A line chart for a 10 km action plan with safety precautions, procurement, manpower, and equipment.
Identify safety precautions needed for the project
Procure necessary equipment and manpower
Create a timeline for the project
Allocate resources efficiently
Ensure compliance with regulations and standards
Monitor progress and adjust plan as needed
To calculate pup-piece length for a 12 inch pipeline with two sections already lowered and overlap 5m and s-bend rolling, two 90 degree LR bends.
Calculate the total length of the pipeline
Subtract the length of the two sections already lowered and overlap 5m
Add the length of the two 90 degree LR bends
Divide the result by 2 to get the length of each pup-piece
Collapse and damage percentage for HDD crossings are calculated based on various factors such as soil type, borehole diameter, and drilling fluid properties.
Collapse percentage is calculated using the Mohr-Coulomb failure criterion
Damage percentage is calculated based on the tensile strength of the pipe and the bending stress induced during the pullback process
Factors such as soil type, borehole diameter, and drilling ...
Methodology for rock excavation involves drilling, blasting, and removal of debris. Quantity is measured by volume or weight.
Drilling holes in rock using specialized equipment
Placing explosives in the holes and detonating them
Removing the debris using heavy machinery
Measuring the quantity of rock excavated by volume or weight
Using software to calculate the amount of explosives needed for a specific excavation project
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.
I am a Piping Engineer with strong technical skills and attention to detail. My strengths include problem-solving, teamwork, and communication.
I have a Bachelor's degree in Mechanical Engineering with a specialization in Piping Design.
I have experience working on various projects, including designing and analyzing piping systems for industrial plants.
I am proficient in using software such as AutoCAD and CAESAR II for p...
I applied via LinkedIn and was interviewed in Apr 2023. There were 2 interview rounds.
Various pressure tests are conducted on valves including hydrostatic test, pneumatic test, and cryogenic test.
Hydrostatic test is conducted by filling the valve with water and pressurizing it to a specified pressure to check for leaks.
Pneumatic test involves using air or nitrogen to pressurize the valve and check for leaks or defects.
Cryogenic test is performed at low temperatures to ensure the valve can withstand extr...
Safety considerations in designing piping systems are crucial for preventing accidents and ensuring the integrity of the system.
Ensuring proper material selection to withstand the intended pressure and temperature conditions
Implementing proper support and restraint systems to prevent excessive stress and vibration
Incorporating adequate access points for maintenance and inspection
Following relevant codes and standards s...
posted on 9 Dec 2021
I applied via Company Website and was interviewed in Jun 2021. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed before Jul 2020. There was 1 interview round.
posted on 11 Aug 2023
About pipe laying work staircase
posted on 31 Oct 2024
I was interviewed in May 2024.
A piping engineer is a professional responsible for designing, planning, and overseeing the installation of piping systems in various industries.
Designing piping systems to transport fluids or gases
Selecting appropriate materials for piping construction
Ensuring compliance with industry standards and regulations
Collaborating with other engineers and stakeholders on project requirements
Performing stress analysis and calc
Hydro testing is a process of testing the strength and integrity of pipelines or vessels by filling them with water under pressure.
Hydro testing is a common method used to ensure that pipelines or vessels can safely withstand the pressure they will be subjected to during normal operation.
During hydro testing, the pipeline or vessel is filled with water and pressurized to a level higher than the operating pressure to ch...
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
Some of the top questions asked at the Worley Pipeline Engineer interview -
based on 1 review
Rating in categories
Process Engineer
325
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
203
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Designer
159
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Design Engineer
153
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
150
salaries
| ₹0 L/yr - ₹0 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
McDermott International