Filter interviews by
S.L.D stands for Single Line Diagram of an electrical scheme.
S.L.D is a simplified diagram that shows the electrical connections and components in a system.
It typically includes power sources, distribution lines, transformers, circuit breakers, and loads.
S.L.D helps in understanding the overall layout of the electrical system and how components are connected.
It is used for planning, designing, and troubleshooting elect...
Capacitor panels are used to improve power factor and reduce electricity costs.
Improves power factor by reducing reactive power consumption
Helps in reducing electricity costs by avoiding penalties for low power factor
Increases efficiency of electrical systems
Used in industries, commercial buildings, and large facilities
Top trending discussions
Some popular gypsum brands include USG, CertainTeed, and Georgia-Pacific.
USG
CertainTeed
Georgia-Pacific
Fire fighting system in highrise buildings includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses.
Fire alarms are installed throughout the building to alert occupants of a fire emergency.
Sprinkler systems automatically activate to extinguish fires in the early stages.
Fire extinguishers are strategically placed on each floor for manual fire suppression.
Fire hoses are available on each floor for trai...
Yes, Mivan shuttering is a popular construction technique used for casting walls and slabs in buildings.
Mivan shuttering is a formwork system that allows for rapid construction of concrete walls and slabs.
It involves setting up aluminum formwork panels that are easily assembled and dismantled.
Mivan shuttering is commonly used in high-rise buildings, residential complexes, and commercial projects.
The use of Mivan shutte...
The mix used for marble flooring typically consists of marble chips, cement, sand, and water.
Marble chips are the main component for marble flooring mix
Cement is used as a binding agent
Sand is added for strength and durability
Water is used to create a workable mixture
I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.
I have handled multiple ERP systems including SAP, Oracle, and Microsoft Dynamics.
I have experience with SAP ERP, which is widely used in large organizations for managing various business processes.
I have also worked with Oracle ERP, which offers a comprehensive suite of applications for finance, supply chain, and human resources management.
I am familiar with Microsoft Dynamics ERP, which is known for its user-friendly...
The modules were different components of the project that were developed separately.
The modules included a user interface module, a database module, and a reporting module.
Each module had its own team responsible for its development.
The modules were integrated together during the testing phase.
The project was divided into modules to ensure efficient development and easier maintenance.
Real Estate environment refers to the economic, legal, and physical factors that affect the buying, selling, and development of property.
Includes factors such as zoning laws, property taxes, and market trends
Involves various stakeholders such as buyers, sellers, agents, and developers
Can be influenced by macroeconomic factors such as interest rates and inflation
Examples of real estate projects include residential devel...
Project procurement and supply can be managed by following a structured process that includes planning, sourcing, contracting, and monitoring.
Develop a procurement plan that outlines the procurement process and identifies the goods and services required for the project
Identify potential suppliers and evaluate their capabilities and suitability for the project
Negotiate contracts that clearly define the scope of work, de...
Project management can be managed through effective planning, communication, and monitoring.
Create a detailed project plan with clear objectives and timelines
Communicate regularly with team members and stakeholders to ensure everyone is on the same page
Monitor progress and adjust the plan as needed to stay on track
Use project management tools and software to streamline processes
Delegate tasks and responsibilities to te...
Work orders should be tracked and managed against the original order to ensure timely completion and accurate billing.
Create a system for assigning and tracking work orders
Ensure work orders are properly documented and communicated to relevant parties
Regularly review progress and adjust timelines as needed
Ensure accurate billing by tracking work order completion and comparing to original order
Use technology such as pro...
Liaison in ERP involves communication and coordination between different departments and stakeholders to ensure smooth implementation and functioning of the system.
Liaison involves identifying key stakeholders and their roles in the ERP implementation process
It also involves establishing communication channels and protocols for sharing information and updates
Liaison helps to ensure that all departments are aligned with...
Yes, I have worked on multiple data migration projects.
Managed data migration from legacy systems to new platforms
Developed data mapping and transformation strategies
Ensured data accuracy and completeness through testing and validation
Collaborated with cross-functional teams to identify and resolve data issues
Examples: migrated customer data from Salesforce to HubSpot, migrated financial data from QuickBooks to SAP
I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.
posted on 25 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
The area of projects and types of projects I have worked on vary greatly.
I have worked on projects in various industries including construction, healthcare, and technology.
Types of projects I have worked on include software development, building construction, and medical equipment installation.
I am adaptable and able to quickly learn about new industries and project types.
I have experience working on both small and lar
posted on 25 Feb 2024
I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.
Material estimate for concrete, mortar and unit weights.
Calculate the volume of concrete needed based on project specifications
Determine the mix ratio of concrete (e.g. 1:2:4 for cement:sand:aggregate)
Calculate the weight of each material based on unit weights (e.g. 150 lbs/cubic foot for concrete)
I applied via Approached by Company and was interviewed before Sep 2021. There was 1 interview round.
posted on 1 Dec 2020
Some popular gypsum brands include USG, CertainTeed, and Georgia-Pacific.
USG
CertainTeed
Georgia-Pacific
Fire fighting system in highrise buildings includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses.
Fire alarms are installed throughout the building to alert occupants of a fire emergency.
Sprinkler systems automatically activate to extinguish fires in the early stages.
Fire extinguishers are strategically placed on each floor for manual fire suppression.
Fire hoses are available on each floor for trai...
Yes, Mivan shuttering is a popular construction technique used for casting walls and slabs in buildings.
Mivan shuttering is a formwork system that allows for rapid construction of concrete walls and slabs.
It involves setting up aluminum formwork panels that are easily assembled and dismantled.
Mivan shuttering is commonly used in high-rise buildings, residential complexes, and commercial projects.
The use of Mivan shutte...
The mix used for marble flooring typically consists of marble chips, cement, sand, and water.
Marble chips are the main component for marble flooring mix
Cement is used as a binding agent
Sand is added for strength and durability
Water is used to create a workable mixture
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
How many children and studying in class?
I currently live in New York City with my spouse and two children.
Living in New York City with spouse and two children
Total of four dependents including spouse and two children
Yes , after successful interview round, received offer letter from the company and same day replied.
Yes , after successful interview round, received offer.
based on 1 review
Rating in categories
Assistant Manager
19
salaries
| ₹3.6 L/yr - ₹8 L/yr |
Deputy Manager
11
salaries
| ₹6 L/yr - ₹9.4 L/yr |
Executive Accountant
11
salaries
| ₹2.4 L/yr - ₹3.8 L/yr |
Manager
8
salaries
| ₹7.2 L/yr - ₹18 L/yr |
Billing Engineer
8
salaries
| ₹2.2 L/yr - ₹7.2 L/yr |
DLF
Godrej Properties
Prestige Group
Sobha