I applied via Walk-in and was interviewed before May 2021. There were 3 interview rounds.
Top trending discussions
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
posted on 20 Jul 2017
posted on 14 Jan 2022
I applied via Walk-in and was interviewed before Jan 2021. There were 3 interview rounds.
The least count of staff reading is the smallest measurement that can be read and recorded using the staff.
The least count is determined by the smallest division on the staff scale.
It is usually expressed in millimeters or centimeters.
For example, if the smallest division on the staff scale is 1 mm, then the least count is 1 mm.
The least count is important in accurately measuring and recording distances in civil engine
posted on 14 Feb 2021
PQC stands for Pavement Quality Concrete. It is a type of concrete used for road construction.
PQC is a high-quality concrete mix used for the construction of rigid pavements.
It is designed to withstand heavy traffic loads and resist wear and tear.
PQC is made with a higher cement content and a lower water-cement ratio than regular concrete.
It is also reinforced with steel bars or fibers to increase its strength and dura...
posted on 2 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 27 Mar 2021
I applied via Campus Placement and was interviewed in Sep 2020. There were 4 interview rounds.
posted on 1 Sep 2021
I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.
posted on 22 Jul 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
The question is incomplete and does not make sense.
The question is missing important information.
It is unclear what the question is asking for.
There is no context provided for the question.
Without more information, it is impossible to answer the question.
The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.
The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.
The ratio indicates the compressive strength of the concrete after 28 days of curing.
For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.
T...
based on 9 reviews
Rating in categories
Assistant Manager
102
salaries
| ₹3 L/yr - ₹9.8 L/yr |
Senior Engineer
65
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Site Engineer
51
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Field Engineer
46
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Civil Engineer
44
salaries
| ₹2.2 L/yr - ₹8.5 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company