I applied via campus placement at RSR Rungta College of Engineering and Technology, Bhilai and was interviewed in Apr 2024. There were 2 interview rounds.
An exam used to determine the individual skills or propensity to succeed in a given activity
I am most familiar with programming languages such as C++, Java, and Python.
C++
Java
Python
Debugging a program while it's being used requires monitoring and analyzing the program's behavior in real-time.
Use logging and monitoring tools to track the program's behavior and identify any errors or bugs.
Implement remote debugging capabilities to troubleshoot issues in real-time.
Utilize debugging tools that allow for live debugging and inspection of variables and code execution.
Implement error handling mechanisms ...
I applied via Walk-in
Reasoning, analytical reasoning, spatial reasoning, critical thinking, numerical reasoning, conceptual reasoning, quantitative
Like question about study what can I do
L&T Construction interview questions for designations
I applied via campus placement at Visveswaraiah Technological University (VTU) and was interviewed in Mar 2022. There were 5 interview rounds.
Civil engineering concepts
Present covid situation
The mix ratio of concrete determines its strength. Concrete achieves its strength over a period of time.
The mix ratio of concrete refers to the proportion of cement, sand, and aggregate used in the mixture.
The strength of concrete is measured in terms of its compressive strength, which is the maximum load it can bear without failure.
The number of days required for concrete to achieve its strength depends on various fac...
I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.
I applied via Approached by Company
Branch subject
5 member
Top trending discussions
Embankment is a raised bank or wall built to carry a road or to hold back water.
Embankment is a raised structure made of earth or other materials to support a road or railway.
Earthwork process involves moving, processing, and placing soil or rock to create embankments, excavations, or other earth structures.
Embankments are commonly used in road construction to elevate the road above the surrounding terrain.
Earthwork pr...
PQC laying stands for Pavement Quality Concrete laying, which is the final layer of concrete pavement on roads.
PQC laying is the process of laying the final layer of concrete pavement on roads.
It is done after the base and sub-base layers have been prepared and compacted.
PQC laying ensures a smooth and durable surface for vehicles to travel on.
Proper curing of PQC is essential to prevent cracks and ensure longevity.
Exa...
RCC drain is a reinforced concrete drain used for efficient drainage of rainwater or wastewater.
RCC drain is made of reinforced concrete to provide strength and durability.
It is used to efficiently channel rainwater or wastewater away from roads, buildings, or other structures.
RCC drains come in various shapes and sizes depending on the specific drainage requirements.
These drains are commonly used in urban areas to pre...
Kerb laying is the process of installing and positioning curbs along the edges of roads or pavements.
Kerb laying involves setting out the alignment and levels for the curbs.
The curbs are then placed and fixed in position using concrete or other suitable materials.
Kerb laying helps define the edges of roads, provide structural support, and prevent vehicles from driving off the road.
Properly laid curbs enhance the overal...
Kerb painting and road marking are techniques used to designate specific areas on roads for various purposes.
Kerb painting involves painting the edges of the road, usually in a specific color, to indicate parking restrictions, loading zones, or pedestrian crossings.
Road marking includes painting lines, symbols, and signs on the road surface to guide traffic, indicate lanes, show pedestrian crossings, and warn of hazard...
posted on 23 May 2023
posted on 15 Dec 2023
I applied via Campus Placement and was interviewed before Dec 2022. There were 2 interview rounds.
Like,transportation engineering, irrigation engineering,geotachnical engineering
Design of structure, open channel flow, basic fluid mechanics..
based on 4 interviews
1 Interview rounds
based on 4 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
711
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
498
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Construction Management
332
salaries
| ₹8.2 L/yr - ₹35 L/yr |
Assistant Engineering Manager
321
salaries
| ₹6 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA