i
Concentrix Corporation
Filter interviews by
I applied via Referral and was interviewed in Jan 2022. There was 1 interview round.
Hypothesis testing is a statistical method to test a hypothesis, P value is the probability of obtaining a result as extreme as the observed result, Projects completed refers to the number of projects successfully finished.
Hypothesis testing is used to determine if a hypothesis is true or false based on sample data
P value is the probability of obtaining a result as extreme as the observed result, assuming the null hypo...
Implemented Six Sigma projects to improve process efficiency and reduce defects.
Reduced customer complaints by 30% through a DMAIC project in the manufacturing industry.
Improved call center response time by 20% through a Lean Six Sigma project in the service industry.
Implemented a Six Sigma project to reduce medication errors in a hospital, resulting in a 50% decrease in errors.
Trained and mentored team members on Six ...
posted on 16 Jul 2023
I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.
SPC tools commonly used in Six Sigma include control charts, histograms, Pareto charts, scatter plots, and fishbone diagrams.
Control charts are used to monitor process stability over time.
Histograms display the distribution of data.
Pareto charts help identify the most significant factors affecting a process.
Scatter plots show the relationship between two variables.
Fishbone diagrams (Ishikawa or cause-and-effect diagram
FMEA stands for Failure Mode and Effects Analysis. It is used to identify and prioritize potential failures in a process or product.
FMEA is a systematic method for analyzing potential failure modes of a process or product.
It helps in identifying the potential effects of these failures on the system.
FMEA prioritizes the failures based on their severity, occurrence, and detection.
It is used to proactively address and mit...
Control charts are statistical tools used to monitor and control processes over time.
Control charts display process data over time, with a central line representing the average and upper/lower control limits.
They help identify trends, shifts, and outliers in the process performance.
Common types of control charts include X-bar and R charts, p charts, and c charts.
Control charts are used in quality control to ensure proc...
Control charts are used to monitor process variation and detect out-of-control conditions, while run charts simply display data over time.
Control charts have control limits to determine if a process is in control or out of control.
Run charts do not have control limits and are used to display trends over time.
Control charts are typically used in statistical process control to monitor process stability and identify speci...
Non parametric tests are statistical tests that do not make assumptions about the parameters of the population distribution.
Non parametric tests are used when the data does not meet the assumptions of parametric tests.
They are distribution-free tests, meaning they do not require the data to be normally distributed.
Examples of non parametric tests include Mann-Whitney U test, Wilcoxon signed-rank test, and Kruskal-Walli
Agile is a project management methodology that emphasizes flexibility, collaboration, and continuous improvement.
Agile focuses on delivering value to customers through iterative development and frequent feedback.
It promotes adaptive planning, evolutionary development, early delivery, and continuous improvement.
Agile helps teams respond to changes quickly and effectively, leading to better outcomes and higher customer s...
posted on 11 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 4 interview rounds.
based on 3 reviews
Rating in categories
Customer Service Executive
3.6k
salaries
| ₹0.9 L/yr - ₹7.8 L/yr |
Advisor
3.6k
salaries
| ₹0.9 L/yr - ₹7 L/yr |
Assistant Manager
3.3k
salaries
| ₹2.9 L/yr - ₹10.2 L/yr |
Senior Representative
3k
salaries
| ₹1.5 L/yr - ₹6.5 L/yr |
Content Moderator
2.9k
salaries
| ₹1.7 L/yr - ₹5 L/yr |
Teleperformance
Foundever
Wipro
Genpact