Procure to pay cycle is the process of obtaining goods or services from a vendor, including requisition, purchase order, receipt, invoice, and payment.
The cycle starts with a requisition for goods or services needed by a department.
A purchase order is then created and sent to the vendor for the requested items.
Upon receiving the items, a receipt is generated to confirm the delivery.
An invoice is then received from the ...
Controls of Ap refer to the various measures put in place to ensure the accuracy, security, and integrity of accounts payable processes.
Segregation of duties to prevent fraud
Regular reconciliation of accounts
Approval processes for invoices and payments
Use of accounting software with built-in controls
Regular audits to check for compliance
I applied via LinkedIn and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via LinkedIn and was interviewed before May 2023. There were 3 interview rounds.
To perform a Process Map for a department based on cloud products, I would start by identifying key processes, mapping out the flow of activities, and documenting inputs/outputs.
Identify key processes within the department that are related to cloud products
Map out the flow of activities for each process, including inputs and outputs
Document the tools and technologies used in each process
Identify any dependencies betwee...
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
Line sizing criteria is based on factors like flow rate, pressure drop, velocity, and material compatibility.
Consider the flow rate of the fluid being transported
Calculate the pressure drop allowed in the system
Determine the velocity of the fluid to prevent erosion or corrosion
Ensure the material of the line is compatible with the fluid being transported
posted on 10 May 2022
P&ID is made by identifying process equipment and connecting them with pipes. Line sizing is done based on process requirements.
Identify process equipment and their connections
Determine process requirements such as flow rate and pressure drop
Select appropriate pipe size based on process requirements
Consider factors such as fluid properties, pipe material, and layout
Use software tools such as AutoCAD or SmartPlant P&ID
based on 15 reviews
Rating in categories
Process Engineer
316
salaries
| ₹4.5 L/yr - ₹16.6 L/yr |
Deputy Manager
200
salaries
| ₹12 L/yr - ₹35 L/yr |
Piping Designer
161
salaries
| ₹4.3 L/yr - ₹15.2 L/yr |
Piping Design Engineer
150
salaries
| ₹6.5 L/yr - ₹23.5 L/yr |
Design Engineer
143
salaries
| ₹3.7 L/yr - ₹16 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
McDermott International