Upload Button Icon Add office photos

Filter interviews by

Feedback Infrastructure Services Project Engineer Interview Questions and Answers

Updated 26 Jul 2022

Feedback Infrastructure Services Project Engineer Interview Experiences

1 interview found

I applied via Walk-in and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Project related questions
  • Q2. Attitude testing client relationship
Round 3 - HR 

(2 Questions)

  • Q1. Quilification related queries
  • Q2. Salary requirements on the details

Interview Preparation Tips

Interview preparation tips for other job seekers - quilification experience comunication client relationship contract relationship problems solution project related questions public dealing etc.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. From project conception to execution, what would you do to ensure successful delivery
  • Ans. 

    To ensure successful delivery from project conception to execution, I would focus on clear communication, detailed planning, proactive problem-solving, and regular monitoring.

    • Establish clear project goals and objectives

    • Create a detailed project plan with timelines and milestones

    • Regularly communicate with stakeholders to ensure alignment and address any issues

    • Proactively identify and address potential risks and challeng...

  • Answered by AI
  • Q2. What technical experience do you have
  • Ans. 

    I have over 5 years of technical experience in project management, construction, and engineering design.

    • Managed multiple construction projects from initiation to completion

    • Proficient in AutoCAD and other design software

    • Experience in creating project schedules and budgets

    • Knowledge of construction materials and methods

    • Collaborated with cross-functional teams to ensure project success

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. HydroTest of DI and HDPE pipe
  • Ans. 

    Hydrostatic testing is a common method used to test the integrity of DI and HDPE pipes by pressurizing them with water.

    • Hydrostatic testing involves filling the pipe with water and pressurizing it to a specified level to check for leaks or weaknesses.

    • DI (Ductile Iron) pipes are typically tested at 1.5 times their working pressure, while HDPE (High-Density Polyethylene) pipes are tested at 1.25 times their working pressu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Bhai Vegetarian food allowed hai no nonveg food allowed. Aur Daru cigrette nahi pite to company tumhare baap ki samjho .
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to calculated pump head
  • Ans. 

    Pump head is calculated by adding the static head, friction head, and velocity head.

    • Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.

    • Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.

    • Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the accele...

  • Answered by AI
  • Q2. How to oprate the fire alaram system
  • Ans. 

    To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.

    • Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.

    • Evacuate the building immediately using the nearest exit and do not use elevators.

    • Wait for emergency responders to arrive and provide them with any relevant information about the situation.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If existing staff learn to junior company growth will not held up
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Billing Site work
  • Q2. Billing and Site work
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Easy , kust want consistency and willingness to trelocate far off places

Round 2 - One-on-one 

(1 Question)

  • Q1. How would you deal with remote location of work
  • Ans. 

    I would ensure proper planning, communication, and use of technology to effectively manage work in remote locations.

    • Establish clear communication channels with team members and stakeholders

    • Utilize project management tools for tracking progress and deadlines

    • Implement regular check-ins and updates to ensure everyone is on the same page

    • Consider logistics and transportation challenges when planning work schedules

    • Leverage t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be confident and take care of optics
Round 1 - Technical 

(1 Question)

  • Q1. They will ask basic technical questions on concrete technology

Interview Preparation Tips

Interview preparation tips for other job seekers - You should study the subject 1) concrete technology
2) soil mechanics
3) bending moment
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I was interviewed before Jan 2023.

Round 1 - Technical 

(2 Questions)

  • Q1. Before where are you sevice.whyyoutransfer the company.
  • Q2. I am worked us my home near place.
Round 2 - Technical 

(1 Question)

  • Q1. Nature of duty.
  • Ans. 

    The nature of duty for a project engineer involves planning, coordinating, and overseeing various aspects of a project.

    • Planning and organizing project activities

    • Coordinating with team members and stakeholders

    • Managing project timelines and budgets

    • Ensuring compliance with project specifications and regulations

    • Monitoring project progress and resolving issues

    • Preparing project reports and documentation

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. My experience certificate not available

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary pay every month,accommodations,Transportation,food,leave,all details discussed with interview time.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Civil Structural work
Round 2 - One-on-one 

(1 Question)

  • Q1. Any interviews questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via KEC official and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. All Substation related work
  • Q2. All Electrical related work

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Feedback Infrastructure Services Interview FAQs

How many rounds are there in Feedback Infrastructure Services Project Engineer interview?
Feedback Infrastructure Services interview process usually has 3 rounds. The most common rounds in the Feedback Infrastructure Services interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Feedback Infrastructure Services Project Engineer interview?

Some of the top questions asked at the Feedback Infrastructure Services Project Engineer interview -

  1. Attitude testing client relations...read more
  2. Project related questi...read more
  3. Quilification related quer...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Feedback Infrastructure Services interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Feedback Infrastructure Services Project Engineer Salary
based on 39 salaries
₹3 L/yr - ₹5.1 L/yr
25% less than the average Project Engineer Salary in India
View more details

Feedback Infrastructure Services Project Engineer Reviews and Ratings

based on 9 reviews

4.2/5

Rating in categories

4.2

Skill development

4.3

Work-Life balance

3.5

Salary & Benefits

3.3

Job Security

3.7

Company culture

3.5

Promotions/Appraisal

4.1

Work Satisfaction

Explore 9 Reviews and Ratings
Assistant Manager
110 salaries
unlock blur

₹3 L/yr - ₹10.9 L/yr

Field Engineer
105 salaries
unlock blur

₹1.5 L/yr - ₹4.5 L/yr

Site Engineer
72 salaries
unlock blur

₹1.8 L/yr - ₹5.4 L/yr

Senior Engineer
69 salaries
unlock blur

₹3.6 L/yr - ₹10.2 L/yr

Project Manager
45 salaries
unlock blur

₹5 L/yr - ₹16.8 L/yr

Explore more salaries
Compare Feedback Infrastructure Services with

Shapoorji Pallonji Group

4.2
Compare

Kalpataru Projects International

4.2
Compare

KEC International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview