The sequence of toilet finishes refers to the order in which different materials and fixtures are installed in a toilet during construction or renovation.
The first step is usually to install the plumbing and drainage system for the toilet.
Next, the walls and floors are prepared and waterproofed.
After that, the fixtures such as toilets, sinks, and urinals are installed.
Following the installation of fixtures, the walls a...
posted on 5 Aug 2021
posted on 27 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
posted on 28 Apr 2024
I appeared for an interview in Oct 2023.
There are typically two chambers in an overhead tank (OHT).
Most OHTs have two chambers - one for storing water and one for controlling the water level.
The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.
Having two chambers helps in maintaining a consistent water supply and pressure in the tank.
The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.
Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.
Reinforcement quantity is determined by the structural design requirements for strength and durability.
Factors such as load capacity, water pressure, and seismic considerations also impa...
My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.
My expected CTC is based on industry standards and my level of experience.
I am open to discussing the compensation package during the interview process.
I am looking for a competitive salary that reflects my skills and contributions to the company.
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
posted on 24 Mar 2025
A construction site management system coordinates resources, schedules, and safety protocols to ensure efficient project execution.
Facilitates project planning and scheduling, e.g., Gantt charts for timeline management.
Tracks resource allocation, such as labor, materials, and equipment.
Enhances communication among stakeholders, including contractors, subcontractors, and clients.
Implements safety management protocols to...
Estimation and cost analysis in construction involves assessing project costs and resources for effective budgeting and planning.
Define project scope: Clearly outline the project's objectives and deliverables.
Gather historical data: Use past project costs as a benchmark for estimation.
Break down tasks: Divide the project into smaller tasks for detailed cost analysis.
Estimate costs: Calculate direct and indirect costs, ...
Effective team leadership in construction involves communication, motivation, and conflict resolution to achieve project goals.
Clear Communication: Ensuring all team members understand project goals and their roles. For example, holding regular briefings.
Motivation: Encouraging team members through recognition and support. For instance, celebrating milestones to boost morale.
Conflict Resolution: Addressing disputes pro...
posted on 14 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
posted on 27 Apr 2024
I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.
based on 1 interview
Interview experience
Field Engineer
149
salaries
| ₹2.5 L/yr - ₹7.6 L/yr |
Senior Field Engineer
68
salaries
| ₹4.9 L/yr - ₹8 L/yr |
Resident Engineer
52
salaries
| ₹5.7 L/yr - ₹11.5 L/yr |
Assistant Manager
49
salaries
| ₹4.8 L/yr - ₹10.1 L/yr |
Senior Engineer
46
salaries
| ₹5.5 L/yr - ₹9.1 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures