I applied via Campus Placement and was interviewed before Aug 2022. There were 3 interview rounds.
Time was 5-10 mins with a general topic such as Pros and Cons of XYZ.
I applied via Referral and was interviewed before Jun 2021. There were 3 interview rounds.
I applied via Naukri.com
The most critical agreement in a contract is the one that outlines the scope of work and deliverables.
Scope of work and deliverables agreement is critical as it defines the expectations of both parties
It outlines the specific tasks to be completed, timelines, and quality standards
Without a clear scope of work, there can be misunderstandings and disputes
Examples include construction contracts, software development agree
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
Worley interview questions for popular designations
I applied via LinkedIn and was interviewed in Aug 2021. There were 3 interview rounds.
Hedging process involves identifying risks, selecting appropriate instruments, and documenting the strategy.
Identify the risks to be hedged
Select appropriate hedging instruments
Document the hedging strategy and rationale
Monitor and adjust the hedge as necessary
Ensure compliance with regulatory requirements
Examples of hedging instruments include futures, options, and swaps
Get interview-ready with Top Worley Interview Questions
posted on 19 Oct 2021
I applied via Campus Placement and was interviewed in Sep 2021. There were 4 interview rounds.
I applied via Company Website and was interviewed in Mar 2021. There were 4 interview rounds.
The procedure for erecting a Heat Exchanger involves several steps including site preparation, foundation installation, equipment placement, piping connection, and testing.
Prepare the site by leveling the ground and ensuring adequate space for the equipment
Install the foundation to support the weight of the Heat Exchanger
Place the Heat Exchanger on the foundation and secure it in place
Connect the piping to the Heat Exc...
Precautions before starting confined space work
Identify the confined space and assess the hazards
Ensure proper ventilation and air quality testing
Use appropriate personal protective equipment
Have a rescue plan in place and train all workers involved
Obtain necessary permits and follow all safety regulations
Communicate clearly with all workers involved in the job
Alignment of a column can be checked using various methods.
Visual inspection can be done to check if the column is straight and vertical.
Laser alignment tools can be used to check the alignment of the column.
String lines can be used to check the alignment of the column.
Plumb bobs can be used to check the vertical alignment of the column.
Optical instruments like theodolites can be used to check the alignment of the colu...
Acceptance limit for column alignment is typically 1/500th of the column height.
The acceptance limit for column alignment is usually specified in the project specifications.
It is typically 1/500th of the column height.
This means that for a 20-meter column, the maximum allowable deviation from vertical is 40 mm.
Alignment is critical for the proper functioning of the column and to prevent damage to the structure.
Alignmen...
A line chart for a 10 km action plan with safety precautions, procurement, manpower, and equipment.
Identify safety precautions needed for the project
Procure necessary equipment and manpower
Create a timeline for the project
Allocate resources efficiently
Ensure compliance with regulations and standards
Monitor progress and adjust plan as needed
To calculate pup-piece length for a 12 inch pipeline with two sections already lowered and overlap 5m and s-bend rolling, two 90 degree LR bends.
Calculate the total length of the pipeline
Subtract the length of the two sections already lowered and overlap 5m
Add the length of the two 90 degree LR bends
Divide the result by 2 to get the length of each pup-piece
Collapse and damage percentage for HDD crossings are calculated based on various factors such as soil type, borehole diameter, and drilling fluid properties.
Collapse percentage is calculated using the Mohr-Coulomb failure criterion
Damage percentage is calculated based on the tensile strength of the pipe and the bending stress induced during the pullback process
Factors such as soil type, borehole diameter, and drilling ...
Methodology for rock excavation involves drilling, blasting, and removal of debris. Quantity is measured by volume or weight.
Drilling holes in rock using specialized equipment
Placing explosives in the holes and detonating them
Removing the debris using heavy machinery
Measuring the quantity of rock excavated by volume or weight
Using software to calculate the amount of explosives needed for a specific excavation project
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed before May 2022. There were 3 interview rounds.
Some of the top questions asked at the Worley interview -
The duration of Worley interview process can vary, but typically it takes about less than 2 weeks to complete.
Interview experience
based on 980 reviews
Rating in categories
Process Engineer
315
salaries
| â‚ą4.5 L/yr - â‚ą17.4 L/yr |
Deputy Manager
195
salaries
| â‚ą12 L/yr - â‚ą32.1 L/yr |
Piping Designer
172
salaries
| â‚ą4.5 L/yr - â‚ą15 L/yr |
Piping Design Engineer
152
salaries
| â‚ą6.3 L/yr - â‚ą23.4 L/yr |
Design Engineer
145
salaries
| â‚ą3.6 L/yr - â‚ą14 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
McDermott International