Filter interviews by
Specification of machinery refers to the detailed requirements and characteristics of a machine or equipment.
Includes dimensions, materials, performance criteria, and safety features
Should be clearly defined to ensure proper design and functionality
Examples: maximum load capacity, operating temperature range, power consumption
I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.
My strengths include attention to detail, problem-solving skills, and technical expertise. My weaknesses include being overly critical of my own work and sometimes struggling with time management.
Strength: Attention to detail - I have a keen eye for spotting errors and inconsistencies in designs and technical processes.
Strength: Problem-solving skills - I enjoy analyzing complex problems and finding innovative solution...
Quantity surveying is a profession that involves managing and controlling costs related to construction projects.
Quantity surveyors estimate and monitor project costs.
They prepare bills of quantities, tender documents, and contracts.
They provide advice on cost-effective construction methods and materials.
Quantity surveyors also handle cost control, valuation of work done, and final account settlement.
They play a crucia...
Key skills required for a Quantity Surveyor include strong analytical abilities, attention to detail, excellent communication skills, and proficiency in relevant software.
Strong analytical abilities to accurately estimate costs and quantities.
Attention to detail to ensure accurate measurements and calculations.
Excellent communication skills to effectively collaborate with clients, contractors, and other stakeholders.
Pr...
A cost estimate is an approximation of the financial resources required to complete a project or task.
A cost estimate is used to determine the budget for a project or task.
It involves analyzing the various components and factors that contribute to the overall cost.
Cost estimates can be based on historical data, expert judgment, or mathematical models.
They are typically expressed as a range or a single value.
Cost estima...
A takeoff is the process of quantifying and measuring materials needed for a construction project.
Takeoff involves analyzing construction plans and specifications to determine the quantities of materials required.
It includes measuring lengths, areas, volumes, and counts of various components such as walls, floors, doors, windows, etc.
Takeoff is essential for estimating project costs, ordering materials, and planning co...
An escalation clause is a provision in a contract that allows for an increase in price or other terms under certain conditions.
An escalation clause is commonly used in construction contracts.
It provides a mechanism for adjusting the contract price based on changes in labor, material, or other costs.
For example, if the cost of steel increases significantly during the project, the escalation clause may allow for a price ...
A Quantity Surveyor focuses on estimating and managing construction costs, while a Valuer determines the value of properties.
Quantity Surveyors are involved in cost estimation, budgeting, and financial management of construction projects.
Valuers assess the value of properties, considering factors like location, condition, and market trends.
Quantity Surveyors work closely with architects, engineers, and contractors to e...
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
The planning initiation process involves defining the project scope, objectives, and deliverables.
Identify the need for planning
Define the project scope, objectives, and deliverables
Identify key stakeholders and their roles
Establish a project team
Develop a project charter or initiation document
Conduct a feasibility study
Identify risks and constraints
Define the planning timeline and milestones
The scheduling process involves considering durations in relation to productivity.
The scheduling process starts by identifying the tasks that need to be completed.
The duration of each task is estimated based on historical data or expert judgment.
Productivity levels are taken into account when determining the duration of tasks.
Factors such as employee skills, equipment availability, and potential bottlenecks are conside...
The productivity norms in planning management vary across industries and sites.
Productivity norms in planning management are specific to each industry and site.
These norms are determined based on factors such as the nature of work, resources available, and industry standards.
For example, in the manufacturing industry, the productivity norm for planning managers may be measured in terms of units produced per hour.
In the...
Trackers are prepared for site tracking and schedule upgradation.
Trackers are tools used to monitor and track progress on a site or project.
They help in keeping track of tasks, deadlines, and milestones.
Trackers can be in the form of spreadsheets, software, or project management tools.
They provide visibility into the status of various activities and help in identifying bottlenecks or delays.
Upgradation of schedules inv...
Dilip Buildcon interview questions for popular designations
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
Safety officers are responsible for ensuring the safety of employees, visitors, and the workplace environment.
Developing and implementing safety policies and procedures
Conducting regular safety inspections and audits
Providing safety training to employees
Investigating accidents and incidents to determine causes and prevent future occurrences
Ensuring compliance with safety regulations and standards
There are five main types of fire extinguishers: water, foam, dry powder, CO2, and wet chemical.
Water fire extinguishers are suitable for Class A fires involving solid materials like wood or paper.
Foam fire extinguishers are effective for Class A and B fires involving flammable liquids like petrol or oil.
Dry powder fire extinguishers are suitable for Class A, B, and C fires involving flammable gases.
CO2 fire extinguish...
There are various types of permits required for different activities in a workplace.
Work Permit - for tasks like hot work, confined space entry, etc.
Electrical Permit - for electrical work like installations, repairs, etc.
Excavation Permit - for digging or excavation work.
Permit to Work at Height - for tasks performed at elevated locations.
Permit to Work with Hazardous Materials - for handling dangerous substances.
Perm...
There are three main types of hazard control methods: engineering controls, administrative controls, and personal protective equipment (PPE).
Engineering controls involve physically changing the workplace to reduce or eliminate hazards, such as installing machine guards or ventilation systems.
Administrative controls focus on changing work practices or policies to minimize exposure to hazards, such as implementing safety...
Get interview-ready with Top Dilip Buildcon Interview Questions
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
IS 2911 is the Indian Standard code for design and construction of pile foundations.
IS 2911 is the code for design and construction of pile foundations in India.
It covers various types of piles including driven piles, bored cast-in-situ piles, etc.
The code provides guidelines for the design, materials, construction, and testing of piles.
It ensures the safety and stability of structures supported by piles.
Example: IS 29...
The density of bentonite during piling is typically around 1.0 to 1.2 g/cm^3.
The density of bentonite can vary depending on the specific type and concentration used.
Higher density bentonite is often preferred for better support during piling operations.
Typical range of density for bentonite during piling is 1.0 to 1.2 g/cm^3.
Qualification and Post related questions and personal details questions
I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Company restructuring or downsizing
Relocation to a new area
Currently working in a construction company in downtown Los Angeles.
Working in downtown Los Angeles
Construction company
Civil engineering job
Top trending discussions
Some of the top questions asked at the Dilip Buildcon interview -
The duration of Dilip Buildcon interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 166 interviews
Interview experience
based on 2.4k reviews
Rating in categories
Senior Engineer
212
salaries
| â‚ą4 L/yr - â‚ą11 L/yr |
Assistant Manager
203
salaries
| â‚ą3.4 L/yr - â‚ą10.5 L/yr |
Asst Store
201
salaries
| â‚ą1.5 L/yr - â‚ą4.2 L/yr |
Store Executive
193
salaries
| â‚ą2.2 L/yr - â‚ą5 L/yr |
Structural Engineer
178
salaries
| â‚ą2.7 L/yr - â‚ą6.7 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
PNC Infratech