Filter interviews by
Have Group discussion after written test and face to face interview
I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.
I appeared for an interview before Mar 2024.
Design steps for creating a steel composite girder and structural detailing
1. Determine the required load capacity and span of the girder
2. Select appropriate steel and concrete materials for the composite girder
3. Develop a structural analysis model to ensure the girder meets design requirements
4. Design the steel section of the girder including flange and web dimensions
5. Determine the shear connectors and their spac...
Buckling analysis for steel arches involves determining the critical load at which the arch will buckle under compression.
Calculate the critical load using Euler's formula: P_critical = (pi^2 * E * I) / (K * L)^2
Consider factors such as material properties, geometry, and boundary conditions in the analysis
Use software like ANSYS or ABAQUS for finite element analysis to simulate buckling behavior
Perform sensitivity anal...
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Apr 2023. There was 1 interview round.
I applied via Referral and was interviewed in Oct 2022. There were 2 interview rounds.
A thrust block is a concrete block used to resist the thrust of a pipeline or conduit.
It is used to prevent the movement of a pipeline or conduit caused by internal pressure.
It is typically made of concrete and is designed to withstand the force of the fluid or gas flowing through the pipeline.
Thrust blocks are commonly used in water and sewage systems, as well as in oil and gas pipelines.
They are usually installed at ...
Pipe bedding details are designed to provide support and stability to the pipe.
Determine the type of soil and its load-bearing capacity
Select the appropriate bedding material, such as crushed stone or sand
Ensure proper compaction of the bedding material
Design the trench width and depth to accommodate the pipe and bedding
Consider factors such as traffic loads and environmental conditions
Follow local codes and regulation...
A non-restrained joint is a joint that is free to move in all directions.
A non-restrained joint allows for movement in all directions without any external force or constraint.
Examples include ball and socket joints in the human body and expansion joints in buildings.
Non-restrained joints require careful design and consideration to ensure proper function and stability.
In engineering, non-restrained joints are often used...
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Piping Engineer
158
salaries
| ₹6.5 L/yr - ₹23 L/yr |
Electrical Designer
93
salaries
| ₹5 L/yr - ₹18 L/yr |
Piping Designer
89
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Process Engineer
84
salaries
| ₹6.5 L/yr - ₹21.7 L/yr |
Structural Designer
76
salaries
| ₹6 L/yr - ₹18 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM