Dilip Buildcon Construction Management Interview Questions and Answers

Updated 22 Jul 2024

Dilip Buildcon Construction Management Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Oct 2023.

Round 1 - Technical 

(2 Questions)

  • Q1. How many chambers are there in an OHT
  • Ans. 

    There are typically two chambers in an overhead tank (OHT).

    • Most OHTs have two chambers - one for storing water and one for controlling the water level.

    • The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.

    • Having two chambers helps in maintaining a consistent water supply and pressure in the tank.

  • Answered by AI
  • Q2. What is the concrete and reinforcement quantity in an OHT
  • Ans. 

    The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.

    • Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.

    • Reinforcement quantity is determined by the structural design requirements for strength and durability.

    • Factors such as load capacity, water pressure, and seismic considerations also impa...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your Expected CTC
  • Ans. 

    My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.

    • My expected CTC is based on industry standards and my level of experience.

    • I am open to discussing the compensation package during the interview process.

    • I am looking for a competitive salary that reflects my skills and contributions to the company.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What About yourself
  • Q2. About your knowledge

Construction Management Interview Questions Asked at Other Companies

Q1. What are the different issues(technical & administrative) fac ... read more
Q2. What types of activities have you engaged in, including planning, ... read more
Q3. How much of quantity of piping done at ur location and the total ... read more
asked in HCC-VCCL JV
Q4. What is Top Down method and what is tha complete procedure of con ... read more
asked in HCC-VCCL JV
Q5. What is soldier pile and where is it required to construct?

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about your experience
  • Ans. 

    I have over 10 years of experience in construction management, overseeing various projects from start to finish.

    • Managed multiple construction projects simultaneously

    • Coordinated with architects, engineers, and subcontractors

    • Ensured projects were completed on time and within budget

    • Implemented safety protocols and quality control measures

    • Handled project documentation and reporting

    • Led a team of construction professionals

  • Answered by AI
  • Q2. What is your project in M.Tech
  • Ans. 

    My project in M.Tech focused on sustainable construction practices using recycled materials.

    • Researched various recycled materials suitable for construction

    • Conducted experiments to test the strength and durability of these materials

    • Developed guidelines for incorporating recycled materials in construction projects

    • Collaborated with industry professionals to implement sustainable practices

    • Presented findings at conferences

  • Answered by AI
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Mech engineering
  • Q2. All about rotatory parts

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with all preparation

I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me the best thing you have done in your previous project.
  • Q2. Tell me your achievement.
Round 2 - HR 

(1 Question)

  • Q1. Salary expectation and notice period required to join the organization.

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through the profile properly. Some profile needs efforts. They will give good salary also. You need to show your competency while working in TPL.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Aug 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Online interview 

(2 Questions)

  • Q1. Tell me about yourself.. (
  • Q2. Work experience? Briefly discussion about work, roles & responsibility.

Interview Preparation Tips

Interview preparation tips for other job seekers - Describe confidently about your roles & Responsibility, make them able to understand easily about your skills.

I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About reconciliation of steel

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good but till last round they call upto payment negotiations then they hold suddenly
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What types of jobs have you held, and can you explain each of them?
  • Ans. 

    I have held various jobs in construction, including project manager, site supervisor, and estimator.

    • Project Manager: Oversaw multiple construction projects, managed budgets and schedules.

    • Site Supervisor: Supervised construction crews, ensured safety regulations were followed.

    • Estimator: Prepared cost estimates for construction projects, analyzed blueprints and specifications.

  • Answered by AI
  • Q2. What complications and risks have you encountered, and how have you learned to avoid them?
  • Ans. 

    I have encountered complications and risks in construction projects and have learned to avoid them through careful planning and communication.

    • Identifying potential risks early on in the project and creating a risk management plan

    • Regular communication with all stakeholders to address any issues or concerns before they escalate

    • Implementing quality control measures to ensure work is done correctly and to specifications

    • Ada...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

Past Projects details to explain,

Round 3 - Technical 

(5 Questions)

  • Q1. Past Projects Technical
  • Q2. What type of Piling Mech your using previous project
  • Ans. 

    We used bored pile foundation method in our previous project.

    • Bored pile foundation method was used for piling in the previous project.

    • The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.

    • Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.

  • Answered by AI
  • Q3. What is the pile rig tark of Rig Mech
  • Ans. 

    The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.

    • Operating pile driving equipment efficiently

    • Maintaining and repairing equipment as needed

    • Ensuring safety protocols are followed during pile driving operations

  • Answered by AI
  • Q4. What is density of polymer,
  • Ans. 

    The density of a polymer refers to its mass per unit volume.

    • Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).

    • The density of a polymer can vary depending on factors such as its chemical composition and structure.

    • For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.

    • Higher density polymers tend to be more rigid and have higher melting points.

  • Answered by AI
  • Q5. Viscosity of polymer before starting the pile boring, what is the pH value should be before boring, water test details,
  • Ans. 

    The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.

    • Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.

    • The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.

    • Water test details should include para...

  • Answered by AI

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. Sequence of toilets finishes
  • Ans. 

    The sequence of toilet finishes refers to the order in which different materials and fixtures are installed in a toilet during construction or renovation.

    • The first step is usually to install the plumbing and drainage system for the toilet.

    • Next, the walls and floors are prepared and waterproofed.

    • After that, the fixtures such as toilets, sinks, and urinals are installed.

    • Following the installation of fixtures, the walls a...

  • Answered by AI

Dilip Buildcon Interview FAQs

How many rounds are there in Dilip Buildcon Construction Management interview?
Dilip Buildcon interview process usually has 1-2 rounds. The most common rounds in the Dilip Buildcon interview process are One-on-one Round, Technical and HR.
How to prepare for Dilip Buildcon Construction Management interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Dilip Buildcon. The most common topics and skills that interviewers at Dilip Buildcon expect are Construction Management, Bridges, Civil Project Management, Construction Supervision and Estimation.
What are the top questions asked in Dilip Buildcon Construction Management interview?

Some of the top questions asked at the Dilip Buildcon Construction Management interview -

  1. What is the concrete and reinforcement quantity in an ...read more
  2. How many chambers are there in an ...read more
  3. What is your Expected ...read more

Tell us how to improve this page.

Dilip Buildcon Construction Management Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Fast track your campus placements

View all
Dilip Buildcon Construction Management Salary
based on 77 salaries
₹9.6 L/yr - ₹22 L/yr
14% less than the average Construction Management Salary in India
View more details

Dilip Buildcon Construction Management Reviews and Ratings

based on 16 reviews

3.2/5

Rating in categories

2.1

Skill development

2.8

Work-life balance

3.3

Salary

2.3

Job security

2.2

Company culture

2.1

Promotions

2.9

Work satisfaction

Explore 16 Reviews and Ratings
Senior Engineer
213 salaries
unlock blur

₹4 L/yr - ₹11 L/yr

Assistant Manager
206 salaries
unlock blur

₹3.4 L/yr - ₹10.5 L/yr

Asst Store
202 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Store Executive
197 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Structural Engineer
179 salaries
unlock blur

₹2 L/yr - ₹6.7 L/yr

Explore more salaries
Compare Dilip Buildcon with

Ashoka Buildcon

4.0
Compare

IRB Infrastructure

4.1
Compare

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare