Upload Button Icon Add office photos

Filter interviews by

Suncity Projects Interview Questions, Process, and Tips

Updated 1 Oct 2024

Top Suncity Projects Interview Questions and Answers

View all 7 questions

Suncity Projects Interview Experiences

Popular Designations

7 interviews found

Purchase n procurement Interview Questions & Answers

user image Anonymous

posted on 17 Nov 2020

Interview Questionnaire 

1 Question

  • Q1. How much socha media you use ?

Site engineee Interview Questions & Answers

user image Anonymous

posted on 18 Jul 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Difference between formwork and shutteeing
  • Q2. Slab thickness in commercial buildings

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary and increment on time.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. S.L.D of Electrical scheme
  • Ans. 

    S.L.D stands for Single Line Diagram of an electrical scheme.

    • S.L.D is a simplified diagram that shows the electrical connections and components in a system.

    • It typically includes power sources, distribution lines, transformers, circuit breakers, and loads.

    • S.L.D helps in understanding the overall layout of the electrical system and how components are connected.

    • It is used for planning, designing, and troubleshooting elect...

  • Answered by AI
  • Q2. Why use capacitor panel use
  • Ans. 

    Capacitor panels are used to improve power factor and reduce electricity costs.

    • Improves power factor by reducing reactive power consumption

    • Helps in reducing electricity costs by avoiding penalties for low power factor

    • Increases efficiency of electrical systems

    • Used in industries, commercial buildings, and large facilities

  • Answered by AI

Senior Project Manager Interview Questions asked at other Companies

Q1. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. 120kg pet cum 3:- The 5 no sample... read more
View answer (3)

Suncity Projects interview questions for popular designations

 Operations Manager

 (1)

 Senior Engineer

 (1)

 Senior Project Manager

 (1)

 Senior Technical Manager

 (1)

 Site Engineer

 (1)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Was there any major incidence at site ?
  • Ans. 

    Yes, there was a major incident at the site involving a machinery malfunction.

    • Machinery malfunction led to a temporary shutdown of operations

    • Emergency response team was activated to address the issue

    • Investigation revealed a faulty component as the root cause

  • Answered by AI
  • Q2. What was your action ?
  • Ans. 

    I took immediate action to resolve the issue and prevent any further complications.

    • Identified the root cause of the problem

    • Developed a plan of action

    • Implemented necessary changes or fixes

    • Monitored the situation to ensure effectiveness

  • Answered by AI
  • Q3. What is your expectation ?
  • Ans. 

    I expect to be given the opportunity to lead a team, make strategic decisions, and drive technical innovation.

    • Opportunity to lead a team

    • Make strategic decisions

    • Drive technical innovation

  • Answered by AI
  • Q4. After How many days you can join.
  • Ans. 

    I can join within 2 weeks of receiving a formal offer.

    • I can start within 2 weeks of receiving a formal offer.

    • My current notice period is 2 weeks.

    • I am available to start immediately if needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do your duty & enjoy yourself.

Senior Technical Manager Interview Questions asked at other Companies

Q1. What is micro Service? How do you use Spring Boot to create micro service? What is rest controller? Explain Lamda function? What is Binary functions?
View answer (1)

Site Engineer Interview Questions & Answers

user image Vivek Kumar

posted on 7 May 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Qas asked some questions from profit and loss and trigonometry.

Round 2 - One-on-one 

(6 Questions)

  • Q1. The difference between opc and ppc
  • Ans. 

    OPC is Ordinary Portland Cement, while PPC is Portland Pozzolana Cement. The main difference is the materials used in their production.

    • OPC is made from limestone and clay, while PPC is made from a mixture of pozzolanic material like fly ash, volcanic ash, etc.

    • PPC is more environmentally friendly as it uses industrial by-products, reducing the carbon footprint.

    • PPC has better workability and is more resistant to chemical...

  • Answered by AI
  • Q2. The grade of steel currently in usage and their types
  • Ans. 

    Different grades of steel are used for different applications, such as construction, automotive, and manufacturing.

    • Common grades of steel include A36, A572, and A500 for construction purposes.

    • High-strength low-alloy (HSLA) steels like A588 and A709 are used in structural applications.

    • Tool steels like D2 and O1 are used for cutting and shaping materials.

    • Stainless steels like 304 and 316 are corrosion-resistant and used ...

  • Answered by AI
  • Q3. The setting time of concrete
  • Ans. 

    Setting time of concrete refers to the time it takes for the concrete to harden and become solid.

    • Setting time can vary based on factors like temperature, humidity, and mix design.

    • Setting time is important for construction projects to ensure proper curing and strength development.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to adjus

  • Answered by AI
  • Q4. Volume of 1 bag of cement and 1 cube
  • Ans. 

    The volume of 1 bag of cement and 1 cube can vary depending on the size and density of the materials.

    • The volume of 1 bag of cement is typically around 0.035 cubic meters or 35 liters.

    • The volume of 1 cube can vary depending on the size, but a standard cube may have a volume of 1 cubic meter.

    • It's important to consider the density of the materials when calculating volume.

  • Answered by AI
  • Q5. Whats the use of fly ash in concrete
  • Ans. 

    Fly ash is used in concrete as a replacement for Portland cement to improve workability, reduce permeability, increase durability, and decrease cost.

    • Improves workability by reducing water demand

    • Reduces permeability and increases durability

    • Decreases cost by replacing some of the Portland cement

    • Can improve the long-term strength of concrete

    • Helps in reducing greenhouse gas emissions

  • Answered by AI
  • Q6. Whats hoop strees and punching failure
  • Ans. 

    Hoop stress is the stress exerted circumferentially in a cylindrical pressure vessel, while punching failure is a type of failure that occurs in structural elements subjected to concentrated loads.

    • Hoop stress is calculated using the formula: σ = PD/2t, where P is the internal pressure, D is the diameter, and t is the thickness of the vessel.

    • Punching failure occurs when a concentrated load is applied to a structural ele...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive and answer only those questions which you know correctly.

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How to handle to operations
  • Ans. 

    To handle operations, one needs to have a clear understanding of the processes involved and the ability to manage resources effectively.

    • Develop and implement standard operating procedures

    • Ensure efficient use of resources

    • Monitor performance and make necessary adjustments

    • Communicate effectively with team members and stakeholders

    • Identify and mitigate risks

    • Continuously improve processes

    • Stay up-to-date with industry trends

  • Answered by AI
  • Q2. Basics as per experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you are saying. Use your experience based knowledge

Operations Manager Interview Questions asked at other Companies

Q1. That, if a student, who passed 12th and doesn't want to study further so how would you convince him to study more
View answer (5)

Interview questions from similar companies

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Mar 2019. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Work experience regarding
  • Ans. 

    I have over 10 years of experience in sales, with a proven track record of exceeding targets and building strong client relationships.

    • Managed a portfolio of key accounts, consistently meeting and exceeding sales targets

    • Developed and implemented strategic sales plans to drive revenue growth

    • Built and maintained strong relationships with clients, resulting in repeat business and referrals

    • Utilized CRM systems to track sale...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Asks about real estate
Round 3 - Group Discussion 

With sales head and site head

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary is before 7 but too much pressure and politics
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Why you want to leave the present company? What was your present salary ? What is your over in total experiance and how many years you worked with the Supertech ltd? What is your educational and technical ...
  • Q2. NOC from existing certificate required, three contact numbers with job profile of known person required and should be other than family and relative , do you know any employee working with SIKKA Group , pu...
  • Q3. What is yours family back ground? How many children you have, are they studying or working some where? What is your spouse working or house working? Where you are living ?
Round 3 - Technical 

(2 Questions)

  • Q1. Presently at which project are you working, what was your roll there , is it multy stories ? commercial or residential , what is project cost ? How many flats/ shops are there ? How many is total sealable...
  • Q2. I had worked at on going projects such as Kaamya Greens Greater Noida, Kimantra Greens, Karnam Greens ,Kamana Greens &Kirat Greens atNoida
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Directly ask for joining and tell to work with commitment
  • Q2. Ready to relocate
Round 2 - HR 

(2 Questions)

  • Q1. Salary will be hike after 6months
  • Q2. No appointment letter will be given till 1 year.

Interview Preparation Tips

Interview preparation tips for other job seekers - Never join this company , you should leave your family parents everyone to work here, no proper timings, lot of stress 16-18hrs of working hrs. Salary deductions for project delay and material loss . Monday to sunday working days, sunday upto 3:30pm to work, remaining days, 8am to no particular time of leaving. You may go home at midnight 2am or 3am.

Suncity Projects Interview FAQs

How many rounds are there in Suncity Projects interview?
Suncity Projects interview process usually has 1-2 rounds. The most common rounds in the Suncity Projects interview process are Technical, One-on-one Round and Aptitude Test.
How to prepare for Suncity Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Suncity Projects. The most common topics and skills that interviewers at Suncity Projects expect are Accounting, CMA Data, Project Accounting, Access Control and Accounts Payable.
What are the top questions asked in Suncity Projects interview?

Some of the top questions asked at the Suncity Projects interview -

  1. Was there any major incidence at sit...read more
  2. How much socha media you us...read more
  3. How to handle to operati...read more

Tell us how to improve this page.

Suncity Projects Interview Process

based on 5 interviews in last 1 year

Interview experience

4.4
  
Good

People are getting interviews through

based on 2 Suncity Projects interviews
WalkIn
Referral
50%
50%
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 123 Interviews
DLF Interview Questions
4.0
 • 72 Interviews
Prestige Group Interview Questions
4.3
 • 35 Interviews
Brigade Group Interview Questions
4.2
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
View all

Suncity Projects Reviews and Ratings

based on 86 reviews

3.9/5

Rating in categories

3.5

Skill development

3.9

Work-Life balance

3.7

Salary & Benefits

3.6

Job Security

3.5

Company culture

3.4

Promotions/Appraisal

3.5

Work Satisfaction

Explore 86 Reviews and Ratings
Assistant Manager
19 salaries
unlock blur

₹3.6 L/yr - ₹8 L/yr

Deputy Manager
11 salaries
unlock blur

₹6 L/yr - ₹9.4 L/yr

Executive Accountant
11 salaries
unlock blur

₹2.4 L/yr - ₹3.8 L/yr

Manager
8 salaries
unlock blur

₹7.2 L/yr - ₹18 L/yr

Billing Engineer
8 salaries
unlock blur

₹2.2 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Suncity Projects with

DLF

4.0
Compare

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

Sobha

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview