Upload Button Icon Add office photos

Filter interviews by

Dilip Buildcon Interview Questions, Process, and Tips

Updated 15 Dec 2024

Top Dilip Buildcon Interview Questions and Answers

View all 98 questions

Dilip Buildcon Interview Experiences

Popular Designations

138 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Planning & billing
  • Q2. Quantity Survey Related
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Machinery,Staf&Public sefy,Only Used Required Materials But Not Work Place Materials Besttege ets.
  • Q2. Sub.top,gsb,wmm,dlc, pqc,dbm,bc,curb, drain, w-metalbim,rfi, level sheet, billing, ets.

Interview Preparation Tips

Interview preparation tips for other job seekers - I Hereby Declare That The Above Mentioned Details Are True To The Best Of My Knowledge.

Highway Engineer Interview Questions asked at other Companies

Q1. What is the density of soil in embankment layer.
View answer (7)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Oct 2023.

Round 1 - Technical 

(2 Questions)

  • Q1. How many chambers are there in an OHT
  • Ans. 

    There are typically two chambers in an overhead tank (OHT).

    • Most OHTs have two chambers - one for storing water and one for controlling the water level.

    • The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.

    • Having two chambers helps in maintaining a consistent water supply and pressure in the tank.

  • Answered by AI
  • Q2. What is the concrete and reinforcement quantity in an OHT
  • Ans. 

    The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.

    • Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.

    • Reinforcement quantity is determined by the structural design requirements for strength and durability.

    • Factors such as load capacity, water pressure, and seismic considerations also impa...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your Expected CTC
  • Ans. 

    My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.

    • My expected CTC is based on industry standards and my level of experience.

    • I am open to discussing the compensation package during the interview process.

    • I am looking for a competitive salary that reflects my skills and contributions to the company.

  • Answered by AI

Construction Management Interview Questions asked at other Companies

Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
View answer (2)

HR Assistant Interview Questions & Answers

user image Jagveer Singh

posted on 30 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(5 Questions)

  • Q1. Hr assistant are required
  • Q2. Security guard handle
  • Q3. Food material handle
  • Q4. Billing handling
  • Q5. Guard joining handling

HR Assistant Interview Questions asked at other Companies

Q1. What's your understanding about documentation and background verification
View answer (3)

Dilip Buildcon interview questions for popular designations

 Highway Engineer

 (6)

 Asst Store

 (4)

 Senior Engineer

 (4)

 Surveyor

 (4)

 Data Entry Operator

 (3)

 Junior Engineer

 (3)

 Mechanical Engineer

 (3)

 Safety Engineer

 (3)

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Scanner and software
  • Q2. Auto cad, surpac

Survey Manager Interview Questions asked at other Companies

Q1. Have you used DGPS for fixing control points ?
View answer (3)

Get interview-ready with Top Dilip Buildcon Interview Questions

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How can complete your target widin time ?
  • Ans. 

    To complete my target within time, I prioritize tasks, set realistic deadlines, communicate effectively with team members, and regularly track progress.

    • Prioritize tasks based on importance and deadlines

    • Set realistic deadlines and break down tasks into smaller achievable goals

    • Communicate effectively with team members to ensure everyone is on the same page

    • Regularly track progress and make adjustments as needed

    • Use tools l...

  • Answered by AI
  • Q2. What is your aim about project

Interview Preparation Tips

Interview preparation tips for other job seekers - Postive thinking about project

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

Jobs at Dilip Buildcon

View all

Surveyor Interview Questions & Answers

user image Anonymous

posted on 13 Jul 2023

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Working purpose , technical specifications, related work
  • Q2. Why are you choosing department
  • Q3. About handling instruments
  • Q4. Handling your position
  • Q5. What's your best platform

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Knowledge

Surveyor Interview Questions asked at other Companies

Q1. How much bench marks important your total station for centre line marking.
View answer (3)

Team Manager Interview Questions & Answers

user image Anonymous

posted on 9 May 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell me about your previous experience

Team Manager Interview Questions asked at other Companies

Q1. To maintain SIEM solution which are the daily activities that you will perform?
View answer (4)

Site Engineer Interview Questions & Answers

user image Ravi Ranjan Kumar

posted on 9 Feb 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Structure MJB. MNB

Interview Preparation Tips

Topics to prepare for Dilip Buildcon Site Engineer interview:
  • Structure

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Surveying questions and tbm
  • Q2. Highway and structure

Interview Preparation Tips

Interview preparation tips for other job seekers - Dbl is best for working employe

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

Dilip Buildcon Interview FAQs

How many rounds are there in Dilip Buildcon interview?
Dilip Buildcon interview process usually has 1-2 rounds. The most common rounds in the Dilip Buildcon interview process are Technical, Resume Shortlist and HR.
How to prepare for Dilip Buildcon interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Dilip Buildcon. The most common topics and skills that interviewers at Dilip Buildcon expect are Monitoring, Budgeting, General Management, Marketing and Safety.
What are the top questions asked in Dilip Buildcon interview?

Some of the top questions asked at the Dilip Buildcon interview -

  1. How many types of fire extinguisher how many types of sign board what is safe...read more
  2. What is output of grader . What is output of poclane machin...read more
  3. What is soil mechanism in the road. What CBR VALUE OF EMBODIMENT,SUBGR...read more
How long is the Dilip Buildcon interview process?

The duration of Dilip Buildcon interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Dilip Buildcon Interview Process

based on 38 interviews in last 1 year

Interview experience

4.4
  
Good
View more

People are getting interviews through

based on 87 Dilip Buildcon interviews
Company Website
Job Portal
WalkIn
Referral
Recruitment Consultant
Campus Placement
24%
22%
20%
13%
6%
1%
14% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

Fast track your campus placements

View all

Dilip Buildcon Reviews and Ratings

based on 2.3k reviews

4.0/5

Rating in categories

3.8

Skill development

3.7

Work-Life balance

3.7

Salary & Benefits

3.5

Job Security

3.7

Company culture

3.4

Promotions/Appraisal

3.8

Work Satisfaction

Explore 2.3k Reviews and Ratings
Engineer/SR Electricain/Electrician

Nagpur

3-8 Yrs

Not Disclosed

AGM/Sr Manager/Manager - Quality Audit

Bhopal

10-15 Yrs

₹ 10-17 LPA

Explore more jobs
Senior Engineer
245 salaries
unlock blur

₹4 L/yr - ₹10.9 L/yr

Store Executive
204 salaries
unlock blur

₹2.2 L/yr - ₹5.2 L/yr

Asst Store
196 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Structural Engineer
181 salaries
unlock blur

₹2.7 L/yr - ₹6.7 L/yr

Mechanical Engineer
175 salaries
unlock blur

₹2.2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare Dilip Buildcon with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview