Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Afcons Infrastructure Team. If you also belong to the team, you can get access from here

Afcons Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Afcons Infrastructure Interview Questions, Process, and Tips

Updated 7 Mar 2025

Top Afcons Infrastructure Interview Questions and Answers

View all 139 questions

Afcons Infrastructure Interview Experiences

Popular Designations

207 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Teritory Sales Officer Interview Questions asked at other Companies

Q1. You have a product that had been performing good but since last few months there has been a competitor product that has pulled down your sales and market presence , what are your ideas on handling such a situation , how can you bring back t... read more
View answer (9)

Sun Pharmaceutical Industries

Join us and thrive in a company culture that inspires and empowers.

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-

Senior Civil Site Engineer Interview Questions asked at other Companies

Q1. B) What is PH value of water for Concrete of Construction ??
View answer (2)
Afcons Infrastructure Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain your work experience
  • Ans. 

    I have over 10 years of experience in logistics, including managing supply chains, coordinating transportation, and optimizing warehouse operations.

    • Managed end-to-end supply chain operations for a multinational company

    • Coordinated transportation of goods from suppliers to distribution centers

    • Implemented inventory management systems to optimize warehouse operations

    • Negotiated contracts with third-party logistics providers...

  • Answered by AI
  • Q2. Explain your knowledge, work, experience, achievements etc
  • Ans. 

    I have over 10 years of experience in logistics management, with a proven track record of optimizing supply chain operations and reducing costs.

    • Managed end-to-end logistics operations for multiple companies

    • Implemented cost-saving strategies such as route optimization and inventory management

    • Led cross-functional teams to improve efficiency and customer satisfaction

    • Achieved a 20% reduction in transportation costs within

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Previous Company related questions
  • Q2. Previous colleagues & Seniors

Interview Preparation Tips

Interview preparation tips for other job seekers - Important: your CV, experience, work knowledge.

Logistics Manager Interview Questions asked at other Companies

Q1. How to maximize the productivity in assigned source and budget. Key functions of logistics & transportation management. How to apply your knowledge when you are stuck in between approval and urgency and that performance is depends on yo... read more
View answer (4)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Oct 2023. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview experience is good and asking me about professional work experience and company work culture

Top Afcons Infrastructure Senior Engineer Interview Questions and Answers

Q1. Dozer transmission working
View answer (2)

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

Afcons Infrastructure interview questions for popular designations

 Senior Engineer

 (9)

 Planning Engineer

 (8)

 QA QC Engineer

 (6)

 Civil Execution Engineer

 (4)

 Civil Engineer

 (4)

 Site Engineer

 (4)

 Store Keeper

 (4)

 Civil Foreman

 (4)

HR Associate Interview Questions & Answers

user image Anonymous

posted on 4 Oct 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

HR Associate Interview Questions asked at other Companies

Q1. How will you convince the customer who is very frustated?
View answer (1)

Get interview-ready with Top Afcons Infrastructure Interview Questions

DPT.Manager Interview Questions & Answers

user image Anonymous

posted on 21 Sep 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Process of diaphragm wall work
  • Ans. 

    Diaphragm wall work involves creating a reinforced concrete wall underground.

    • Excavation of a trench to the required depth and width

    • Installation of reinforcement cages

    • Pouring concrete into the trench to form the wall

    • Excavation of panel by panel to create a continuous wall

    • Use of bentonite slurry to support the trench walls

  • Answered by AI
  • Q2. Tremie concrete method
  • Ans. 

    Tremie concrete method is a technique used to place concrete underwater without washing out the cement content.

    • Involves using a tremie pipe to place concrete underwater

    • The pipe is slowly raised as the concrete is poured to prevent segregation

    • Prevents cement washout and ensures proper placement and consolidation

    • Commonly used in construction of underwater structures like bridges, dams, and foundations

  • Answered by AI
  • Q3. Calculation of concrete hopper size for pile or diaphragm wall
  • Ans. 

    The concrete hopper size for pile or diaphragm wall is calculated based on the volume of concrete needed and the rate of pouring.

    • Calculate the volume of concrete needed for the pile or diaphragm wall

    • Determine the rate of pouring of concrete

    • Divide the volume of concrete by the rate of pouring to get the required hopper size

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Are you ready to move anywhere in the world
  • Ans. 

    Yes, I am open to relocating anywhere in the world for career growth and new experiences.

    • I am flexible and adaptable to new environments

    • I have previous experience of relocating for work

    • I am excited about the opportunity to explore different cultures and work settings

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest and don't be nervous

DPT.Manager Interview Questions asked at other Companies

Q1. Which SS material you have used in piping construction
View answer (1)

Jobs at Afcons Infrastructure

View all

Interview Questions & Answers

user image Anonymous

posted on 21 Nov 2022

I applied via Job Portal

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir Mai leboure contetor.india Bihar
Mai.maldivs me 200 leboure ko bhejna chahta hu mera context.no.XXXXX
Email.id./ *****
Passport.and .vija.tkt.intrwio.ke.liye.hame.bataye procec
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - They provide you not more hike to previous Employer.

Mechanical Execution Engineer Interview Questions asked at other Companies

Q1. 5S system , type of welding defects
View answer (1)

Store Keeper Interview Questions & Answers

user image Anonymous

posted on 16 Apr 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Store Keeper Interview Questions asked at other Companies

Q1. What is the process of material receiving??
View answer (4)

Interview Questions & Answers

user image Anonymous

posted on 30 Jun 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good Company but never join on third party in this company. BAD EXPERIENCE.
Contribute & help others!
anonymous
You can choose to be anonymous

Afcons Infrastructure Interview FAQs

How many rounds are there in Afcons Infrastructure interview?
Afcons Infrastructure interview process usually has 2-3 rounds. The most common rounds in the Afcons Infrastructure interview process are Technical, Resume Shortlist and HR.
How to prepare for Afcons Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Afcons Infrastructure. The most common topics and skills that interviewers at Afcons Infrastructure expect are Industrial Safety, Construction Safety, Bridges, Safety Management and Accounting.
What are the top questions asked in Afcons Infrastructure interview?

Some of the top questions asked at the Afcons Infrastructure interview -

  1. In which code you are proficient, ASME, IS, BSEN, ISO stande...read more
  2. 1) DESCRIBE ABOUT THE WORKING OF TRANSMISSION OF WHEEL LOADER. 2) SHARE THE WOR...read more
  3. How many methods are used to forecast populat...read more
How long is the Afcons Infrastructure interview process?

The duration of Afcons Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

INTERVIEWS

TCE

No Interviews

INTERVIEWS

Mitsubishi UFJ Financial

No Interviews

INTERVIEWS

Industrial Bank of Korea

No Interviews

INTERVIEWS

SAUDI INVESTMENT BANK

No Interviews

INTERVIEWS

Ally Financial Services

No Interviews

INTERVIEWS

Indian Railway Finance

No Interviews

INTERVIEWS

National Bank of Kuwait

No Interviews

INTERVIEWS

AGNC Investment Corp

No Interviews

INTERVIEWS

First Horizon Bank

No Interviews

INTERVIEWS

Saudi British Bank

No Interviews

Tell us how to improve this page.

Afcons Infrastructure Interview Process

based on 208 interviews

Interview experience

4.4
  
Good
View more

HCLTech

Workplace transformation starts with you

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 425 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Essar Group Interview Questions
3.7
 • 28 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Afcons Infrastructure Reviews and Ratings

based on 2.5k reviews

4.3/5

Rating in categories

4.1

Skill development

3.8

Work-life balance

4.0

Salary

4.2

Job security

4.1

Company culture

3.7

Promotions

4.0

Work satisfaction

Explore 2.5k Reviews and Ratings
GST Coordinator

Kochi

12-22 Yrs

Not Disclosed

Investor relations manager

Mumbai

10-20 Yrs

Not Disclosed

Project Finance Manager

Mumbai

10-16 Yrs

₹ 20-35 LPA

Explore more jobs
Senior Engineer
389 salaries
unlock blur

₹5 L/yr - ₹19 L/yr

Planning Engineer
195 salaries
unlock blur

₹4.3 L/yr - ₹12 L/yr

Civil Engineer
183 salaries
unlock blur

₹2 L/yr - ₹11 L/yr

Executive Engineer
172 salaries
unlock blur

₹3.2 L/yr - ₹12 L/yr

Engineer
153 salaries
unlock blur

₹2.2 L/yr - ₹10.8 L/yr

Explore more salaries
Compare Afcons Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview