Upload Button Icon Add office photos

URC Construction

Compare button icon Compare button icon Compare

Filter interviews by

URC Construction Assistant Engineer - Civil Interview Questions, Process, and Tips for Freshers

Updated 18 Sep 2024

URC Construction Assistant Engineer - Civil Interview Experiences for Freshers

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What's BBS full form? And how to find weight of bar.
  • Ans. 

    BBS stands for Bar Bending Schedule. Weight of a bar can be calculated using the formula: Weight = (D^2/162) * L, where D is diameter of bar in mm and L is length of bar in meters.

    • BBS stands for Bar Bending Schedule

    • Weight of a bar can be calculated using the formula: Weight = (D^2/162) * L

    • D is diameter of bar in mm

    • L is length of bar in meters

  • Answered by AI
  • Q2. What's self compacting concrete?
  • Ans. 

    Self compacting concrete is a type of concrete that does not require vibration or compaction during placement.

    • Contains high flowability and segregation resistance

    • Achieves full compaction purely through its own weight and without the need for mechanical vibration

    • Ideal for complex structures with congested reinforcement or in areas with limited access

    • Reduces labor costs and construction time

    • Examples include SCC mixtures ...

  • Answered by AI
  • Q3. What's different between nominal mix and design mix?
  • Ans. 

    Nominal mix is a pre-defined mix ratio while design mix is a mix ratio calculated based on specific requirements.

    • Nominal mix uses pre-determined ratios like 1:2:4 for concrete, while design mix is calculated based on specific requirements like strength and durability.

    • Design mix involves testing of materials to determine the optimal mix ratio, while nominal mix does not require such testing.

    • Design mix is more precise an...

  • Answered by AI
  • Q4. What's w/c ratio? Explain me.
  • Ans. 

    w/c ratio stands for water-cement ratio, it is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • w/c ratio is a crucial factor in determining the strength and durability of concrete.

    • A lower w/c ratio indicates a stronger and more durable concrete mix.

    • The w/c ratio should be carefully controlled to achieve the desired concrete properties.

    • For example, a w/c ratio of 0.5 means that for every

  • Answered by AI

Interview questions from similar companies

I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What is hydration process during casting of concrete?
  • Ans. 

    Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.

    • Hydration process starts as soon as water is added to cement.

    • The reaction produces heat and causes the mixture to harden and gain strength.

    • The process continues for weeks and even months, resulting in a stronger and more durable concrete.

    • The amount of water used in the mixture affects the hydration process and...

  • Answered by AI
  • Q2. Concrete strength depend ?
  • Ans. 

    Concrete strength depends on various factors.

    • Water-cement ratio

    • Type and quality of cement

    • Aggregate size and shape

    • Curing conditions

    • Mix design

    • Age of concrete

    • Temperature and humidity

    • Presence of admixtures

  • Answered by AI
  • Q3. Why used send in concrete mixer
  • Ans. 

    Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.

    • Water is added to hydrate the cement and activate the chemical reaction that causes it to harden

    • The amount of water added affects the strength and durability of the concrete

    • Too much water can weaken the concrete and cause cracking

    • The water should be added gradually and mixed thoroughly to ensure even distribution

    • Ot...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for AECOM Assistant Engineer - Civil interview:
  • Environmental effect on concrete
Interview preparation tips for other job seekers - Please increase knowledge inhance of fresher and experienced
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Finishing work details
  • Q2. Tiles work, plaster work,MEP WORK
  • Q3. Falscilingwork,paint work
  • Q4. Layout works,coloumn,slab,beam, footing
  • Q5. RCC work, structural drawing knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical skill, finishing work details
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell us about your self
Round 3 - One-on-one 

(2 Questions)

  • Q1. Technical questions rolling margin
  • Q2. Unit weight of steel
  • Ans. 

    Unit weight of steel is typically around 7850 kg/m^3.

    • Unit weight of steel is commonly used in civil engineering for calculating the weight of steel structures.

    • The unit weight of steel is typically around 7850 kg/m^3.

    • This value may vary slightly depending on the specific type of steel being used.

  • Answered by AI

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1. Safety valve types and selection criteria 2. Thermowell Design concept 3. Diff. Pressure Type Flow meter concept and criteria 4. Cable construction details 5. Hook-Ups details
  • Q2. 1. Installation details 2. Flowmeter straigth lengths requirement

Interview Preparation Tips

Interview preparation tips for other job seekers - On which things you worked on , all basics and details things shall be clear.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process of Making Minor Bridge?
  • Ans. 

    The process of making a minor bridge involves planning, design, construction, and inspection.

    • 1. Planning phase involves determining the location, size, and type of bridge needed.

    • 2. Design phase includes creating detailed drawings and calculations for the bridge structure.

    • 3. Construction phase involves building the foundation, supports, and deck of the bridge.

    • 4. Inspection phase ensures the bridge meets safety and quali...

  • Answered by AI
  • Q2. How do you assure piling Point ?
  • Ans. 

    Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.

    • Conduct soil investigation to determine soil conditions and suitability for piling.

    • Select appropriate piling equipment based on soil conditions and project requirements.

    • Monitor the piling process to ensure proper installation and alignment of piles.

    • Perform load tests on completed

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why do you change your last Company?
  • Q2. What your salary Expectations ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident towards your Knowledge

URC Construction Interview FAQs

How many rounds are there in URC Construction Assistant Engineer - Civil interview for freshers?
URC Construction interview process for freshers usually has 1 rounds. The most common rounds in the URC Construction interview process for freshers are Technical.
What are the top questions asked in URC Construction Assistant Engineer - Civil interview for freshers?

Some of the top questions asked at the URC Construction Assistant Engineer - Civil interview for freshers -

  1. What's BBS full form? And how to find weight of b...read more
  2. What's different between nominal mix and design m...read more
  3. What's self compacting concre...read more

Tell us how to improve this page.

URC Construction Assistant Engineer - Civil Interview Process for Freshers

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 60 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
URC Construction Assistant Engineer - Civil Salary
based on 61 salaries
₹2.4 L/yr - ₹5.7 L/yr
14% less than the average Assistant Engineer - Civil Salary in India
View more details

URC Construction Assistant Engineer - Civil Reviews and Ratings

based on 15 reviews

3.6/5

Rating in categories

3.6

Skill development

2.2

Work-life balance

2.9

Salary

3.8

Job security

3.0

Company culture

2.6

Promotions

3.2

Work satisfaction

Explore 15 Reviews and Ratings
Assistant Engineer
196 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Senior Engineer
131 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Assistant Engineer - Civil
61 salaries
unlock blur

₹2.4 L/yr - ₹5.7 L/yr

Assistant Manager
48 salaries
unlock blur

₹4.6 L/yr - ₹9.9 L/yr

Planning Engineer
40 salaries
unlock blur

₹1.1 L/yr - ₹7 L/yr

Explore more salaries
Compare URC Construction with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview