Filter interviews by
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
An HVAC system is a heating, ventilation, and air conditioning system that controls the temperature, humidity, and air quality in a building.
Consists of a furnace or boiler for heating
Includes a central air conditioner for cooling
Utilizes ductwork to distribute air throughout the building
May have a thermostat to control temperature settings
Can include air filters for improving indoor air quality
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Oct 2018. There were 5 interview rounds.
I am a dedicated and experienced engineer with a strong background in project management and problem-solving.
Experienced in project management and problem-solving
Strong background in engineering
Dedicated and detail-oriented
Excellent communication skills
Team player
My future goal is to become a senior engineer and eventually move into a leadership role within the company.
Continue to develop my technical skills and knowledge in my field
Seek opportunities for mentorship and leadership training
Set specific goals for career advancement, such as obtaining certifications or completing advanced education
Work on improving communication and teamwork skills to prepare for leadership roles
I want to join TechnipFMC because of their reputation for innovation and commitment to excellence in engineering.
TechnipFMC is known for their cutting-edge technology and innovative solutions in the engineering industry
I am impressed by TechnipFMC's track record of successful projects and global presence
I believe that working at TechnipFMC will provide me with opportunities for professional growth and development
I am responsible for designing and implementing new features for our software products.
Designing and implementing new features for software products
Collaborating with team members to ensure successful project completion
Testing and debugging code to ensure quality and functionality
Participating in code reviews and providing feedback to peers
Yes, MRB (Manufacturing Record Book) is a document that contains detailed information about the manufacturing process.
MRB is a comprehensive record of all activities related to manufacturing, including design, production, testing, and quality control.
It serves as a reference for future production runs and helps ensure consistency and quality.
MRB typically includes information such as engineering drawings, specification...
Yes, QAP/ITP stands for Quality Assurance Plan/Inspection and Test Plan.
QAP/ITP is a document that outlines the quality assurance and inspection procedures for a project or product.
It includes details about the tests to be conducted, acceptance criteria, and responsibilities of different stakeholders.
QAP/ITP ensures that the project or product meets the required quality standards and specifications.
For example, in cons...
Radiography testing (RT) and ultrasonic testing (UT) are both non-destructive testing methods used to detect flaws in materials.
Radiography testing uses X-rays or gamma rays to create an image of the internal structure of an object, while ultrasonic testing uses high-frequency sound waves.
RT is typically used for thicker materials and can detect both surface and subsurface defects, while UT is more commonly used for th...
No, RT cannot replace UT examination.
RT (Radiographic Testing) and UT (Ultrasonic Testing) are two different non-destructive testing methods used in engineering.
RT uses X-rays or gamma rays to inspect the internal structure of an object, while UT uses sound waves to detect flaws or measure thickness.
Each method has its own advantages and limitations, and they are often used in combination to ensure comprehensive inspec...
WPS stands for Welding Procedure Specification and PQR stands for Procedure Qualification Record.
WPS is a document that provides detailed instructions on how to perform a specific welding procedure.
It includes information on welding parameters, materials, pre-weld and post-weld treatments, etc.
PQR is a record that documents the actual results of a welding procedure qualification test.
It includes details of the test, su...
Essential variables are crucial for the functioning of a system, while non-essential variables are not necessary but may provide additional information.
Essential variables are required for the system to operate correctly.
Non-essential variables are not necessary for the system's basic functionality.
Essential variables are typically directly related to the core purpose of the system.
Non-essential variables may provide s...
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
I appeared for an interview before Mar 2024.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 11 May 2018
I appeared for an interview before Mar 2020.
posted on 23 Oct 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 10 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Piping code and welder qualifications test
Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.
Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.
Both piping code and welder qualifications test are important in ensu...
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Process Engineer
324
salaries
| ₹4.5 L/yr - ₹16 L/yr |
Deputy Manager
206
salaries
| ₹9.5 L/yr - ₹32.1 L/yr |
Piping Designer
166
salaries
| ₹4.5 L/yr - ₹15.1 L/yr |
Piping Design Engineer
154
salaries
| ₹6.4 L/yr - ₹23.3 L/yr |
Design Engineer
150
salaries
| ₹3.8 L/yr - ₹15.8 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
McDermott International