Filter interviews by
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
Data entry submission assignment
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
Costing and Contribution
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2022. There were 3 interview rounds.
Very much Americanised. It was psycosometric kind of test.
Tube Investments of India interview questions for popular designations
I applied via Company Website and was interviewed before Apr 2022. There were 2 interview rounds.
To problem solve for M/C's, one must identify the issue, gather data, analyze the problem, develop solutions, and implement them.
Identify the issue by observing and testing the machine
Gather data by collecting information about the problem and the machine
Analyze the problem by breaking it down into smaller parts and determining the root cause
Develop solutions by brainstorming and evaluating options
Implement the chosen ...
Machine parts can be serviced by following a systematic approach that includes inspection, cleaning, repair, and replacement.
Inspect the machine parts to identify any signs of wear and tear or damage
Clean the parts thoroughly using appropriate cleaning agents and tools
Repair any damaged parts using welding, brazing, or other techniques
Replace any parts that are beyond repair or have exceeded their useful life
Follow the...
Get interview-ready with Top Tube Investments of India Interview Questions
posted on 20 Feb 2022
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
Writing test
I applied via Walk-in and was interviewed before Nov 2021. There were 2 interview rounds.
posted on 2 Jul 2021
I applied via Walk-in and was interviewed in Sep 2020. There were 3 interview rounds.
Top trending discussions
Some of the top questions asked at the Tube Investments of India interview -
The duration of Tube Investments of India interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 56 interviews
Interview experience
based on 885 reviews
Rating in categories
Assistant Manager
141
salaries
| ₹3.5 L/yr - ₹11.9 L/yr |
Senior Executive
127
salaries
| ₹4.3 L/yr - ₹9.5 L/yr |
Senior Engineer
81
salaries
| ₹2.5 L/yr - ₹7 L/yr |
Quality Inspector
80
salaries
| ₹1 L/yr - ₹3.5 L/yr |
Quality Engineer
74
salaries
| ₹1.4 L/yr - ₹4.9 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon