Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Afcons Infrastructure Team. If you also belong to the team, you can get access from here

Afcons Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Clear (1)

Afcons Infrastructure Surveyor Interview Questions, Process, and Tips

Updated 1 Jun 2024

Top Afcons Infrastructure Surveyor Interview Questions and Answers

Afcons Infrastructure Surveyor Interview Experiences

4 interviews found

Surveyor Interview Questions & Answers

user image Anonymous

posted on 31 May 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Very arjent work going every time
  • Q2. Site co-ordinate problem
  • Ans. 

    Site coordinate problems can arise due to incorrect measurements, outdated maps, or human error.

    • Ensure all measurements are accurate and up-to-date

    • Use GPS technology for precise location data

    • Double check all calculations and coordinates before proceeding

    • Consult with other surveyors or experts if unsure

    • Example: If a building is constructed in the wrong location due to incorrect coordinates, it can lead to legal disputes

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Every time

Surveyor Interview Questions & Answers

user image Anonymous

posted on 27 Jan 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What you had learnt from previous Companies.
  • Q2. How will you Innovation working strategy?
  • Q3. How will be Understand the Construction equipments?
  • Q4. Why is important of Survey Working style and their features?
  • Ans. 

    Survey working style and features are important for accurate data collection and analysis.

    • Survey working style determines the methods and techniques used for data collection.

    • Features of a survey, such as question types and response options, impact the quality and reliability of the data.

    • Survey working style and features ensure accurate and consistent data collection across different respondents and contexts.

    • They help i...

  • Answered by AI
  • Q5. Why Safety is important for construction areas ?
  • Ans. 

    Safety is important in construction areas to prevent accidents, injuries, and fatalities.

    • Safety measures ensure the well-being of workers and visitors on construction sites.

    • Accidents can result in serious injuries or even death, leading to legal and financial consequences for the construction company.

    • Safety protocols help minimize the risk of falls, electrocutions, equipment malfunctions, and other hazards.

    • Proper safet...

  • Answered by AI

Surveyor Interview Questions Asked at Other Companies

Q1. How much bench marks important your total station for centre line ... read more
Q2. The basic principles of surveying are.1-location of point a groun ... read more
Q3. Have you so many skill, you will utilise that at site?
Q4. what is base point to start the layout work for your survey instr ... read more
Q5. Diopter is the power of a lens having a focal length of ?
Round 1 - Technical 

(1 Question)

  • Q1. Traversing method ..total station Operator

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge selary times to times Ho staff very good opportunitie

Surveyor Interview Questions & Answers

user image Anonymous

posted on 24 Oct 2021

I applied via Walk-in and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. 1.Atbergs limit.
  • Q2. 2.Continuity therom
  • Q3. 3. Active & Passive condition for retaining wall.
  • Ans. 

    Active and passive conditions refer to the pressure exerted on a retaining wall by soil.

    • Active pressure is the lateral force exerted by the soil on the wall when the soil is in a state of movement or instability.

    • Passive pressure is the lateral force exerted by the soil on the wall when the soil is in a state of rest or stability.

    • Active pressure pushes the wall away from the soil, while passive pressure holds the wall i...

  • Answered by AI
  • Q4. 4.Bearing capacity
  • Q5. 5.slop & Deflections for SSB.
  • Ans. 

    Slop and deflections are important factors to consider in SSB.

    • Slop refers to the deviation of the actual height of a point from its theoretical height.

    • Deflection is the angle between the tangent to the curve at a point and the chord connecting the endpoints of the curve.

    • Both slop and deflection affect the accuracy of SSB measurements.

    • Proper equipment and techniques must be used to minimize errors in slop and deflection

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically strong but focus on your practically.

Afcons Infrastructure interview questions for designations

 Senior Surveyor

 (1)

 Quantity Surveyor

 (1)

 Senior Engineer Quantity Surveyor

 (1)

 Civil Foreman

 (4)

 Civil Supervisor

 (2)

 Site Supervisor

 (1)

 Civil Site Supervisor

 (1)

 Senior Safety Supervisor

 (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. Total station error distribution in GPS to GPS
  • Ans. 

    Total station errors can affect GPS to GPS measurements due to various factors.

    • Total station errors can include instrument calibration errors, atmospheric conditions, and human error.

    • Examples of total station errors affecting GPS to GPS measurements include incorrect leveling of the total station, improper target placement, and misalignment of the instrument.

    • Regular calibration and maintenance of the total station can

  • Answered by AI
  • Q2. Coordinates kaise nikalte hai CAD se
  • Q3. Auto level arre distribution
Round 3 - HR 

(2 Questions)

  • Q1. Selery discussion
  • Q2. Which company working

Interview Preparation Tips

Interview preparation tips for other job seekers - Best company working
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question about your current work and technical question of what they want in me
Round 2 - Technical 

(1 Question)

  • Q1. Case study like what action you take in this particular problem
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and document sharing

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering
Contribute & help others!
anonymous
You can choose to be anonymous

Afcons Infrastructure Interview FAQs

How many rounds are there in Afcons Infrastructure Surveyor interview?
Afcons Infrastructure interview process usually has 1 rounds. The most common rounds in the Afcons Infrastructure interview process are One-on-one Round and Technical.
What are the top questions asked in Afcons Infrastructure Surveyor interview?

Some of the top questions asked at the Afcons Infrastructure Surveyor interview -

  1. Why is important of Survey Working style and their featur...read more
  2. 3. Active & Passive condition for retaining wa...read more
  3. Why Safety is important for construction area...read more

Recently Viewed

JOBS

Browse jobs

Discover jobs you love

COMPANY BENEFITS

KNR Constructions

20 benefits

COMPANY BENEFITS

IRB Infrastructure

60 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

INTERVIEWS

Afcons Infrastructure

No Interviews

DESIGNATION

JOBS

PwC

No Jobs

JOBS

PwC

No Jobs

JOBS

Sarvodaya Hospital

No Jobs

Tell us how to improve this page.

Afcons Infrastructure Surveyor Interview Process

based on 5 interviews

Interview experience

4.6
  
Excellent
View more
Afcons Infrastructure Surveyor Salary
based on 33 salaries
₹2.5 L/yr - ₹7.5 L/yr
At par with the average Surveyor Salary in India
View more details

Afcons Infrastructure Surveyor Reviews and Ratings

based on 10 reviews

4.5/5

Rating in categories

4.3

Skill development

4.0

Work-life balance

4.0

Salary

3.7

Job security

4.1

Company culture

3.4

Promotions

3.9

Work satisfaction

Explore 10 Reviews and Ratings
Senior Engineer
486 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Planning Engineer
196 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
187 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive Engineer
172 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
153 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Afcons Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview