Tube Investments of India Project Intern Interview Questions and Answers

Updated 4 Mar 2021

Tube Investments of India Project Intern Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Common question self introduction ?
  • Q2. What is our favorite subject ?
  • Q3. What is your vision ?
  • Q4. What is your strength?

Interview Preparation Tips

Interview preparation tips for other job seekers - empty your emotion , clear your fear whether you get a job or not, make your self comfortable , answer the question bold ,if you don't know any answer please don't say wrong or try to answer please say truth

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Ans. 

    To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.

    • Identify the root causes of the delays and address them promptly.

    • Implement project management tools and techniques to streamline processes and improve productivity.

    • Optimize resource allocation to ensure maximum utilization and minimize idle time.

    • Negotiate with suppliers and vendors for better pricing o...

  • Answered by AI
  • Q3. How much ur carpent area and buildup area
  • Ans. 

    The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is the actual area where you can lay a carpet.

    • Built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is usually around 70-80% of the built-up area.

    • For example, if the built-up area is 1000 square feet, the carpet area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About your work define self.
  • Q2. Pile, Girder and Major bridge related.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Tell me about yourself
  • Q2. What is key things to start a project
  • Q3. WCC and it helps
  • Ans. 

    WCC stands for Work Control Center and it helps in coordinating and managing project tasks efficiently.

    • WCC serves as a central hub for project information and communication

    • It helps in assigning tasks, tracking progress, and resolving issues in a timely manner

    • Example: WCC software like Asana or Trello can be used to streamline project coordination

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical questions related to work
  • Q2. Previous job experiences
Round 1 - Technical 

(14 Questions)

  • Q1. Two types road 1 Flexible pavement 2 Rigid pavement Before new project start Surveying, NGL,Encroachment , OGL
  • Q2. Flexible pavement:- 1:- EMBANKMENT:- Take thicknesses 3m approximately as per site conditions 95% compaction 1:- large size soil particles 75mm lumps and cloud. Liquid limit <50%, plastic limit<25% Swel...
  • Ans. 

    The question is about the specifications of different layers in a flexible pavement.

    • The embankment layer has a thickness of 3m and is compacted at 95% with large size soil particles and effective CBR as per design.

    • The subgrade layer has a total thickness of 500mm and is compacted at 97% with large size soil particles and effective CBR as per design.

    • The GSB layer has a total thickness of 300mm and is a mixture of aggreg...

  • Answered by AI
  • Q3. Emulsion:- Prime coat:- low viscous cut back bitumen on wmm surfaces area and filling pores and void. Tackcoat:- Light application bitumen , asphalt, emulsion and diluted water on wmm surfaces area.
  • Q4. DBM:- it total thickness of 150mm compacted two layer 75mm and 75mm It mix with aggregate 20mm to 28mm and bitumen VG30 GRADE.apply on si
  • Q5. Tackcoat;- light application bitumen, asphalt,emulsion and dilute water on DBM Surfaces area. BC:- It is total thickness of 50mm compacted ,aggregate size 13.1mm and bitumen VG30 grade on DBM. Seal co...
  • Q6. Laying of bitumen concete. :-130 degree celceious to 150 degree celceious. Rolling on bitumen concete :-80 degree celceious 100 degree celceious
  • Q7. Rigid pavements:- 1 :- DLC= 150MM 2:-PQC = 300MM
  • Q8. DLC:-Material sutabilitey 1:- Aggregate size 26.5 mm 2:- water absorption max2% 3:- Soundness test Naso4 - 12% Mgso4-18% 4:- Angle of abr...
  • Q9. DESINGN PROCEDURE :- 1:- Use M15 grade concrete. Aggregate and cement ratio 1:2 2:- The minimum cement content 150kg percum. If flayash is more than 20% the minimum cement contents 120 kg percum. 3:- T...
  • Ans. 

    Design procedure for laying M15 grade concrete with specific requirements for cement content, compressive strength, and compaction.

    • Use M15 grade concrete with aggregate and cement ratio of 1:2

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Ensure compressive strength of 10MPA after 7 days curing, with no sample below 7.5MPA

    • Ensure DLC premix batching plant material is homogeneous and ...

  • Answered by AI
  • Q10. PQC:- Material sutabilitey 1:- Aggregate size 31.5mm Material sutabilitey of pqc from Soundness test to sand equivalent
  • Q11. Design procedure of PQC:- Use M40 grade concrete. 1:- The minimum cement content 360kg percum. If flyash more than 20% the minimum cement contents 310 kg percum. 2:-The flexuar strength of cement ...
  • Ans. 

    Design procedure for PQC using M40 grade concrete

    • Minimum cement content of 360kg per cum

    • Flexural strength of 4.5MPA and compressive strength of 40MPA after 28-day curing

    • Dowel bars and tie bars provided for load transfer and prevention of cracking and deflection

    • PQC mix prepared in pre-mix batching plant and transported to site

    • Separation membrane and texturing and sawing operations performed for proper finishing

    • 28-day cu...

  • Answered by AI
  • Q12. DIFFERENT TYPES OF CARRIAGE WAY 1 :- Single lane- 3.75 m 2:- Multlane;- 3.50m 3:- Inter mediate lane:- 5.5m 4 Two lane :- 7.5 m 5:- Thee lane:- 10.50m 6:- Four lane:- 7.5m+ 7.5m
  • Ans. 

    Different types of carriage way include single lane, multilane, intermediate lane, two lane, three lane, and four lane.

    • Single lane has a width of 3.75m

    • Multilane has a width of 3.50m

    • Intermediate lane has a width of 5.5m

    • Two lane has a width of 7.5m

    • Three lane has a width of 10.50m

    • Four lane has a width of 7.5m + 7.5m

  • Answered by AI
  • Q13. TYPES CAMBER 1 :- STRIGTH CAMBER 2:- PAROBOLIC CABER 3 STRAIGHT AND PARABOLIC CAMBER cc amber 1 in 50 to 1in60 Bitumen CAMBER 1in40 to 1in 50 camber Wmm camber 1in30 to 1in40
  • Q14. CBR;- Developed by the California division State of high way to classify and evaluting 1: soil subgrade 2:-GSB CBR-=3% TO 15% Clay=<8% Sand 15% to 35% Gravel >25% THICKNESSES OF PAVEMENT T= (1.75P/...

Interview Preparation Tips

Interview preparation tips for other job seekers - National high way 2 to 4 lane
Expressway way 6 to 8 lane
Minimum right of way 4 lane 6 lane =60M
EXPRESS WAY HAVE MANY SMART AND
INTEILIGENT FEATURS
HTMS = high traffic management system
VIDS=visual incident deduction system0
Expressway advance features to lays
1;- Excess ramp
2:-Line divder
3:- Grade separation
4;- Elevated section
Expressway is no multiple lane
4 lane cast = 8 to 10 core rupees/ km
6 lane coast = 14 core rs / km
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal and character
Round 2 - Technical 

(1 Question)

  • Q1. Experience details

I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Structure related pile foundation
  • Q2. Pile testing ,girder stressing
  • Q3. How much miller required for 500 cum concrete transporting
  • Ans. 

    The amount of miller required for transporting 500 cum concrete depends on various factors.

    • The type of miller being used

    • The distance the concrete needs to be transported

    • The size of the project

    • The time frame for completing the project

    • The availability of resources

    • The budget allocated for the project

  • Answered by AI
  • Q4. Girder launching
  • Q5. Box underpasses

Interview Preparation Tips

Interview preparation tips for other job seekers - Give only answer to the point which is no you
Round 1 - Group Discussion 

How to ensure team.efficiency

Round 2 - Case Study 

A case study on conflict management

Round 3 - One-on-one 

(1 Question)

  • Q1. Why do you want this job

Interview Preparation Tips

Interview preparation tips for other job seekers - Candidates should be lubricated before the final round with the domain head

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 835 Interviews
L&T Construction Interview Questions
4.0
 • 735 Interviews
Maruti Suzuki Interview Questions
4.2
 • 597 Interviews
JSW Steel Interview Questions
3.9
 • 578 Interviews
Hero MotoCorp Interview Questions
4.2
 • 331 Interviews
TVS Motor Interview Questions
4.0
 • 308 Interviews
Bajaj Auto Interview Questions
3.9
 • 270 Interviews
Ashok Leyland Interview Questions
4.1
 • 237 Interviews
View all
Assistant Manager
134 salaries
unlock blur

₹3.5 L/yr - ₹13.4 L/yr

Senior Executive
122 salaries
unlock blur

₹4.3 L/yr - ₹9.8 L/yr

Quality Inspector
81 salaries
unlock blur

₹1 L/yr - ₹3.5 L/yr

Quality Engineer
71 salaries
unlock blur

₹1.4 L/yr - ₹4.5 L/yr

Senior Engineer
65 salaries
unlock blur

₹2.5 L/yr - ₹6.3 L/yr

Explore more salaries
Compare Tube Investments of India with

Bharat Forge

3.9
Compare

Mahindra & Mahindra

4.1
Compare

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview