i
Afcons Infrastructure
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
Site coordinate problems can arise due to incorrect measurements, outdated maps, or human error.
Ensure all measurements are accurate and up-to-date
Use GPS technology for precise location data
Double check all calculations and coordinates before proceeding
Consult with other surveyors or experts if unsure
Example: If a building is constructed in the wrong location due to incorrect coordinates, it can lead to legal disputes
I applied via LinkedIn and was interviewed in Dec 2023. There was 1 interview round.
Survey working style and features are important for accurate data collection and analysis.
Survey working style determines the methods and techniques used for data collection.
Features of a survey, such as question types and response options, impact the quality and reliability of the data.
Survey working style and features ensure accurate and consistent data collection across different respondents and contexts.
They help i...
Safety is important in construction areas to prevent accidents, injuries, and fatalities.
Safety measures ensure the well-being of workers and visitors on construction sites.
Accidents can result in serious injuries or even death, leading to legal and financial consequences for the construction company.
Safety protocols help minimize the risk of falls, electrocutions, equipment malfunctions, and other hazards.
Proper safet...
I applied via Walk-in and was interviewed in Apr 2021. There were 3 interview rounds.
Active and passive conditions refer to the pressure exerted on a retaining wall by soil.
Active pressure is the lateral force exerted by the soil on the wall when the soil is in a state of movement or instability.
Passive pressure is the lateral force exerted by the soil on the wall when the soil is in a state of rest or stability.
Active pressure pushes the wall away from the soil, while passive pressure holds the wall i...
Slop and deflections are important factors to consider in SSB.
Slop refers to the deviation of the actual height of a point from its theoretical height.
Deflection is the angle between the tangent to the curve at a point and the chord connecting the endpoints of the curve.
Both slop and deflection affect the accuracy of SSB measurements.
Proper equipment and techniques must be used to minimize errors in slop and deflection
Afcons Infrastructure interview questions for designations
Top trending discussions
posted on 30 Aug 2021
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
posted on 4 May 2019
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
based on 5 interviews
Interview experience
based on 10 reviews
Rating in categories
Senior Engineer
472
salaries
| ₹5 L/yr - ₹19 L/yr |
Planning Engineer
194
salaries
| ₹4.3 L/yr - ₹12 L/yr |
Civil Engineer
190
salaries
| ₹3.2 L/yr - ₹10 L/yr |
Executive Engineer
172
salaries
| ₹3.2 L/yr - ₹12 L/yr |
Engineer
155
salaries
| ₹3.5 L/yr - ₹10.9 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company