Upload Button Icon Add office photos

Bechtel

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Bechtel Civil Structural Designer Interview Questions, Process, and Tips

Updated 30 Jun 2024

Bechtel Civil Structural Designer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. About your self
  • Q2. What is the difference between Fixed and Pinned connection in base plate?
  • Ans. 

    Fixed connection does not allow rotation at the base plate, while pinned connection allows rotation.

    • Fixed connection is rigid and does not allow rotation at the base plate.

    • Pinned connection allows rotation at the base plate.

    • Fixed connection provides more stability and resistance to lateral forces.

    • Pinned connection is more flexible and allows for some movement.

    • Examples: Fixed connection is commonly used in high-rise bui...

  • Answered by AI
  • Q3. What is the rise and trade in stair?
  • Ans. 

    The rise is the vertical distance between two consecutive steps, while the tread is the horizontal distance.

    • The rise is typically around 7-8 inches, while the tread is usually around 10-11 inches.

    • The rise and tread dimensions are important for ensuring safe and comfortable stair design.

    • Building codes often dictate the minimum and maximum rise and tread dimensions for safety reasons.

  • Answered by AI
  • Q4. What is the pitch distance in bolt?
  • Ans. 

    Pitch distance in bolt refers to the distance between the centers of adjacent bolts in a bolted connection.

    • Pitch distance is typically measured from the center of one bolt to the center of the next bolt in a row.

    • It is important to maintain consistent pitch distances to ensure proper load distribution and structural integrity.

    • For example, in a bolted connection with a pitch distance of 2 inches, the centers of adjacent

  • Answered by AI
  • Q5. Make pipe rack section on both direction
  • Ans. 

    To create a pipe rack section on both directions.

    • Identify the location and dimensions for the pipe rack section

    • Consider the load requirements and support structures

    • Design the pipe rack section using appropriate materials and connections

    • Ensure proper spacing and alignment for pipes in both directions

  • Answered by AI
  • Q6. Make equipment foundation, Pump Foundation

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Bolt to botlt distance how much
  • Ans. 

    The bolt to bolt distance depends on the specific design requirements and standards for the structural connection.

    • The bolt to bolt distance is typically specified in the design drawings or calculations provided by the engineer.

    • It is important to follow the recommended bolt to bolt distance to ensure the structural integrity of the connection.

    • The bolt to bolt distance may vary depending on factors such as the size and t...

  • Answered by AI
  • Q2. Edge distance how much ?
  • Ans. 

    Edge distance refers to the distance between the edge of a structural member and the center of a hole or fastener.

    • Edge distance is typically specified in design codes and standards.

    • It is important to maintain adequate edge distance to prevent failure of the connection.

    • The required edge distance can vary depending on the type of connection and the loading conditions.

    • For example, in steel connections, the minimum edge di...

  • Answered by AI
  • Q3. Column to base plate which type of weld ?
  • Ans. 

    The type of weld used for connecting a column to a base plate is typically a fillet weld.

    • Fillet welds are commonly used for connecting structural steel components.

    • The size of the fillet weld is determined based on the forces and stresses the connection will experience.

    • Proper welding procedures and inspections are essential to ensure the weld's quality and strength.

  • Answered by AI
  • Q4. Column to beam how to joint ?
  • Ans. 

    Column to beam joints are typically connected using various methods such as welding, bolting, or using mechanical connectors.

    • Common methods for connecting column to beam include welding, bolting, or using mechanical connectors

    • Welding is a common method where the column and beam are fused together using heat

    • Bolting involves using bolts to secure the column and beam together

    • Mechanical connectors such as shear connectors ...

  • Answered by AI
  • Q5. Top moment column to beam top side which weld ?
  • Ans. 

    The top moment column to beam top side is typically welded on the compression side of the beam.

    • Weld the top moment connection on the compression side of the beam for maximum strength.

    • Ensure proper welding techniques and inspections are followed to maintain structural integrity.

    • Consider using fillet welds or groove welds depending on the design requirements.

    • Consult structural engineering codes and standards for specific...

  • Answered by AI
  • Q6. Edge distance to cover vertical reinforcement 75 mm all type of fdn
  • Ans. 

    Edge distance of 75mm is required to cover vertical reinforcement in all types of foundations.

    • Edge distance is important to ensure proper anchorage and structural integrity of the reinforcement.

    • In this case, a minimum edge distance of 75mm is specified for covering vertical reinforcement in all types of foundations.

    • Examples of foundations where this requirement applies include spread footings, pile caps, and mat founda

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please study base plate detail and shear connection and moment connection bolted and welded type
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Ans. 

    I am a Civil and Structural Designer with experience in designing and drafting structures for various construction projects.

    • I have a Bachelor's degree in Civil Engineering and a strong background in structural analysis and design.

    • I have worked on projects ranging from residential buildings to large-scale commercial structures.

    • I am proficient in using software such as AutoCAD and Revit for creating detailed designs and ...

  • Answered by AI
  • Q2. Nil

Interview Preparation Tips

Interview preparation tips for other job seekers - Nil
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Explain connection, and there use
  • Ans. 

    Connections are joints that link structural elements together, transferring loads and ensuring stability.

    • Connections are crucial in ensuring the stability and safety of a structure.

    • They transfer loads between structural elements, such as beams, columns, and trusses.

    • Common types of connections include welded, bolted, and riveted connections.

    • Properly designed connections are essential for the overall structural integrity

  • Answered by AI
Round 2 - Software testing 

(1 Question)

  • Q1. Prepare model as per drawing

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to girder,segment,pier,pier table

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge about ur own work u worked recently

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About my experience and what kind of job i can handle etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Mine experience was Nice , they were also kind and gentle . During interview they help me also to define some terms and specifications etc

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

Bechtel Interview FAQs

How many rounds are there in Bechtel Civil Structural Designer interview?
Bechtel interview process usually has 1 rounds. The most common rounds in the Bechtel interview process are Technical.
What are the top questions asked in Bechtel Civil Structural Designer interview?

Some of the top questions asked at the Bechtel Civil Structural Designer interview -

  1. What is the difference between Fixed and Pinned connection in base pla...read more
  2. What is the rise and trade in sta...read more
  3. What is the pitch distance in bo...read more

Tell us how to improve this page.

Bechtel Civil Structural Designer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 750 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 117 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
View all
Bechtel Civil Structural Designer Salary
based on 7 salaries
₹12 L/yr - ₹23 L/yr
70% more than the average Civil Structural Designer Salary in India
View more details

Bechtel Civil Structural Designer Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

2.2

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 2 Reviews and Ratings
Senior Engineer
119 salaries
unlock blur

₹14 L/yr - ₹49 L/yr

Process Engineer
94 salaries
unlock blur

₹6 L/yr - ₹19.1 L/yr

Engineer
64 salaries
unlock blur

₹6 L/yr - ₹24 L/yr

Purchasing Specialist
63 salaries
unlock blur

₹6.5 L/yr - ₹20 L/yr

Senior Process Engineer
53 salaries
unlock blur

₹21 L/yr - ₹40.2 L/yr

Explore more salaries
Compare Bechtel with

L&T Construction

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview