridges.

    • Graduated with a degree in Civil Engineering

    • Worked on various projects including high-rise buildings and pedestrian bridges

    • Proficient in software such as AutoCAD and SAP2000

  • Answered by AI
  • Q2. Preference of job location
  • Ans. 

    I am open to job locations that offer opportunities for growth and development.

    • I am willing to relocate for the right job opportunity

    • I prefer job locations with good transportation options

    • I am open to both urban and rural locations depending on the job requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well both technical and communication skills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the IS code of pile.
  • Ans. 

    IS 2911 is the Indian Standard code for design and construction of pile foundations.

    • IS 2911 is the code for design and construction of pile foundations in India.

    • It covers various types of piles including driven piles, bored cast-in-situ piles, etc.

    • The code provides guidelines for the design, materials, construction, and testing of piles.

    • It ensures the safety and stability of structures supported by piles.

    • Example: IS 29...

  • Answered by AI
  • Q2. What is the density of bentonite during piling.
  • Ans. 

    The density of bentonite during piling is typically around 1.0 to 1.2 g/cm^3.

    • The density of bentonite can vary depending on the specific type and concentration used.

    • Higher density bentonite is often preferred for better support during piling operations.

    • Typical range of density for bentonite during piling is 1.0 to 1.2 g/cm^3.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Bolt to botlt distance how much
  • Ans. 

    The bolt to bolt distance depends on the specific design requirements and standards for the structural connection.

    • The bolt to bolt distance is typically specified in the design drawings or calculations provided by the engineer.

    • It is important to follow the recommended bolt to bolt distance to ensure the structural integrity of the connection.

    • The bolt to bolt distance may vary depending on factors such as the size and t...

  • Answered by AI
  • Q2. Edge distance how much ?
  • Ans. 

    Edge distance refers to the distance between the edge of a structural member and the center of a hole or fastener.

    • Edge distance is typically specified in design codes and standards.

    • It is important to maintain adequate edge distance to prevent failure of the connection.

    • The required edge distance can vary depending on the type of connection and the loading conditions.

    • For example, in steel connections, the minimum edge di...

  • Answered by AI
  • Q3. Column to base plate which type of weld ?
  • Ans. 

    The type of weld used for connecting a column to a base plate is typically a fillet weld.

    • Fillet welds are commonly used for connecting structural steel components.

    • The size of the fillet weld is determined based on the forces and stresses the connection will experience.

    • Proper welding procedures and inspections are essential to ensure the weld's quality and strength.

  • Answered by AI
  • Q4. Column to beam how to joint ?
  • Ans. 

    Column to beam joints are typically connected using various methods such as welding, bolting, or using mechanical connectors.

    • Common methods for connecting column to beam include welding, bolting, or using mechanical connectors

    • Welding is a common method where the column and beam are fused together using heat

    • Bolting involves using bolts to secure the column and beam together

    • Mechanical connectors such as shear connectors ...

  • Answered by AI
  • Q5. Top moment column to beam top side which weld ?
  • Ans. 

    The top moment column to beam top side is typically welded on the compression side of the beam.

    • Weld the top moment connection on the compression side of the beam for maximum strength.

    • Ensure proper welding techniques and inspections are followed to maintain structural integrity.

    • Consider using fillet welds or groove welds depending on the design requirements.

    • Consult structural engineering codes and standards for specific...

  • Answered by AI
  • Q6. Edge distance to cover vertical reinforcement 75 mm all type of fdn
  • Ans. 

    Edge distance of 75mm is required to cover vertical reinforcement in all types of foundations.

    • Edge distance is important to ensure proper anchorage and structural integrity of the reinforcement.

    • In this case, a minimum edge distance of 75mm is specified for covering vertical reinforcement in all types of foundations.

    • Examples of foundations where this requirement applies include spread footings, pile caps, and mat founda

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please study base plate detail and shear connection and moment connection bolted and welded type
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Case Study 

About Previous experience and some site questions

Round 3 - Technical 

(1 Question)

  • Q1. Civil and Highway Structure related Question

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be well versed in previous experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Bridge construction and BBS
  • Q2. Execution of site like vup
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Auto cad commands
  • Q2. Trim Shortcut Key
  • Q3. Fillet Command Use Which Purpose
  • Ans. 

    The Fillet command is used in structural engineering to create a rounded corner between two lines or objects.

    • The Fillet command is used to create a smooth transition between two lines or objects by adding a rounded corner.

    • It is commonly used in structural engineering to create fillets at the junctions of beams, columns, and other structural elements.

    • The Fillet command can be used with different radius values to control...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare the basic question and answers

Skills evaluated in this interview

L&T Construction Interview FAQs

What are the top questions asked in L&T Construction Civil Structural Engineer interview?

Some of the top questions asked at the L&T Construction Civil Structural Engineer interview -

  1. What is GFC draw...read more
  2. How's types of interview writin &bur...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 L&T Construction interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 396 Interviews
Dilip Buildcon Interview Questions
4.0
 • 138 Interviews
G R Infraprojects Interview Questions
4.1
 • 126 Interviews
AtkinsRealis Interview Questions
4.0
 • 83 Interviews
GMR Group Interview Questions
4.1
 • 72 Interviews
View all
L&T Construction Civil Structural Engineer Salary
based on 8 salaries
₹3 L/yr - ₹7.5 L/yr
39% less than the average Civil Structural Engineer Salary in India
View more details

L&T Construction Civil Structural Engineer Reviews and Ratings

based on 2 reviews

3.1/5

Rating in categories

3.0

Skill development

3.0

Work-Life balance

4.0

Salary & Benefits

2.1

Job Security

1.1

Company culture

4.0

Promotions/Appraisal

3.0

Work Satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Senior Engineer
700 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
532 salaries
unlock blur

₹5.5 L/yr - ₹17.5 L/yr

Civil Site Engineer
382 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Civil Engineer
339 salaries
unlock blur

₹1.8 L/yr - ₹9.4 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview