Filter interviews by
I applied via Company Website and was interviewed before Sep 2023. There was 1 interview round.
BBS stands for Bar Bending Schedule. Weight of a bar can be calculated using the formula: Weight = (D^2/162) * L, where D is diameter of bar in mm and L is length of bar in meters.
BBS stands for Bar Bending Schedule
Weight of a bar can be calculated using the formula: Weight = (D^2/162) * L
D is diameter of bar in mm
L is length of bar in meters
Self compacting concrete is a type of concrete that does not require vibration or compaction during placement.
Contains high flowability and segregation resistance
Achieves full compaction purely through its own weight and without the need for mechanical vibration
Ideal for complex structures with congested reinforcement or in areas with limited access
Reduces labor costs and construction time
Examples include SCC mixtures ...
Nominal mix is a pre-defined mix ratio while design mix is a mix ratio calculated based on specific requirements.
Nominal mix uses pre-determined ratios like 1:2:4 for concrete, while design mix is calculated based on specific requirements like strength and durability.
Design mix involves testing of materials to determine the optimal mix ratio, while nominal mix does not require such testing.
Design mix is more precise an...
w/c ratio stands for water-cement ratio, it is the ratio of the weight of water to the weight of cement used in a concrete mix.
w/c ratio is a crucial factor in determining the strength and durability of concrete.
A lower w/c ratio indicates a stronger and more durable concrete mix.
The w/c ratio should be carefully controlled to achieve the desired concrete properties.
For example, a w/c ratio of 0.5 means that for every
Top trending discussions
I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.
Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.
Hydration process starts as soon as water is added to cement.
The reaction produces heat and causes the mixture to harden and gain strength.
The process continues for weeks and even months, resulting in a stronger and more durable concrete.
The amount of water used in the mixture affects the hydration process and...
Concrete strength depends on various factors.
Water-cement ratio
Type and quality of cement
Aggregate size and shape
Curing conditions
Mix design
Age of concrete
Temperature and humidity
Presence of admixtures
Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.
Water is added to hydrate the cement and activate the chemical reaction that causes it to harden
The amount of water added affects the strength and durability of the concrete
Too much water can weaken the concrete and cause cracking
The water should be added gradually and mixed thoroughly to ensure even distribution
Ot...
posted on 19 Dec 2024
posted on 23 Sep 2023
I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.
Unit weight of steel is typically around 7850 kg/m^3.
Unit weight of steel is commonly used in civil engineering for calculating the weight of steel structures.
The unit weight of steel is typically around 7850 kg/m^3.
This value may vary slightly depending on the specific type of steel being used.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
The process of making a minor bridge involves planning, design, construction, and inspection.
1. Planning phase involves determining the location, size, and type of bridge needed.
2. Design phase includes creating detailed drawings and calculations for the bridge structure.
3. Construction phase involves building the foundation, supports, and deck of the bridge.
4. Inspection phase ensures the bridge meets safety and quali...
Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.
Conduct soil investigation to determine soil conditions and suitability for piling.
Select appropriate piling equipment based on soil conditions and project requirements.
Monitor the piling process to ensure proper installation and alignment of piles.
Perform load tests on completed
based on 1 interview
Interview experience
based on 15 reviews
Rating in categories
Assistant Engineer
196
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Senior Engineer
131
salaries
| ₹3 L/yr - ₹9 L/yr |
Assistant Engineer - Civil
61
salaries
| ₹2.4 L/yr - ₹5.7 L/yr |
Assistant Manager
48
salaries
| ₹4.6 L/yr - ₹9.9 L/yr |
Planning Engineer
40
salaries
| ₹1.1 L/yr - ₹7 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem