Upload Button Icon Add office photos

Filter interviews by

Suncity Projects Site Engineer Interview Questions and Answers

Updated 7 May 2024

Suncity Projects Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Vivek Kumar

posted on 7 May 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Qas asked some questions from profit and loss and trigonometry.

Round 2 - One-on-one 

(6 Questions)

  • Q1. The difference between opc and ppc
  • Ans. 

    OPC is Ordinary Portland Cement, while PPC is Portland Pozzolana Cement. The main difference is the materials used in their production.

    • OPC is made from limestone and clay, while PPC is made from a mixture of pozzolanic material like fly ash, volcanic ash, etc.

    • PPC is more environmentally friendly as it uses industrial by-products, reducing the carbon footprint.

    • PPC has better workability and is more resistant to chemical...

  • Answered by AI
  • Q2. The grade of steel currently in usage and their types
  • Ans. 

    Different grades of steel are used for different applications, such as construction, automotive, and manufacturing.

    • Common grades of steel include A36, A572, and A500 for construction purposes.

    • High-strength low-alloy (HSLA) steels like A588 and A709 are used in structural applications.

    • Tool steels like D2 and O1 are used for cutting and shaping materials.

    • Stainless steels like 304 and 316 are corrosion-resistant and used ...

  • Answered by AI
  • Q3. The setting time of concrete
  • Ans. 

    Setting time of concrete refers to the time it takes for the concrete to harden and become solid.

    • Setting time can vary based on factors like temperature, humidity, and mix design.

    • Setting time is important for construction projects to ensure proper curing and strength development.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to adjus

  • Answered by AI
  • Q4. Volume of 1 bag of cement and 1 cube
  • Ans. 

    The volume of 1 bag of cement and 1 cube can vary depending on the size and density of the materials.

    • The volume of 1 bag of cement is typically around 0.035 cubic meters or 35 liters.

    • The volume of 1 cube can vary depending on the size, but a standard cube may have a volume of 1 cubic meter.

    • It's important to consider the density of the materials when calculating volume.

  • Answered by AI
  • Q5. Whats the use of fly ash in concrete
  • Ans. 

    Fly ash is used in concrete as a replacement for Portland cement to improve workability, reduce permeability, increase durability, and decrease cost.

    • Improves workability by reducing water demand

    • Reduces permeability and increases durability

    • Decreases cost by replacing some of the Portland cement

    • Can improve the long-term strength of concrete

    • Helps in reducing greenhouse gas emissions

  • Answered by AI
  • Q6. Whats hoop strees and punching failure
  • Ans. 

    Hoop stress is the stress exerted circumferentially in a cylindrical pressure vessel, while punching failure is a type of failure that occurs in structural elements subjected to concentrated loads.

    • Hoop stress is calculated using the formula: σ = PD/2t, where P is the internal pressure, D is the diameter, and t is the thickness of the vessel.

    • Punching failure occurs when a concentrated load is applied to a structural ele...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive and answer only those questions which you know correctly.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Asked me my work experience and my education.
Round 2 - HR 

(1 Question)

  • Q1. About My work experince and my education and my knowledge.
Round 3 - One-on-one 

(2 Questions)

  • Q1. About my work experience and my education and my knowledge.
  • Q2. My Interoduction and my

Interview Preparation Tips

Interview preparation tips for other job seekers - I am very honesty and hord working person.

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. What is production?
  • Ans. 

    Production refers to the process of creating goods or services using resources and labor.

    • Production involves transforming raw materials into finished products or providing services to customers.

    • It includes activities such as manufacturing, assembly, packaging, and distribution.

    • Examples of production include car manufacturing, food processing, and software development.

    • Efficient production is essential for businesses to

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. He just asked how much will you take?

Interview Preparation Tips

Round: HR Interview
Experience: Nothing much, they are all concerned about money.
Tips: Just tell them as per company standard.

I applied via Company Website and was interviewed before Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Draw SFD & BMD for a simply supported load.
  • Ans. 

    SFD & BMD for a simply supported load

    • SFD is a diagram that shows the variation of shear force along the length of a beam

    • BMD is a diagram that shows the variation of bending moment along the length of a beam

    • For a simply supported load, the SFD will be a straight line with a constant slope

    • The BMD will be a parabolic curve with the maximum value at the center of the beam

    • The SFD and BMD can be calculated using equations an

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good and they asked lot of questions about Is codes and from site related questions.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About department questions
Round 3 - Aptitude Test 

About numerical, blood relation etc.,

Round 4 - HR 

(1 Question)

  • Q1. Skills, self intro, Salary discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. About Your self ? My self Ramachandra pradhan , I am from Odisha My father is farmer and my mother is house wife We are 2 brother and 1 sister , I am working in sobha may18, 2022 to January 24 , 2024 Wha...
  • Q2. What you expect salary? I want 24,000
  • Q3. How much your experience? I have a 1.5 year experience.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. What is cement and types of cement
  • Ans. 

    Cement is a binding material used in construction. Types include Portland cement, white cement, and rapid-hardening cement.

    • Cement is a fine powder made from limestone, clay, and other minerals.

    • Portland cement is the most common type used in construction.

    • White cement is used for architectural purposes to achieve a clean, bright finish.

    • Rapid-hardening cement sets quickly and is ideal for projects with tight deadlines.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. What is the lapping of steel
  • Ans. 

    Lapping of steel is the process of overlapping two pieces of steel to create a continuous connection.

    • Lapping is commonly used in construction to join reinforcing steel bars together.

    • The overlapping length is typically specified in construction drawings or codes.

    • Proper lapping ensures structural integrity and strength of the steel connection.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sobha Site Engineer interview:
  • Steel Structures
  • Infrastructure
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is formwork and their types
  • Q2. Grades of concrete and steel
Round 2 - HR 

(2 Questions)

  • Q1. Are to ready to work in tight schedule like overnight from 8 am to 6pm
  • Q2. How many years you are work in this company

Interview Preparation Tips

Interview preparation tips for other job seekers - If u are going to attend interview for site engineer Mainly focus on
1. IS456:2000
2.form Work
3. Steel Bar bending schedule
4. Basic civil engineering related knowledge

Suncity Projects Interview FAQs

How many rounds are there in Suncity Projects Site Engineer interview?
Suncity Projects interview process usually has 2 rounds. The most common rounds in the Suncity Projects interview process are Aptitude Test and One-on-one Round.

Tell us how to improve this page.

Suncity Projects Site Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Suncity Projects Site Engineer Salary
based on 7 salaries
₹2.8 L/yr - ₹4.8 L/yr
At par with the average Site Engineer Salary in India
View more details

Suncity Projects Site Engineer Reviews and Ratings

based on 3 reviews

3.9/5

Rating in categories

4.2

Skill development

4.2

Work-life balance

4.4

Salary

3.9

Job security

3.9

Company culture

3.9

Promotions

4.2

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
19 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive Accountant
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Suncity Projects with

DLF

3.9
Compare

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview