I applied via Company Website and was interviewed in Oct 2023. There was 1 interview round.
Top trending discussions
posted on 15 Feb 2022
I appeared for an interview before Feb 2021.
The ratio of M25 grade concrete is 1:1:2.
The ratio of M25 grade concrete is 1 part cement, 1 part sand, and 2 parts aggregate.
This ratio is commonly used in construction for various applications.
For example, if you need to make 1 cubic meter of M25 grade concrete, you would need 1/4 cubic meter of cement, 1/4 cubic meter of sand, and 1/2 cubic meter of aggregate.
posted on 1 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.
M30 concrete is a type of high-strength concrete with a compressive strength of 30 MPa.
M30 concrete is commonly used in construction projects that require high strength and durability.
It is made by mixing cement, sand, and coarse aggregates in a specific ratio.
The ratio of cement, sand, and aggregates in M30 concrete is 1:1:2.
M30 concrete is suitable for building structures like bridges, dams, and high-rise buildings.
I...
The rebar grade should be selected based on the design requirements and the structural load capacity.
The rebar grade is determined by the design engineer based on the structural requirements.
The grade of rebar is usually specified in the structural drawings and specifications.
The most commonly used rebar grades are 40, 60, and 75.
The higher the grade of rebar, the stronger it is and the more load it can bear.
The rebar ...
I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.
Metro project Ugrider casting
I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
Cost to complete refers to the estimated amount of money required to finish a project or task.
Cost to complete is an important metric used in project management and quantity surveying.
It takes into account the remaining work, resources, and expenses needed to complete a project.
It helps in assessing the financial status of a project and making informed decisions.
Cost to complete can be calculated by subtracting the act...
Unit weight of steel bars varies based on their diameter and length.
The weight of steel bars is measured in kilograms per meter (kg/m).
The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.
For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.
posted on 10 Nov 2019
I applied via Walk-in and was interviewed in May 2019. There was 1 interview round.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.
Identify the item or activity to be analyzed
Determine the quantity of materials and labor required
Calculate the cost of materials and labor
Add overhead costs and profit margin
Divide the total cost by the quantity to get the unit rate
Compare the rate with market rates to ensure competitiveness
Components to be considered in Rate analysis
Cost of materials
Cost of labor
Cost of equipment
Overhead expenses
Profit margin
Taxes and duties
Transportation costs
Wastage and spoilage
Contingencies
Productivity rates
Market rates
Inflation rates
The documents required to certify the final bill as a Quantity Surveyor.
Contract documents
Measurement records
Variation orders
Payment certificates
Final account statement
As-built drawings
Completion certificates
Test reports
Subcontractor invoices
Material invoices
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Assistant Engineer
197
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Senior Engineer
131
salaries
| ₹3 L/yr - ₹9 L/yr |
Assistant Engineer - Civil
61
salaries
| ₹2.4 L/yr - ₹5.7 L/yr |
Assistant Manager
48
salaries
| ₹4.6 L/yr - ₹9.9 L/yr |
Planning Engineer
40
salaries
| ₹1.1 L/yr - ₹7 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem