Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There was 1 interview round.
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
I applied via Approached by Company and was interviewed before Mar 2023. There were 2 interview rounds.
English, Quant, Analytical
I applied via Referral and was interviewed before Nov 2023. There was 1 interview round.
I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.
The market rate of steel fluctuates based on supply and demand, global economic conditions, and trade policies.
Market rate of steel is influenced by factors such as supply and demand dynamics.
Global economic conditions, such as GDP growth and industrial output, impact steel prices.
Trade policies and tariffs can also affect the market rate of steel.
Steel prices can vary based on the type of steel (e.g. carbon steel, sta...
Yes, there are codes that need to be followed for BBS (Bar Bending Schedule) and steel cut lengths.
Codes such as IS 2502:1963 and IS 1786:2008 provide guidelines for BBS and steel cut lengths.
BBS includes details like bar mark, diameter, length, shape, and bending dimensions.
Steel cut lengths should be as per the required dimensions specified in the design drawings.
Following the codes ensures structural integrity and c
Rate for brickwork, formwork, and wardrobe dates are commonly used in construction projects to estimate costs.
Rate for brickwork is typically calculated per cubic meter (1cum)
Formwork is measured in square meters (sqm)
Wardrobe dates are measured in square feet (sft)
Rate analysis of Kota stone involves calculating the cost of materials, labor, and other expenses for a specific quantity of Kota stone work.
Calculate the cost of Kota stone per square foot or square meter.
Include the cost of transportation, labor, and other miscellaneous expenses.
Consider the wastage factor while calculating the total cost.
Compare the rates of different suppliers to get the best deal.
Use software or o
Rate analysis of granite involves calculating the cost of materials, labor, and equipment needed for a specific project.
Determine the quantity of granite required for the project
Calculate the cost of granite per unit
Estimate the cost of transportation, labor, and equipment
Factor in any additional costs such as taxes or overhead expenses
Compare quotes from different suppliers to get the best rate
To prepare the bbs, you need to marinate the meat, skewer it, and grill it to perfection.
Marinate the meat in a mixture of spices, yogurt, and lemon juice for at least 2 hours.
Skewer the marinated meat along with vegetables like bell peppers and onions.
Grill the skewers on a hot grill until the meat is cooked through and has a nice charred exterior.
Yes, I have knowledge of LISP commands in AutoCAD for QS works.
I have experience using LISP commands in AutoCAD for quantity surveying tasks.
I can create custom commands and automate repetitive tasks using LISP in AutoCAD.
For example, I have used LISP to generate reports, extract data, and streamline workflows in AutoCAD for QS projects.
I applied via Referral and was interviewed in Dec 2022. There were 2 interview rounds.
I currently work at XYZ Company as a Senior Assistant Manager.
Currently employed at XYZ Company
Position: Senior Assistant Manager
Responsibilities include overseeing daily operations, managing staff, and ensuring customer satisfaction
Implemented new strategies to improve efficiency and increase revenue
Collaborated with cross-functional teams to achieve company goals
I am currently earning a competitive salary in my current role as Deputy Manager.
I am currently earning a competitive salary in my current role.
My current CTC reflects my experience and skills as a Deputy Manager.
I am open to discussing my current CTC during the interview process.
based on 6 reviews
Rating in categories
Project Engineer
146
salaries
| ₹2.6 L/yr - ₹7.8 L/yr |
Assistant Project Manager
123
salaries
| ₹5.2 L/yr - ₹12.2 L/yr |
Project Manager
102
salaries
| ₹7 L/yr - ₹18.8 L/yr |
Assistant Facility Manager
95
salaries
| ₹2.9 L/yr - ₹7.2 L/yr |
Senior Project Engineer
83
salaries
| ₹4.1 L/yr - ₹9.5 L/yr |
CBRE
M3M India
R.S. Infraprojects
My Home Constructions