Filter interviews by
I applied via LinkedIn and was interviewed in Apr 2023. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
I would communicate with the client to understand the reason for the delay and negotiate a mutually agreeable solution.
Communicate with the client to understand the reason for the delay
Negotiate a mutually agreeable solution such as partial payment or revised payment terms
Offer incentives for early payment or penalties for late payment
Provide clear documentation of payment terms and consequences for non-payment
I would apologize for the delay and assure the client that we are working to resolve the issue promptly.
Apologize sincerely for the delay in possession
Explain the reasons for the delay, if known
Assure the client that their concerns are being addressed and provide a timeline for resolution
Offer compensation or alternative solutions to make up for the inconvenience
Maintain open communication with the client throughout th
The development length for M25 concrete and Fe 500 steel is determined based on various factors.
Development length is the length of reinforcement required to transfer the stress between the concrete and steel.
It depends on the bond strength between concrete and steel, concrete cover, and the diameter of the steel bar.
For M25 concrete and Fe 500 steel, the development length can be calculated using empirical formulas or...
The minimum thickness of slab depends on various factors such as load, span, and type of slab.
The minimum thickness of slab is generally 4 inches for residential buildings.
For commercial buildings, the minimum thickness of slab is 6 inches.
The thickness of slab also depends on the type of slab such as one-way or two-way slab.
The thickness of slab also depends on the span of the slab and the load it will bear.
The minimu...
The slab shuttering removal time depends on various factors such as concrete strength, weather conditions, and type of formwork used.
The removal time can range from 3 days to 21 days depending on the above factors.
For normal concrete with temperature above 20°C, the removal time is usually 7 days.
For concrete with high early strength, the removal time can be reduced to 3 days.
In cold weather conditions, the removal tim...
Mortars used for tiles bed are cement-based and are used to fix tiles to the substrate.
Cement-based mortars are commonly used for tiles bed
They are used to fix tiles to the substrate
The mortar should be mixed with water to form a paste
The paste is then applied to the substrate using a notched trowel
Tiles are then placed onto the mortar and pressed firmly into place
The mortar should be allowed to dry and set before grou
Mahagun India interview questions for popular designations
I applied via Naukri.com and was interviewed before Oct 2022. There were 3 interview rounds.
Different types of stones used in construction include granite, marble, limestone, sandstone, and slate.
Granite - known for its durability and strength, commonly used for countertops and flooring
Marble - prized for its elegance and beauty, often used in sculptures and building facades
Limestone - versatile and easily carved, used in construction of buildings and monuments
Sandstone - porous and weather-resistant, commonl...
I was interviewed before Jan 2023.
Rolling margin is a financial metric that measures the profitability of a company over a specific period by calculating the difference between its revenue and cost of goods sold.
Rolling margin is calculated by subtracting the cost of goods sold from the revenue.
It provides insight into the efficiency and profitability of a company's operations.
The rolling margin is expressed as a percentage, representing the profit mar...
I applied via Naukri.com and was interviewed in Oct 2021. There were 4 interview rounds.
I applied via Company Website and was interviewed in Aug 2021. There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the Mahagun India interview -
based on 5 interviews
Interview experience
based on 221 reviews
Rating in categories
Assistant Manager
24
salaries
| ₹3.5 L/yr - ₹9 L/yr |
Senior Accounts Executive
16
salaries
| ₹4 L/yr - ₹5.4 L/yr |
Senior Engineer
15
salaries
| ₹4.2 L/yr - ₹9.1 L/yr |
Civil Site Engineer
15
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Civil Foreman
15
salaries
| ₹3 L/yr - ₹5.4 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group