Bechtel Project Control Manager Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How would you manage design of power plant
  • Ans. 

    I would manage the design of a power plant by coordinating with engineers, ensuring compliance with regulations, and monitoring progress.

    • Coordinate with engineering team to develop detailed design plans

    • Ensure compliance with safety regulations and environmental standards

    • Monitor progress and address any design issues or changes

    • Collaborate with stakeholders to incorporate feedback and make necessary adjustments

  • Answered by AI
  • Q2. Standard data is on my tips and that becomes the basis for another on based on mega watts

Project Control Manager Interview Questions & Answers

user image Mohammad Naimur Rahman

posted on 1 Dec 2023

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
-

I applied via Job Portal and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Project Controls Related questions
  • Q2. Any example in project that effect the entire project technically and economically
  • Ans. 

    Changes in project scope can have significant technical and economic impacts.

    • Changes in project scope can lead to increased costs and delays.

    • Technical changes may require additional resources or expertise.

    • Economic impacts can include changes in project budget or financial viability.

    • Examples include scope changes in construction projects, design changes in engineering projects, or regulatory changes in energy projects.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hire and fire, dirty politics , don't go.

Project Control Manager Interview Questions Asked at Other Companies

asked in Manu
Q1. which Activity having long duration in a network schedule/ projec ... read more
asked in Bechtel
Q2. Any example in project that effect the entire project technically ... read more
asked in Bechtel
Q3. How would you manage design of power plant
asked in Karle Infra
Q4. Earned value management techniques and applications in project
Q5. What are type of Tower in Transmission line.

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About waterproofing procedure, observation raised and closed by application
  • Q2. Mivan formwork,MEP ,Qaulity assurance

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Assistant Manager interview:
  • All the finishing and rcc topice
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Tell about planning process
  • Ans. 

    The planning process involves setting goals, identifying resources, creating a timeline, and evaluating progress.

    • Setting clear and achievable goals

    • Identifying resources needed

    • Creating a timeline for tasks and deadlines

    • Evaluating progress and making adjustments as needed

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Reagarding work experiences & background.
Round 2 - Technical 

(4 Questions)

  • Q1. Related to technical aspects of projects executed.
  • Q2. Concrete mix designs
  • Q3. P&M productivity - Earth works
  • Q4. Customer relationship related

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your answers. See the scope and technical aspects of the experience claimed.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Related TBM Tunnelling
  • Q2. How to work in metro city with EPB machine
  • Ans. 

    To work in a metro city with an EPB machine, one must be familiar with its operation and maintenance.

    • Understand the operation of the EPB machine and follow safety protocols

    • Regularly maintain and inspect the EPB machine to ensure proper functioning

    • Coordinate with other team members and stakeholders for efficient project execution

    • Stay updated on the latest technology and advancements in EPB machines

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Discussion about qualification
  • Q2. About salary and qualification
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Related to field and years of experience
  • Q2. Salary,expectations,company requirements and commitment to work
  • Q3. They test your patience and response capability
Round 3 - Technical 

(2 Questions)

  • Q1. Cable laying and jointing knowledge
  • Q2. Related to field inspection and site acceptance

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in advance irrespective of field too,they make ask different questions to check your capable to give better position other than applied.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Elaborate VT pump installation process step by step.. How many valves & types used in Raising main? Explain about Cooling Lubrication system.
  • Ans. 

    The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.

    • The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.

    • The raising main typically has gate valves, check valves, and air release valves.

    • The cooling lubrication system is responsib...

  • Answered by AI
  • Q2. Why are you going to quit the current job?
  • Ans. 

    I am looking for new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Wanting to expand my skill set and knowledge

    • Desire for a higher level of responsibility

    • Seeking a better work-life balance

    • Unsatisfied with the current work environment or company culture

  • Answered by AI
  • Q3. What is your salary expectation?
  • Ans. 

    I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.

    • I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.

    • I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident..
Be Genuine..
Listen each & every Qustion or case study & Explain properly as per practical conditions.

Bechtel Interview FAQs

How many rounds are there in Bechtel Project Control Manager interview?
Bechtel interview process usually has 1-2 rounds. The most common rounds in the Bechtel interview process are Technical and Resume Shortlist.
How to prepare for Bechtel Project Control Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Bechtel. The most common topics and skills that interviewers at Bechtel expect are Change Management, Forecasting, Scheduling, Claims Adjudication and Mining Engineering.
What are the top questions asked in Bechtel Project Control Manager interview?

Some of the top questions asked at the Bechtel Project Control Manager interview -

  1. Any example in project that effect the entire project technically and economica...read more
  2. How would you manage design of power pl...read more
  3. Standard data is on my tips and that becomes the basis for another on based on ...read more

Tell us how to improve this page.

Bechtel Project Control Manager Interview Process

based on 2 interviews

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 746 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 116 Interviews
Worley Interview Questions
4.1
 • 112 Interviews
AtkinsRealis Interview Questions
3.9
 • 87 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
View all
Bechtel Project Control Manager Salary
based on 6 salaries
₹47 L/yr - ₹96 L/yr
153% more than the average Project Control Manager Salary in India
View more details

Bechtel Project Control Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

4.0

Salary

3.0

Job security

3.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Senior Engineer
119 salaries
unlock blur

₹14 L/yr - ₹49 L/yr

Process Engineer
94 salaries
unlock blur

₹6 L/yr - ₹19.1 L/yr

Engineer
64 salaries
unlock blur

₹6 L/yr - ₹24 L/yr

Purchasing Specialist
63 salaries
unlock blur

₹6.5 L/yr - ₹20 L/yr

Senior Process Engineer
53 salaries
unlock blur

₹21 L/yr - ₹40.2 L/yr

Explore more salaries
Compare Bechtel with

L&T Construction

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview