I appeared for an interview in Oct 2023.
There are typically two chambers in an overhead tank (OHT).
Most OHTs have two chambers - one for storing water and one for controlling the water level.
The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.
Having two chambers helps in maintaining a consistent water supply and pressure in the tank.
The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.
Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.
Reinforcement quantity is determined by the structural design requirements for strength and durability.
Factors such as load capacity, water pressure, and seismic considerations also impa...
My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.
My expected CTC is based on industry standards and my level of experience.
I am open to discussing the compensation package during the interview process.
I am looking for a competitive salary that reflects my skills and contributions to the company.
Top trending discussions
posted on 27 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
The sequence of toilet finishes refers to the order in which different materials and fixtures are installed in a toilet during construction or renovation.
The first step is usually to install the plumbing and drainage system for the toilet.
Next, the walls and floors are prepared and waterproofed.
After that, the fixtures such as toilets, sinks, and urinals are installed.
Following the installation of fixtures, the walls a...
posted on 5 Aug 2021
posted on 24 Jul 2022
I appeared for an interview before Jul 2021.
posted on 25 Dec 2023
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
Past Projects details to explain,
We used bored pile foundation method in our previous project.
Bored pile foundation method was used for piling in the previous project.
The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.
Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.
The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.
Operating pile driving equipment efficiently
Maintaining and repairing equipment as needed
Ensuring safety protocols are followed during pile driving operations
The density of a polymer refers to its mass per unit volume.
Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).
The density of a polymer can vary depending on factors such as its chemical composition and structure.
For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.
Higher density polymers tend to be more rigid and have higher melting points.
The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.
Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.
The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.
Water test details should include para...
posted on 6 May 2022
I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.
posted on 11 Dec 2024
I appeared for an interview in Mar 2024.
posted on 15 Sep 2023
I applied via Newspaper Ad and was interviewed before Sep 2022. There were 2 interview rounds.
based on 2 interviews
Interview experience
based on 17 reviews
Rating in categories
Assistant Manager
210
salaries
| ₹4 L/yr - ₹12.1 L/yr |
Senior Engineer
210
salaries
| ₹4 L/yr - ₹10.9 L/yr |
Asst Store
202
salaries
| ₹1.6 L/yr - ₹4 L/yr |
Store Executive
190
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Structural Engineer
179
salaries
| ₹2 L/yr - ₹6.7 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures