There are typically two chambers in an overhead tank (OHT).
Most OHTs have two chambers - one for storing water and one for controlling the water level.
The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.
Having two chambers helps in maintaining a consistent water supply and pressure in the tank.
The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.
Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.
Reinforcement quantity is determined by the structural design requirements for strength and durability.
Factors such as load capacity, water pressure, and seismic considerations also impa...
My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.
My expected CTC is based on industry standards and my level of experience.
I am open to discussing the compensation package during the interview process.
I am looking for a competitive salary that reflects my skills and contributions to the company.
posted on 12 Dec 2023
posted on 20 Feb 2025
I appeared for an interview before Feb 2024.
I have held various jobs in construction, including project manager, site supervisor, and estimator.
Project Manager: Oversaw multiple construction projects, managed budgets and schedules.
Site Supervisor: Supervised construction crews, ensured safety regulations were followed.
Estimator: Prepared cost estimates for construction projects, analyzed blueprints and specifications.
I have encountered complications and risks in construction projects and have learned to avoid them through careful planning and communication.
Identifying potential risks early on in the project and creating a risk management plan
Regular communication with all stakeholders to address any issues or concerns before they escalate
Implementing quality control measures to ensure work is done correctly and to specifications
Ada...
posted on 14 Mar 2023
I appeared for an interview before Mar 2022.
posted on 7 Aug 2023
I applied via Walk-in and was interviewed before Aug 2022. There were 3 interview rounds.
posted on 22 Jul 2022
I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 3 interview rounds.
posted on 18 Apr 2024
based on 5 reviews
Rating in categories
Engineer
865
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Senior Engineer
842
salaries
| ₹3.2 L/yr - ₹11.5 L/yr |
Associate Manager
513
salaries
| ₹4.8 L/yr - ₹15.8 L/yr |
Mechanical Engineer
388
salaries
| ₹2.1 L/yr - ₹7.3 L/yr |
Civil Engineer
344
salaries
| ₹2.2 L/yr - ₹7.6 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies