i
Afcons Infrastructure
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Metal-air batteries generate electricity through the reaction of metal with oxygen from the air.
Metal-air batteries use a metal anode, typically zinc, and oxygen from the air as the cathode.
During discharge, the metal anode oxidizes, releasing electrons that flow through an external circuit to power a device.
The oxygen from the air reacts with the metal ions at the cathode, forming metal oxides and releasing additional...
Strategies for decarbonization involve transitioning to renewable energy sources, improving energy efficiency, and implementing carbon capture technologies.
Transitioning to renewable energy sources such as solar, wind, and hydro power
Improving energy efficiency in industrial processes and buildings
Implementing carbon capture and storage technologies to reduce emissions
Promoting sustainable transportation options like e...
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
Site coordinate problems can arise due to incorrect measurements, outdated maps, or human error.
Ensure all measurements are accurate and up-to-date
Use GPS technology for precise location data
Double check all calculations and coordinates before proceeding
Consult with other surveyors or experts if unsure
Example: If a building is constructed in the wrong location due to incorrect coordinates, it can lead to legal disputes
I was interviewed before Feb 2024.
Afcons Infrastructure interview questions for popular designations
I applied via LinkedIn and was interviewed in Aug 2024. There were 2 interview rounds.
Get interview-ready with Top Afcons Infrastructure Interview Questions
I applied via LinkedIn and was interviewed in Dec 2023. There was 1 interview round.
Survey working style and features are important for accurate data collection and analysis.
Survey working style determines the methods and techniques used for data collection.
Features of a survey, such as question types and response options, impact the quality and reliability of the data.
Survey working style and features ensure accurate and consistent data collection across different respondents and contexts.
They help i...
Safety is important in construction areas to prevent accidents, injuries, and fatalities.
Safety measures ensure the well-being of workers and visitors on construction sites.
Accidents can result in serious injuries or even death, leading to legal and financial consequences for the construction company.
Safety protocols help minimize the risk of falls, electrocutions, equipment malfunctions, and other hazards.
Proper safet...
I applied via Campus Placement
A batching plant is a facility where ingredients for concrete are mixed and blended together to produce concrete of desired quality.
Batching plants are used in construction projects to produce concrete in large quantities
Ingredients such as cement, water, aggregates, and admixtures are mixed in specific proportions
The plant ensures consistent quality and strength of the concrete produced
Different types of batching plan...
I applied via Approached by Company and was interviewed in Dec 2023. There were 3 interview rounds.
Top trending discussions
The duration of Afcons Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 206 interviews
Interview experience
based on 2.5k reviews
Rating in categories
Senior Engineer
486
salaries
| ₹0 L/yr - ₹0 L/yr |
Planning Engineer
196
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
187
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Engineer
172
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
153
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA