Upload Button Icon Add office photos

McDermott International

Compare button icon Compare button icon Compare

Filter interviews by

McDermott International Civil Structural Designer Interview Questions, Process, and Tips

Updated 26 Aug 2023

McDermott International Civil Structural Designer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Bolt to botlt distance how much
  • Ans. 

    The bolt to bolt distance depends on the specific design requirements and standards for the structural connection.

    • The bolt to bolt distance is typically specified in the design drawings or calculations provided by the engineer.

    • It is important to follow the recommended bolt to bolt distance to ensure the structural integrity of the connection.

    • The bolt to bolt distance may vary depending on factors such as the size and t...

  • Answered by AI
  • Q2. Edge distance how much ?
  • Ans. 

    Edge distance refers to the distance between the edge of a structural member and the center of a hole or fastener.

    • Edge distance is typically specified in design codes and standards.

    • It is important to maintain adequate edge distance to prevent failure of the connection.

    • The required edge distance can vary depending on the type of connection and the loading conditions.

    • For example, in steel connections, the minimum edge di...

  • Answered by AI
  • Q3. Column to base plate which type of weld ?
  • Ans. 

    The type of weld used for connecting a column to a base plate is typically a fillet weld.

    • Fillet welds are commonly used for connecting structural steel components.

    • The size of the fillet weld is determined based on the forces and stresses the connection will experience.

    • Proper welding procedures and inspections are essential to ensure the weld's quality and strength.

  • Answered by AI
  • Q4. Column to beam how to joint ?
  • Ans. 

    Column to beam joints are typically connected using various methods such as welding, bolting, or using mechanical connectors.

    • Common methods for connecting column to beam include welding, bolting, or using mechanical connectors

    • Welding is a common method where the column and beam are fused together using heat

    • Bolting involves using bolts to secure the column and beam together

    • Mechanical connectors such as shear connectors ...

  • Answered by AI
  • Q5. Top moment column to beam top side which weld ?
  • Ans. 

    The top moment column to beam top side is typically welded on the compression side of the beam.

    • Weld the top moment connection on the compression side of the beam for maximum strength.

    • Ensure proper welding techniques and inspections are followed to maintain structural integrity.

    • Consider using fillet welds or groove welds depending on the design requirements.

    • Consult structural engineering codes and standards for specific...

  • Answered by AI
  • Q6. Edge distance to cover vertical reinforcement 75 mm all type of fdn
  • Ans. 

    Edge distance of 75mm is required to cover vertical reinforcement in all types of foundations.

    • Edge distance is important to ensure proper anchorage and structural integrity of the reinforcement.

    • In this case, a minimum edge distance of 75mm is specified for covering vertical reinforcement in all types of foundations.

    • Examples of foundations where this requirement applies include spread footings, pile caps, and mat founda

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please study base plate detail and shear connection and moment connection bolted and welded type

Civil Structural Designer Jobs at McDermott International

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. About your self
  • Q2. What is the difference between Fixed and Pinned connection in base plate?
  • Ans. 

    Fixed connection does not allow rotation at the base plate, while pinned connection allows rotation.

    • Fixed connection is rigid and does not allow rotation at the base plate.

    • Pinned connection allows rotation at the base plate.

    • Fixed connection provides more stability and resistance to lateral forces.

    • Pinned connection is more flexible and allows for some movement.

    • Examples: Fixed connection is commonly used in high-rise bui...

  • Answered by AI
  • Q3. What is the rise and trade in stair?
  • Ans. 

    The rise is the vertical distance between two consecutive steps, while the tread is the horizontal distance.

    • The rise is typically around 7-8 inches, while the tread is usually around 10-11 inches.

    • The rise and tread dimensions are important for ensuring safe and comfortable stair design.

    • Building codes often dictate the minimum and maximum rise and tread dimensions for safety reasons.

  • Answered by AI
  • Q4. What is the pitch distance in bolt?
  • Ans. 

    Pitch distance in bolt refers to the distance between the centers of adjacent bolts in a bolted connection.

    • Pitch distance is typically measured from the center of one bolt to the center of the next bolt in a row.

    • It is important to maintain consistent pitch distances to ensure proper load distribution and structural integrity.

    • For example, in a bolted connection with a pitch distance of 2 inches, the centers of adjacent

  • Answered by AI
  • Q5. Make pipe rack section on both direction
  • Ans. 

    To create a pipe rack section on both directions.

    • Identify the location and dimensions for the pipe rack section

    • Consider the load requirements and support structures

    • Design the pipe rack section using appropriate materials and connections

    • Ensure proper spacing and alignment for pipes in both directions

  • Answered by AI
  • Q6. Make equipment foundation, Pump Foundation
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Only Tool test on E3D
  • Q2. Modeling related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good practice
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Explain connection, and there use
Round 2 - Software testing 

(1 Question)

  • Q1. Prepare model as per drawing
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - One-on-one 

(2 Questions)

  • Q1. How do you calculate the amount of material used in cubic meters?
  • Q2. Water absorpation related
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Birla Institute of Technology and Science (BITS), Pilani and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Group Discussion 

Social media connecting people

Round 2 - Technical 

(2 Questions)

  • Q1. Timoshenko beam theory
  • Q2. Sfd and bmd diagram
  • Ans. 

    Sfd and bmd diagrams show the variation of shear force and bending moment along the length of a structural member.

    • SFD (Shear Force Diagram) shows the variation of shear force along the length of a beam or structural member.

    • BMD (Bending Moment Diagram) shows the variation of bending moment along the length of a beam or structural member.

    • SFD and BMD are essential for analyzing the internal forces and moments in a structu...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Introduce yourself
  • Ans. 

    I am a structural engineer with 5 years of experience in designing and analyzing buildings and bridges.

    • Graduated with a degree in Civil Engineering

    • Worked on various projects including high-rise buildings and pedestrian bridges

    • Proficient in software such as AutoCAD and SAP2000

  • Answered by AI
  • Q2. Preference of job location
  • Ans. 

    I am open to job locations that offer opportunities for growth and development.

    • I am willing to relocate for the right job opportunity

    • I prefer job locations with good transportation options

    • I am open to both urban and rural locations depending on the job requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well both technical and communication skills
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. General Structural Questions
  • Q2. Explain your previous Experiences?
  • Ans. 

    I have over 10 years of experience in structural design, working on various projects including commercial buildings, bridges, and industrial facilities.

    • Designed structural systems for commercial buildings, ensuring safety and compliance with building codes

    • Managed the structural design of bridge projects, coordinating with architects and engineers

    • Worked on the design of industrial facilities, focusing on structural inte...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Conversation 

(1 Question)

  • Q1. Do you have experience with basements and below ground structures
  • Ans. 

    Yes, I have extensive experience with basements and below ground structures.

    • I have designed and analyzed numerous basements for residential and commercial buildings.

    • I am familiar with waterproofing techniques and soil mechanics related to below ground structures.

    • I have experience with retaining walls, foundations, and underground parking structures.

    • I have worked on projects involving deep excavations and shoring system...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is copy monitor in Autodesk Revit?
  • Ans. 

    Copy monitor in Autodesk Revit is a tool used to monitor changes in linked models and synchronize them with the current model.

    • Copy monitor allows users to track changes in linked models and update them in the current model.

    • It helps maintain consistency between different models in a project.

    • Users can easily identify and resolve conflicts or discrepancies between linked models.

    • Copy monitor can be used for elements like g

  • Answered by AI
  • Q2. What is shared parameter?
  • Ans. 

    Shared parameter is a parameter that can be used across multiple elements in a project.

    • Shared parameters allow for consistent data across different elements in a project.

    • They can be created and managed in software like Revit for BIM projects.

    • Examples include shared parameters for material types, cost estimates, or project phases.

  • Answered by AI
  • Q3. What is the difference between import cad & link cad?
  • Ans. 

    Import CAD brings a copy of the CAD file into the current project, while Link CAD creates a reference to the original CAD file.

    • Import CAD creates a duplicate of the CAD file within the project, increasing file size.

    • Link CAD maintains a connection to the original CAD file, allowing for real-time updates.

    • Changes made to the original CAD file will reflect in the linked CAD file, but not in the imported CAD file.

    • Import CAD...

  • Answered by AI
  • Q4. What is Building Information Modelling?
  • Ans. 

    Building Information Modelling (BIM) is a digital representation of the physical and functional characteristics of a building.

    • BIM is a collaborative process that allows multiple stakeholders to work together on a building project.

    • It involves creating and managing digital representations of the physical and functional characteristics of a building.

    • BIM helps in improving coordination, efficiency, and accuracy in the desi...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. General question about me.

Interview Preparation Tips

Interview preparation tips for other job seekers - If are a expert on Revit & Structural Modeler then you should know about very well Revit & you have to strong at Technical skill also.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Sfd and bmd questions
  • Q2. Calculation of earthquake loads
  • Ans. 

    Earthquake loads are calculated using seismic design codes and formulas based on the seismic hazard of the region.

    • Determine the seismic hazard of the region using historical data and seismic maps

    • Select a seismic design code such as ASCE 7 or Eurocode 8

    • Calculate the seismic base shear using the formula V = CsW

    • Distribute the seismic base shear to the structure using the appropriate load combinations

    • Consider the effects o...

  • Answered by AI

McDermott International Interview FAQs

How many rounds are there in McDermott International Civil Structural Designer interview?
McDermott International interview process usually has 2 rounds. The most common rounds in the McDermott International interview process are Resume Shortlist and Technical.
How to prepare for McDermott International Civil Structural Designer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at McDermott International. The most common topics and skills that interviewers at McDermott International expect are Fabrication, Microstation, Civil, Civil Engineering and Construction.
What are the top questions asked in McDermott International Civil Structural Designer interview?

Some of the top questions asked at the McDermott International Civil Structural Designer interview -

  1. Column to base plate which type of wel...read more
  2. Top moment column to beam top side which wel...read more
  3. Bolt to botlt distance how m...read more

Tell us how to improve this page.

McDermott International Civil Structural Designer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 741 Interviews
Saint-Gobain Interview Questions
4.0
 • 172 Interviews
Schlumberger Interview Questions
3.9
 • 136 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Worley Interview Questions
4.1
 • 109 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
TechnipFMC Interview Questions
4.0
 • 69 Interviews
View all
McDermott International Civil Structural Designer Salary
based on 47 salaries
₹4.2 L/yr - ₹15.5 L/yr
At par with the average Civil Structural Designer Salary in India
View more details

McDermott International Civil Structural Designer Reviews and Ratings

based on 8 reviews

4.4/5

Rating in categories

3.6

Skill development

4.0

Work-life balance

3.8

Salary

4.2

Job security

4.0

Company culture

3.0

Promotions

3.7

Work satisfaction

Explore 8 Reviews and Ratings
Civil/Structural Designer

Gurgaon / Gurugram

3-8 Yrs

Not Disclosed

Principal Civil/Structural Designer

Pune

10-12 Yrs

Not Disclosed

Explore more jobs
Piping Engineer
159 salaries
unlock blur

₹6.5 L/yr - ₹22 L/yr

Electrical Designer
95 salaries
unlock blur

₹5 L/yr - ₹17 L/yr

Piping Designer
91 salaries
unlock blur

₹5.4 L/yr - ₹18 L/yr

Process Engineer
82 salaries
unlock blur

₹6.5 L/yr - ₹19.7 L/yr

Structural Designer
79 salaries
unlock blur

₹7 L/yr - ₹18.5 L/yr

Explore more salaries
Compare McDermott International with

TechnipFMC

4.0
Compare

Saipem

4.1
Compare

Subsea 7

4.4
Compare

Petrofac

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview