How to response in emergency case
how much experience
I applied via Naukri.com
Subjective mcQ questions are asked.
I was interviewed before Jan 2024.
Steps involved in preparing a project budget
Identify all project expenses including labor, materials, equipment, etc.
Estimate the cost of each expense item based on historical data or quotes from vendors
Allocate funds for unexpected costs or contingencies
Determine the timeline for the project and spread out costs accordingly
Review and finalize the budget with key stakeholders
Factors considered in project costing include materials, labor, overhead, equipment, and indirect costs.
Materials: Cost of raw materials needed for the project.
Labor: Cost of labor required to complete the project.
Overhead: Indirect costs such as utilities, rent, and administrative expenses.
Equipment: Cost of equipment needed for the project.
Indirect costs: Miscellaneous costs like permits, insurance, and taxes.
Example...
I monitor the budget by regularly reviewing expenses, comparing them to projections, and making adjustments as needed.
Regularly review expenses to ensure they are in line with the budget
Compare actual expenses to budget projections to identify any discrepancies
Make adjustments to the budget as needed based on the review and analysis
Track spending patterns and identify areas where cost savings can be made
Indirect costs are expenses that are not directly tied to a specific project or department, but still contribute to overall operational costs.
Indirect costs are overhead expenses that cannot be easily traced to a specific cost object.
Examples include rent, utilities, administrative salaries, and office supplies.
These costs are necessary for the business to function, but are not directly attributable to a specific produ...
Cash flow can be effectively monitored by tracking income and expenses, creating cash flow statements, setting up cash flow projections, and using accounting software.
Track income and expenses regularly to understand the flow of cash in and out of the business.
Create cash flow statements to analyze the sources and uses of cash over a specific period.
Set up cash flow projections to forecast future cash flow based on exp...
Afcons Infrastructure interview questions for popular designations
I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
Get interview-ready with Top Afcons Infrastructure Interview Questions
I applied via Campus Placement and was interviewed in Mar 2023. There were 3 interview rounds.
Powder factor is the amount of explosive used per unit volume of rock.
It is used to determine the amount of explosive needed for a particular blasting operation.
It is calculated by dividing the weight of explosive used by the volume of rock being blasted.
A higher powder factor means more explosive is needed to break the rock.
Powder factor is influenced by factors such as rock type, density, and desired fragmentation.
It...
Large documents in MS Office can be handled by optimizing file size, using appropriate formatting, and dividing into sections.
Optimize file size by compressing images, removing unnecessary content, and using PDF format
Use appropriate formatting such as styles, headings, and table of contents
Divide the document into sections with clear headings and page breaks
Consider using external tools such as OneDrive or SharePoint
Top trending discussions
The duration of Afcons Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 204 interviews
Interview experience
based on 2.5k reviews
Rating in categories
Senior Engineer
490
salaries
| ₹5 L/yr - ₹19 L/yr |
Planning Engineer
197
salaries
| ₹4.5 L/yr - ₹12 L/yr |
Civil Engineer
187
salaries
| ₹2 L/yr - ₹10.8 L/yr |
Executive Engineer
172
salaries
| ₹3.2 L/yr - ₹12 L/yr |
Engineer
153
salaries
| ₹2.2 L/yr - ₹10.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA