S.L.D stands for Single Line Diagram of an electrical scheme.
S.L.D is a simplified diagram that shows the electrical connections and components in a system.
It typically includes power sources, distribution lines, transformers, circuit breakers, and loads.
S.L.D helps in understanding the overall layout of the electrical system and how components are connected.
It is used for planning, designing, and troubleshooting elect...
Capacitor panels are used to improve power factor and reduce electricity costs.
Improves power factor by reducing reactive power consumption
Helps in reducing electricity costs by avoiding penalties for low power factor
Increases efficiency of electrical systems
Used in industries, commercial buildings, and large facilities
I applied via Referral and was interviewed before Sep 2023. There was 1 interview round.
Yes, there was a major incident at the site involving a machinery malfunction.
Machinery malfunction led to a temporary shutdown of operations
Emergency response team was activated to address the issue
Investigation revealed a faulty component as the root cause
I took immediate action to resolve the issue and prevent any further complications.
Identified the root cause of the problem
Developed a plan of action
Implemented necessary changes or fixes
Monitored the situation to ensure effectiveness
I expect to be given the opportunity to lead a team, make strategic decisions, and drive technical innovation.
Opportunity to lead a team
Make strategic decisions
Drive technical innovation
I can join within 2 weeks of receiving a formal offer.
I can start within 2 weeks of receiving a formal offer.
My current notice period is 2 weeks.
I am available to start immediately if needed.
Suncity Projects interview questions for popular designations
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
Qas asked some questions from profit and loss and trigonometry.
OPC is Ordinary Portland Cement, while PPC is Portland Pozzolana Cement. The main difference is the materials used in their production.
OPC is made from limestone and clay, while PPC is made from a mixture of pozzolanic material like fly ash, volcanic ash, etc.
PPC is more environmentally friendly as it uses industrial by-products, reducing the carbon footprint.
PPC has better workability and is more resistant to chemical...
Different grades of steel are used for different applications, such as construction, automotive, and manufacturing.
Common grades of steel include A36, A572, and A500 for construction purposes.
High-strength low-alloy (HSLA) steels like A588 and A709 are used in structural applications.
Tool steels like D2 and O1 are used for cutting and shaping materials.
Stainless steels like 304 and 316 are corrosion-resistant and used ...
Setting time of concrete refers to the time it takes for the concrete to harden and become solid.
Setting time can vary based on factors like temperature, humidity, and mix design.
Setting time is important for construction projects to ensure proper curing and strength development.
For example, in hot weather, concrete may set faster, while in cold weather it may take longer.
Accelerators or retarders can be added to adjus
The volume of 1 bag of cement and 1 cube can vary depending on the size and density of the materials.
The volume of 1 bag of cement is typically around 0.035 cubic meters or 35 liters.
The volume of 1 cube can vary depending on the size, but a standard cube may have a volume of 1 cubic meter.
It's important to consider the density of the materials when calculating volume.
Fly ash is used in concrete as a replacement for Portland cement to improve workability, reduce permeability, increase durability, and decrease cost.
Improves workability by reducing water demand
Reduces permeability and increases durability
Decreases cost by replacing some of the Portland cement
Can improve the long-term strength of concrete
Helps in reducing greenhouse gas emissions
Hoop stress is the stress exerted circumferentially in a cylindrical pressure vessel, while punching failure is a type of failure that occurs in structural elements subjected to concentrated loads.
Hoop stress is calculated using the formula: σ = PD/2t, where P is the internal pressure, D is the diameter, and t is the thickness of the vessel.
Punching failure occurs when a concentrated load is applied to a structural ele...
To handle operations, one needs to have a clear understanding of the processes involved and the ability to manage resources effectively.
Develop and implement standard operating procedures
Ensure efficient use of resources
Monitor performance and make necessary adjustments
Communicate effectively with team members and stakeholders
Identify and mitigate risks
Continuously improve processes
Stay up-to-date with industry trends
Top trending discussions
posted on 10 Sep 2017
I was interviewed before Sep 2016.
I want to join the company because of its innovative projects and strong company culture.
I am impressed by the company's track record of successful projects.
I believe the company's values align with my own professional goals.
I am excited about the opportunity to work with a talented team of professionals.
I see great potential for growth and development within the company.
I am a dedicated and hardworking individual with relevant skills and experience.
I have a strong work ethic and am committed to delivering high-quality results.
I have relevant experience and skills that align with the requirements of the position.
I am a quick learner and adaptable to new environments.
I am passionate about the industry and eager to contribute to the team.
I would like to work in a marketing and communications profile.
Experience in creating marketing campaigns
Strong communication skills
Ability to analyze market trends and consumer behavior
Proficiency in social media and digital marketing
Collaboration with cross-functional teams
posted on 20 Feb 2015
based on 5 interviews
Interview experience
based on 88 reviews
Rating in categories
Assistant Manager
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
DLF
Godrej Properties
Prestige Group
Sobha