Upload Button Icon Add office photos

Suncity Projects

Compare button icon Compare button icon Compare

Filter interviews by

Suncity Projects Interview Questions and Answers

Updated 1 Oct 2024
Popular Designations

8 Interview questions

A Senior Technical Manager was asked 8mo ago
Q. Was there any major incident at the site?
Ans. 

Yes, there was a major incident at the site involving a machinery malfunction.

  • Machinery malfunction led to a temporary shutdown of operations

  • Emergency response team was activated to address the issue

  • Investigation revealed a faulty component as the root cause

View all Senior Technical Manager interview questions
A Site engineee was asked 11mo ago
Q. What is the difference between formwork and shuttering?
Ans. 

Formwork is a temporary structure to support concrete until it hardens, while shuttering refers specifically to the panels used in formwork.

  • Formwork is the overall system, including supports and panels.

  • Shuttering specifically refers to the panels that hold the concrete.

  • Formwork can be made from wood, metal, or plastic; shuttering is often plywood or steel.

  • Example: In a concrete slab, the formwork includes beams an...

A Site Engineer was asked
Q. What is the use of fly ash in concrete?
Ans. 

Fly ash is used in concrete as a replacement for Portland cement to improve workability, reduce permeability, increase durability, and decrease cost.

  • Improves workability by reducing water demand

  • Reduces permeability and increases durability

  • Decreases cost by replacing some of the Portland cement

  • Can improve the long-term strength of concrete

  • Helps in reducing greenhouse gas emissions

View all Site Engineer interview questions
A Site Engineer was asked
Q. What is the difference between OPC and PPC?
Ans. 

OPC is Ordinary Portland Cement, while PPC is Portland Pozzolana Cement. The main difference is the materials used in their production.

  • OPC is made from limestone and clay, while PPC is made from a mixture of pozzolanic material like fly ash, volcanic ash, etc.

  • PPC is more environmentally friendly as it uses industrial by-products, reducing the carbon footprint.

  • PPC has better workability and is more resistant to che...

View all Site Engineer interview questions
A Senior Project Manager was asked
Q. Why should a capacitor panel be used?
Ans. 

Capacitor panels are used to improve power factor and reduce electricity costs.

  • Improves power factor by reducing reactive power consumption

  • Helps in reducing electricity costs by avoiding penalties for low power factor

  • Increases efficiency of electrical systems

  • Used in industries, commercial buildings, and large facilities

View all Senior Project Manager interview questions
An Operations Manager was asked
Q. How do you handle operations?
Ans. 

To handle operations, one needs to have a clear understanding of the processes involved and the ability to manage resources effectively.

  • Develop and implement standard operating procedures

  • Ensure efficient use of resources

  • Monitor performance and make necessary adjustments

  • Communicate effectively with team members and stakeholders

  • Identify and mitigate risks

  • Continuously improve processes

  • Stay up-to-date with industry tr...

View all Operations Manager interview questions
A Purchase n procurement was asked
Q. How much social media do you use?
Ans. 

I actively use social media for professional networking, market research, and staying updated on industry trends.

  • I use LinkedIn daily to connect with industry professionals and share insights.

  • I follow relevant Twitter accounts for real-time updates on procurement trends.

  • I participate in Facebook groups focused on procurement best practices.

  • I utilize Instagram to follow brands and see their product launches and mar...

Are these interview questions helpful?
A Senior Project Manager was asked
Q. S.L.D of Electrical scheme
Ans. 

S.L.D stands for Single Line Diagram of an electrical scheme.

  • S.L.D is a simplified diagram that shows the electrical connections and components in a system.

  • It typically includes power sources, distribution lines, transformers, circuit breakers, and loads.

  • S.L.D helps in understanding the overall layout of the electrical system and how components are connected.

  • It is used for planning, designing, and troubleshooting ...

View all Senior Project Manager interview questions

Suncity Projects Interview Experiences

7 interviews found

Interview Questions & Answers

user image Anonymous

posted on 17 Nov 2020

Interview Questionnaire 

1 Question

  • Q1. How much socha media you use ?
  • Ans. 

    I actively use social media for professional networking, market research, and staying updated on industry trends.

    • I use LinkedIn daily to connect with industry professionals and share insights.

    • I follow relevant Twitter accounts for real-time updates on procurement trends.

    • I participate in Facebook groups focused on procurement best practices.

    • I utilize Instagram to follow brands and see their product launches and marketin...

  • Answered by AI

Interview Questions & Answers

user image Anonymous

posted on 18 Jul 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Difference between formwork and shutteeing
  • Ans. 

    Formwork is a temporary structure to support concrete until it hardens, while shuttering refers specifically to the panels used in formwork.

    • Formwork is the overall system, including supports and panels.

    • Shuttering specifically refers to the panels that hold the concrete.

    • Formwork can be made from wood, metal, or plastic; shuttering is often plywood or steel.

    • Example: In a concrete slab, the formwork includes beams and pan...

  • Answered by AI
  • Q2. Slab thickness in commercial buildings

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary and increment on time.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. S.L.D of Electrical scheme
  • Ans. 

    S.L.D stands for Single Line Diagram of an electrical scheme.

    • S.L.D is a simplified diagram that shows the electrical connections and components in a system.

    • It typically includes power sources, distribution lines, transformers, circuit breakers, and loads.

    • S.L.D helps in understanding the overall layout of the electrical system and how components are connected.

    • It is used for planning, designing, and troubleshooting elect...

  • Answered by AI
  • Q2. Why use capacitor panel use
  • Ans. 

    Capacitor panels are used to improve power factor and reduce electricity costs.

    • Improves power factor by reducing reactive power consumption

    • Helps in reducing electricity costs by avoiding penalties for low power factor

    • Increases efficiency of electrical systems

    • Used in industries, commercial buildings, and large facilities

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Was there any major incidence at site ?
  • Ans. 

    Yes, there was a major incident at the site involving a machinery malfunction.

    • Machinery malfunction led to a temporary shutdown of operations

    • Emergency response team was activated to address the issue

    • Investigation revealed a faulty component as the root cause

  • Answered by AI
  • Q2. What was your action ?
  • Ans. 

    I took immediate action to resolve the issue and prevent any further complications.

    • Identified the root cause of the problem

    • Developed a plan of action

    • Implemented necessary changes or fixes

    • Monitored the situation to ensure effectiveness

  • Answered by AI
  • Q3. What is your expectation ?
  • Ans. 

    I expect to be given the opportunity to lead a team, make strategic decisions, and drive technical innovation.

    • Opportunity to lead a team

    • Make strategic decisions

    • Drive technical innovation

  • Answered by AI
  • Q4. After How many days you can join.
  • Ans. 

    I can join within 2 weeks of receiving a formal offer.

    • I can start within 2 weeks of receiving a formal offer.

    • My current notice period is 2 weeks.

    • I am available to start immediately if needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do your duty & enjoy yourself.

Site Engineer Interview Questions & Answers

user image Vivek Kumar

posted on 7 May 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Qas asked some questions from profit and loss and trigonometry.

Round 2 - One-on-one 

(6 Questions)

  • Q1. The difference between opc and ppc
  • Ans. 

    OPC is Ordinary Portland Cement, while PPC is Portland Pozzolana Cement. The main difference is the materials used in their production.

    • OPC is made from limestone and clay, while PPC is made from a mixture of pozzolanic material like fly ash, volcanic ash, etc.

    • PPC is more environmentally friendly as it uses industrial by-products, reducing the carbon footprint.

    • PPC has better workability and is more resistant to chemical...

  • Answered by AI
  • Q2. The grade of steel currently in usage and their types
  • Ans. 

    Different grades of steel are used for different applications, such as construction, automotive, and manufacturing.

    • Common grades of steel include A36, A572, and A500 for construction purposes.

    • High-strength low-alloy (HSLA) steels like A588 and A709 are used in structural applications.

    • Tool steels like D2 and O1 are used for cutting and shaping materials.

    • Stainless steels like 304 and 316 are corrosion-resistant and used ...

  • Answered by AI
  • Q3. The setting time of concrete
  • Ans. 

    Setting time of concrete refers to the time it takes for the concrete to harden and become solid.

    • Setting time can vary based on factors like temperature, humidity, and mix design.

    • Setting time is important for construction projects to ensure proper curing and strength development.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to adjus...

  • Answered by AI
  • Q4. Volume of 1 bag of cement and 1 cube
  • Ans. 

    The volume of 1 bag of cement and 1 cube can vary depending on the size and density of the materials.

    • The volume of 1 bag of cement is typically around 0.035 cubic meters or 35 liters.

    • The volume of 1 cube can vary depending on the size, but a standard cube may have a volume of 1 cubic meter.

    • It's important to consider the density of the materials when calculating volume.

  • Answered by AI
  • Q5. Whats the use of fly ash in concrete
  • Ans. 

    Fly ash is used in concrete as a replacement for Portland cement to improve workability, reduce permeability, increase durability, and decrease cost.

    • Improves workability by reducing water demand

    • Reduces permeability and increases durability

    • Decreases cost by replacing some of the Portland cement

    • Can improve the long-term strength of concrete

    • Helps in reducing greenhouse gas emissions

  • Answered by AI
  • Q6. Whats hoop strees and punching failure
  • Ans. 

    Hoop stress is the stress exerted circumferentially in a cylindrical pressure vessel, while punching failure is a type of failure that occurs in structural elements subjected to concentrated loads.

    • Hoop stress is calculated using the formula: σ = PD/2t, where P is the internal pressure, D is the diameter, and t is the thickness of the vessel.

    • Punching failure occurs when a concentrated load is applied to a structural ele...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive and answer only those questions which you know correctly.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How to handle to operations
  • Ans. 

    To handle operations, one needs to have a clear understanding of the processes involved and the ability to manage resources effectively.

    • Develop and implement standard operating procedures

    • Ensure efficient use of resources

    • Monitor performance and make necessary adjustments

    • Communicate effectively with team members and stakeholders

    • Identify and mitigate risks

    • Continuously improve processes

    • Stay up-to-date with industry trends ...

  • Answered by AI
  • Q2. Basics as per experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you are saying. Use your experience based knowledge

Top trending discussions

View All
Interview Tips & Stories
5d (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Suncity Projects?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Company Website and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Type of work I am doing in previous company
  • Ans. 

    In my previous role, I led engineering projects, optimized processes, and collaborated with cross-functional teams to deliver innovative solutions.

    • Led a team of engineers to develop a new software application that improved user experience by 30%.

    • Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.

    • Collaborated with product management to define project scope and requirements, ensuring a...

  • Answered by AI
  • Q2. All construction activities I handeld

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company & Good Culture

I applied via Campus Placement and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Why sales in real estate
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical questions about real estate

Interview Preparation Tips

Interview preparation tips for other job seekers - Be well versed about about HR round and technical words about real estate.

Like RERA, CC, OC, etc.

Deputy Manager Interview Questions & Answers

JP Infra user image Rahul Sadashiv Palkar

posted on 2 Aug 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Self, education, family, about current job, JD, salary, expectation.
Round 3 - One-on-one 

(1 Question)

  • Q1. JD, product knowledge, market knowledge, GST, taxation, communication skill
Round 4 - Technical 

(1 Question)

  • Q1. Excel test, mail drafting, calculation

Suncity Projects Interview FAQs

How many rounds are there in Suncity Projects interview?
Suncity Projects interview process usually has 1-2 rounds. The most common rounds in the Suncity Projects interview process are One-on-one Round, Technical and Resume Shortlist.
How to prepare for Suncity Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Suncity Projects. The most common topics and skills that interviewers at Suncity Projects expect are Accounting, CMA Data, Project Accounting, Access Control and Accounts Payable.
What are the top questions asked in Suncity Projects interview?

Some of the top questions asked at the Suncity Projects interview -

  1. Was there any major incidence at sit...read more
  2. Whats the use of fly ash in concr...read more
  3. How much socha media you us...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.8/5

based on 5 interview experiences

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 100%
View more

Interview Questions from Similar Companies

InvestoXpert Interview Questions
4.2
 • 78 Interviews
Knight Frank Interview Questions
4.1
 • 51 Interviews
Aliens Group Interview Questions
3.6
 • 40 Interviews
Smartworks Interview Questions
3.5
 • 36 Interviews
Nyati Group Interview Questions
4.1
 • 33 Interviews
JP Infra Interview Questions
3.7
 • 20 Interviews
View all

Suncity Projects Reviews and Ratings

based on 98 reviews

3.9/5

Rating in categories

3.5

Skill development

4.0

Work-life balance

3.5

Salary

3.6

Job security

3.4

Company culture

3.2

Promotions

3.6

Work satisfaction

Explore 98 Reviews and Ratings
Assistant Manager
19 salaries
unlock blur

₹3.6 L/yr - ₹8 L/yr

Deputy Manager
11 salaries
unlock blur

₹6 L/yr - ₹10.1 L/yr

Site Engineer
10 salaries
unlock blur

₹2.8 L/yr - ₹6 L/yr

Executive Accountant
9 salaries
unlock blur

₹2.4 L/yr - ₹3.8 L/yr

Project Engineer
9 salaries
unlock blur

₹3.6 L/yr - ₹6.4 L/yr

Explore more salaries
Compare Suncity Projects with

Knight Frank

4.1
Compare

R.S. Infraprojects

3.9
Compare

SMEC

3.6
Compare

BPTP

4.2
Compare
write
Share an Interview